Council planning record

Alterations to existing buildings including demolition of a small part of Unit 7 and erection of new buildings close to site entranc gates along Voltaire Road , roof works including partial new roof to Unit 6 and Unit 1b, creation of new window and door openings, addition of canopy, erection of external lightweight structures to accommodate bikes and buggys, landscaping and other associated works in connection with the authorised use as a multi-level leisure facility (Use Class E).

26-32 Clapham North Business Centre Voltaire Road London Lambeth SW4 6DH

DecidedReference: 25/03911/FULLondon Borough of Lambeth

Application location

26-32 Clapham North Business Centre Voltaire Road London Lambeth SW4 6DH

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
17 Dec 2025
Validated
15 Jan 2026
Determination deadline
Not published
Local authority
London Borough of Lambeth

Application overview

Alterations to existing buildings including demolition of a small part of Unit 7 and erection of new buildings close to site entranc gates along Voltaire Road , roof works including partial new roof to Unit 6 and Unit 1b, creation of new window and door openings, addition of canopy, erection of external lightweight structures to accommodate bikes and buggys, landscaping and other associated works in connection with the authorised use as a multi-level leisure facility (Use Class E).

Proposal details

Reference
25/03911/FUL
Ward
Clapham Town
Agent
CBRE Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 102 of 102

