Council planning record

Application for a non-material amendment following a grant of planning permission 24/04003/FUL (Redevelopment of the site comprising demolition of all structures associated with the petrol filling station, and development of two linked towers, in addition to basement levels, consisting of student accommodation with associated amenity space (Use Class Sui Generis) together with cafe and flexible incubator (Use Class E) / cultural space (Use Class Sui Generis), with provision of associated cycle parking, access and other associated works; and the retention, refurbishment and vertical extension to Vintage House (Use Class E) and other associated works, on a phased basis) granted on 21.11.2025.

36-46 Albert Embankment London SE1 7TL

DecidedReference: 25/03645/NMCLondon Borough of Lambeth

Last published check: 10 Oct 2026, 09:13. Check the council record for more recent changes.

Application location

36-46 Albert Embankment London SE1 7TL

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Non Material Change - Minor Amendment
Received
24 Nov 2025
Validated
24 Nov 2025
Determination deadline
Not published
Local authority
London Borough of Lambeth

Application overview

Application for a non-material amendment following a grant of planning permission 24/04003/FUL (Redevelopment of the site comprising demolition of all structures associated with the petrol filling station, and development of two linked towers, in addition to basement levels, consisting of student accommodation with associated amenity space (Use Class Sui Generis) together with cafe and flexible incubator (Use Class E) / cultural space (Use Class Sui Generis), with provision of associated cycle parking, access and other associated works; and the retention, refurbishment and vertical extension to Vintage House (Use Class E) and other associated works, on a phased basis) granted on 21.11.2025.

Proposal details

Reference
25/03645/NMC
Ward
Vauxhall
Agent
Newmark

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 41 of 41

DocumentPublishedAction
Decision NoticeDecision Notice · PDF8 Dec 2025View
Delegated RegisterDelegated Register · PDF5 Dec 2025View
PROPOSED NORTH ELEVATIONPlans · PDF24 Nov 2025View
TOWER TYPICAL FLANK FACADEPlans · PDF24 Nov 2025View
PROPOSED L08-19 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED SECTION AAPlans · PDF24 Nov 2025View
ADDENDUM TO ENERGY AND OVERHEATING STATEMENTSupporting Docs · PDF24 Nov 2025View
DESIGN AND ACCESS STATEMENT ADDENDUMSupporting Docs · PDF24 Nov 2025View
SOUTH TOWER TYPICAL WEST FACADEPlans · PDF24 Nov 2025View
DRAWING TITLESupporting Docs · PDF24 Nov 2025View
PROPOSED L21 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED B2 BASEMENT FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L26-28 FLOOR PLANPlans · PDF24 Nov 2025View
ADDENDUM TO ENERGY AND OVERHEATING STATEMENTSupporting Docs · PDF24 Nov 2025View
DAYLIGHT AND SUNLIGHTSupporting Docs · PDF24 Nov 2025View
PROPOSED L01 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L20 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED B1 BASEMENT FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED GROUND FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L22 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L23 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED SOUTH ELEVATIONPlans · PDF24 Nov 2025View
PROPOSED EAST ELEVATIONPlans · PDF24 Nov 2025View
NORTH TOWER TYPICAL EAST FACADEPlans · PDF24 Nov 2025View
NORTH TOWER TYPICAL WEST FACADEPlans · PDF24 Nov 2025View
PROPOSED SITE PLANPlans · PDF24 Nov 2025View
PROPOSED L04-05 FLOOR PLANPlans · PDF24 Nov 2025View
COVERING LETTERSupporting Docs · PDF24 Nov 2025View
CENTRAL LINK TYPICAL FACADEPlans · PDF24 Nov 2025View
STUDENT BUILDING FIRE STATEMENTSupporting Docs · PDF24 Nov 2025View
PROPOSED L02-03 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L07 FLOOR PLANPlans · PDF24 Nov 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF24 Nov 2025View
PROPOSED L24 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L25 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED SECTION DD AND EEPlans · PDF24 Nov 2025View
PROPOSED WEST ELEVATIONPlans · PDF24 Nov 2025View
PROPOSED L06 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED L29 FLOOR PLANPlans · PDF24 Nov 2025View
PROPOSED SECTION BB AND CCPlans · PDF24 Nov 2025View
ADDENDUM TO ENERGY AND OVERHEATING STATEMENTSupporting Docs · PDF24 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Grant Permission
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.