ApprovedCouncil status: Decided

Observations on a proposed development within the adjoining Borough of Bromley with respect to 'Details of reserved matters (access, appearance, landscape, scale and layout) for the residential sites known as Rockhills and Sydenham Villas, parts of Phases 2a and 2b of the Crystal Palace Park regeneration development, pursuant to Condition 1 of outline planning permission 20/000325/OUT, for the demolition of existing buildings and the construction of new residential buildings (Use Class C3) at Rockhills and Sydenham Villas comprising of 202 homes, including a Community Centre at Rockhills, alterations to hard surfaces, ground levels and tree removal; landscaping enhancements; provision and rearrangement of pedestrian paths/vehicular access routes, car and cycle parking, drainage and ground works, and other associated works' at Crystal Palace Park, Thicket Road, Penge, London, SE20 8DT [App ref; 25/04937/RES]

Adjoining Borough Observations Within Bromley

London Borough of LambethReference 25/03371/OBSObservations from adjoining Borough

Last published check: 26 Oct 2026, 09:56. Check the council record for more recent changes.

Open council website

Status and dates

Last published check: 26 Oct 2026, 09:56 (UK)

  1. DoneReceived28 Oct 2025
  2. DoneValidated28 Oct 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGrant Permission5 Nov 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
Application type
Observations from adjoining Borough
Documents
2 published

Proposal

Observations on a proposed development within the adjoining Borough of Bromley with respect to 'Details of reserved matters (access, appearance, landscape, scale and layout) for the residential sites known as Rockhills and Sydenham Villas, parts of Phases 2a and 2b of the Crystal Palace Park regeneration development, pursuant to Condition 1 of outline planning permission 20/000325/OUT, for the demolition of existing buildings and the construction of new residential buildings (Use Class C3) at Rockhills and Sydenham Villas comprising of 202 homes, including a Community Centre at Rockhills, alterations to hard surfaces, ground levels and tree removal; landscaping enhancements; provision and rearrangement of pedestrian paths/vehicular access routes, car and cycle parking, drainage and ground works, and other associated works' at Crystal Palace Park, Thicket Road, Penge, London, SE20 8DT [App ref; 25/04937/RES]

Reference
25/03371/OBS
Agent
Planning - Bromley Council

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • OFFICER'S REPORTDelegated Register5 Nov 2025View
  • Decision NoticeDecision Notice5 Nov 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant Permission
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.