DocumentPublishedAction
LANDSCAPE MASTERPLAN-WITH VEHICULAR TRACKING.Plans · PDF13 Apr 2026View
LANDSCAPE MASTERPLANPlans · PDF13 Apr 2026View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMSupporting Docs · PDF17 Dec 2025View
PLANNING STATEMENTPlanning Statement · PDF17 Dec 2025View
CONSTRUCTION DUST MANAGEMENT PLANSupporting Docs · PDF17 Dec 2025View
SUSTAINABILITY APPRAISALSupporting Docs · PDF17 Dec 2025View
DEMOLITION LEVEL 00 DETAILED GA 2OF2Plans · PDF17 Dec 2025View
PROPOSED LEVEL 00 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
EXISTING ROOF OVERVIEW GAPlans · PDF17 Dec 2025View
DEMOLITION ROOF DETAILED GA 2OF2Plans · PDF17 Dec 2025View
PROPOSED FRONT ENTRANCE ELEVATIONPlans · PDF17 Dec 2025View
PROPOSED UNITS 6 AND 7 REAR ELEVATIONPlans · PDF17 Dec 2025View
LUFTWAFFE TARGET/RECONNAISSANCE PHOTOGRAPHPlans · PDF17 Dec 2025View
NETWORK RAIL PLAN INFORMATIONPlans · PDF17 Dec 2025View
FLOOD PLANSPlans · PDF17 Dec 2025View
APPENDIX H - ASBESTOS SURVEYPlans · PDF17 Dec 2025View
FLOOD RISK ASSESSMENTSupporting Docs · PDF17 Dec 2025View
EXISTING LEVEL 00 OVERVIEW GAPlans · PDF17 Dec 2025View
DEMOLITION LEVEL 01 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
DEMOLITION LEVEL 02 DETAILED GA 2OF2Supporting Docs · PDF17 Dec 2025View
EXISTING UNITS 1B AND 2 ELEVATIONSPlans · PDF17 Dec 2025View
EXISTING SECTIONS A + BPlans · PDF17 Dec 2025View
PROPOSED FRONT ENTRANCE DETAILED ELEVATIONPlans · PDF17 Dec 2025View
APPENDIX E THIRD PARTY DATASupporting Docs · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
CONSTRUCTION MANAGEMENT PLANSupporting Docs · PDF17 Dec 2025View
FLOOD PLANSPlans · PDF17 Dec 2025View
REMEDIATION STRATEGY AND VERIFICATION PLANSupporting Docs · PDF17 Dec 2025View
VERIFICATION CHECKLISTSupporting Docs · PDF17 Dec 2025View
EXISTING LEVEL 01 OVERVIEW GAPlans · PDF17 Dec 2025View
DEMOLITION LEVEL 01 DETAILED GA 2OF2Plans · PDF17 Dec 2025View
DEMOLITION LEVEL 02 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
PROPOSED LEVEL 02 OVERVIEW GAPlans · PDF17 Dec 2025View
PROPOSED LEVEL 02 DETAILED GA 2OF2Plans · PDF17 Dec 2025View
PROPOSED UNITS 1A AND 1B ELEVATIONSPlans · PDF17 Dec 2025View
PROPOSED UNITS 6 AND 7 DETAILED ELEVATIONSPlans · PDF17 Dec 2025View
PROPOSED UNIT 1B DETAILED ELEVATIONSPlans · PDF17 Dec 2025View
NATIONAL GRID PLANSPlans · PDF17 Dec 2025View
HISTORICAL NATIONAL GRID PLANSPlans · PDF17 Dec 2025View
AIR QUALITY ASSESSMENTSupporting Docs · PDF17 Dec 2025View
APPENDIX C - PHOTOGRAPHSPhoto · PDF17 Dec 2025View
BOREHOLE LOGSupporting Docs · PDF17 Dec 2025View
FLOOD RISK ASSESSMENTSupporting Docs · PDF17 Dec 2025View
VENTILATION OR EXTRACTION STATEMENTPlans · PDF17 Dec 2025View
PROPOSED LEVEL 00 DETAILED GA 2OF2Plans · PDF17 Dec 2025View
PROPOSED LEVEL 02 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
EXISTING UNITS 4 TO 7 ELEVATIONSPlans · PDF17 Dec 2025View
DEMOLITION UNITS 1B AND 2 ELEVATIONSPlans · PDF17 Dec 2025View
PROPOSED UNIT 2 DETAILED ELEVATIONSPlans · PDF17 Dec 2025View
COUNTY SERIESPlans · PDF17 Dec 2025View
DRAWING ISSUE SHEETSupporting Docs · PDF17 Dec 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF17 Dec 2025View
FIRE STATEMENTSupporting Docs · PDF17 Dec 2025View
FLOOD RISK ASSESSMENTSupporting Docs · PDF17 Dec 2025View
LANDSCAPING DETAILSPlans · PDF17 Dec 2025View
TRANSPORT ASSESSMENTSupporting Docs · PDF17 Dec 2025View
VENTILATION OR EXTRACTION STATEMENTPlans · PDF17 Dec 2025View
EXISTING FRONT ENTRANCE ELEVATIONPlans · PDF17 Dec 2025View
EXISTING UNITS 6 AND 7 REAR ELEVATIONPlans · PDF17 Dec 2025View
DEMOLITION UNITS 1A AND 1B ELEVATIONSPlans · PDF17 Dec 2025View
DEMOLITION SECTIONS A + BPlans · PDF17 Dec 2025View
BLOCK PLAN OF THE SITEPlans · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
HISTORICAL MAPSPlans · PDF17 Dec 2025View
HISTORICAL MAPSPlans · PDF17 Dec 2025View
NOISE IMPACT ASSESSMENTSupporting Docs · PDF17 Dec 2025View
TRAFFIC MANAGEMENT & LOGISTICS PLANSupporting Docs · PDF17 Dec 2025View
PROPOSED LEVEL 01 OVERVIEW GAPlans · PDF17 Dec 2025View
EXISTING LEVEL 02 OVERVIEW GAPlans · PDF17 Dec 2025View
EXISTING UNITS 1A AND 1B ELEVATIONSPlans · PDF17 Dec 2025View
DEMOLITION FRONT ENTRANCE ELEVATIONPlans · PDF17 Dec 2025View
PHASE 1 AND PHASE 2 GEO-ENVIRONMENTAL AND GEOTECHNICAL INTERPRETIVE REPORTSupporting Docs · PDF17 Dec 2025View
RECENT SITE HISTORYPhoto · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
ARCHAEOLOGICAL ASSESSMENTSupporting Docs · PDF17 Dec 2025View
COVERING LETTERSupporting Docs · PDF17 Dec 2025View
CONSTRUCTION MANAGEMENT PLANSupporting Docs · PDF17 Dec 2025View
DAYLIGHT OR SUNLIGHT ASSESSMENTSupporting Docs · PDF17 Dec 2025View
ECOLOGICAL APPRAISAL AND BAT SURVEYSupporting Docs · PDF17 Dec 2025View
DEMOLITION LEVEL 00 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
PROPOSED LEVEL 00 OVERVIEW GAPlans · PDF17 Dec 2025View
THE LOCATION PLANOS Map · PDF17 Dec 2025View
DEMOLITION ROOF DETAILED GA 1OF2Plans · PDF17 Dec 2025View
PROPOSED UNITS 4 TO 7 ELEVATIONSPlans · PDF17 Dec 2025View
PROPOSED UNITS 1B AND 2 ELEVATIONSPlans · PDF17 Dec 2025View
OTHER RELEVANT INFORMATIONPlans · PDF17 Dec 2025View
ENVIROLAB RESULTS TABLESupporting Docs · PDF17 Dec 2025View
HISTORICAL MAPSPlans · PDF17 Dec 2025View
ORDNANCE SURVEY PLANPlans · PDF17 Dec 2025View
NOISE IMPACT ASSESSMENTSupporting Docs · PDF17 Dec 2025View
TRANSPORT ASSESSMENTSupporting Docs · PDF17 Dec 2025View
PROPOSED LEVEL 01 DETAILED GA 1OF2Plans · PDF17 Dec 2025View
PROPOSED LEVEL 01 DETAILED GA 2OF2Plans · PDF17 Dec 2025View
DEMOLITION UNITS 4 TO 7 ELEVATIONSPlans · PDF17 Dec 2025View
DEMOLITION UNITS 6 AND 7 REAR ELEVATIONPlans · PDF17 Dec 2025View
PROPOSED SECTIONS A + BPlans · PDF17 Dec 2025View
ARTIFICIAL AND MADE GROUNDPlans · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View
DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF17 Dec 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Permission
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.