Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Land Bounded By Wandsworth Road, Parry Street, Bondway, Miles Street And Railway Viaduct London SW8
Land Bounded By Wandsworth Road, Parry Street, Bondway, Miles Street And Railway Viaduct London SW8
This record has no verified map location.
View council mapPhased redevelopment of the site including demolition of all existing buildings and structures to erect up to 7 buildings ranging from three to 69 storeys plus basements for a range of land uses comprising residential (Class C3), purpose built shared living (Sui Generis), purpose built student accommodation (Sui Generis), flexible town centre uses/commercial (Class E(a), (b), (d), (e)), community/health uses (Class F2/E(e)), office (Class E(g)) and/or hotel (Class C1), cinema (Sui Generis), soft and hard landscaping, play space, pedestrian and vehicular access, cycle parking, car parking and all other works associated with the development.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| PLOT 7 PLANS, ELEVATIONS AND SECTIONS (REV 1)Plans - Revised · PDF | 4 Sept 2026 | View |
| MASTERPLAN PLANS - GROUND PLANPlans - Revised · PDF | 4 Sept 2026 | View |
| MASTERPLAN PLAN - BASEMENTPlans - Revised · PDF | 4 Sept 2026 | View |
| MASTERPLAN PLANS - BASEMENT MEZZANINE PLANPlans - Revised · PDF | 4 Sept 2026 | View |
| MASTERPLAN PLANS - MEZZANINE PLANPlans - Revised · PDF | 4 Sept 2026 | View |
| COMMENTS - PBSA PIL REVIEW FOR COUNCIL BY QUINTIC ADVISORY (SEPT 2026 - FINAL VESupporting Docs · PDF | 1 Sept 2026 | View |
| PLOT DIAGRAMPlans · PDF | 25 Aug 2026 | View |
| PBSA HEP LINKAGE AND UNIT SIZE JUSTIFICATIONSupporting Docs · PDF | 25 Aug 2026 | View |
| HIGHWAYS WORKS WITH GYRATORY SCHEMEPlans - Revised · PDF | 20 Aug 2026 | View |
| LANDSCAPING SITE PLANPlans - Revised · PDF | 20 Aug 2026 | View |
| PBSA PIL (NOW SUPERSEDED)Documents - Revised · PDF | 20 Aug 2026 | View |
| COMMENTS - REVIEW FOR COUNCIL ON CO-LIVING PIL - BNPP (NOW QUINTIC)Supporting Docs · PDF | 20 Aug 2026 | View |
| MAIN SITE ENABLING WORKS PLANSupporting Docs · PDF | 20 Aug 2026 | View |
| PBSA PAYMENT IN LIEU CALCULATION (UPDATED)Documents - Revised · PDF | 20 Aug 2026 | View |
| PBSA PAYMENT IN LIEU CALCULATION (UPDATED) - 100% MARKET APPRAISALDocuments - Revised · PDF | 20 Aug 2026 | View |
| HIGHWAYS WORKS WITHOUT GYRATORY SCHEMEPlans - Revised · PDF | 20 Aug 2026 | View |
| PBSA PAYMENT IN LIEU CALCULATION (UPDATED) - 35% AH APPRAISALDocuments - Revised · PDF | 20 Aug 2026 | View |
| EIA STATEMENT OF CONFORMITY (AMENDED)Documents - Revised · PDF | 4 Aug 2026 | View |
| COMMENTS - ES REVIEW FOR COUNCIL (BURO HAPPOLD) R04Supporting Docs · PDF | 4 Aug 2026 | View |
| COMMENTS - BSR RESPONSESupporting Docs · PDF | 23 Jul 2026 | View |
| COMMENTS - REVIEW FOR THE COUNCIL ON PBSA PIL AND METHODOLOGY - QUINTIC (JULY 20Supporting Docs · PDF | 22 Jul 2026 | View |
| COMMENTS - REVIEW FOR COUNCIL ON PLOT LINKAGES PROPOSAL - QUINTIC (JULY 2026)Supporting Docs · PDF | 22 Jul 2026 | View |
| COMMENTS - HISTORIC ENGLAND (JULY 2026)Supporting Docs · PDF | 1 Jul 2026 | View |
| PLOT 1 TYPICAL PIPEWORK LAYOUT (FOR DHN)Documents - Revised · PDF | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 2Documents - Revised | 26 Jun 2026 | View |
| ENERGY MEMODocuments - Revised | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 1Documents - Revised | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 4Documents - Revised | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 6Documents - Revised | 26 Jun 2026 | View |
| PASSIVHAUS FEASIBILITY STUDYDocuments - Revised · PDF | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 5Documents - Revised | 26 Jun 2026 | View |
| ENERGY STATEMENT REV. 7 (EXCLUDING APPENDICES)Documents - Revised · PDF | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - SITEWIDEDocuments - Revised | 26 Jun 2026 | View |
| ENERGY STATEMENT REV. 7 (APPENDICES)Documents - Revised · PDF | 26 Jun 2026 | View |
| CARBON EMISSIONS REPORTING SPREADSHEET - PLOT 3Documents - Revised | 26 Jun 2026 | View |
| RESPONSE TO GLA ENERGY COMMENTS-P0Documents - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 51 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN SECTIONS - PROPOSED SECTIONS NSPlans - Revised · PDF | 19 Jun 2026 | View |
| REVISED AREA SCHEDULE AND UNIT MIX JUNE 2026Documents - Revised · PDF | 19 Jun 2026 | View |
| PLOT 1 SECTIONS (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 3 -SECTION NORTH TO SOUTHPlans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 4 -NORTH TO SOUTH SECTIONPlans - Revised · PDF | 19 Jun 2026 | View |
| PLOT 1 TYPICAL RESIDENTIAL FLOOR LTHW COMMUNAL HEATING PIPEWORK LAYOUTPlans - Revised · PDF | 19 Jun 2026 | View |
| PLOT 4 SECTION (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| DRAWING SCHEDULE JUNE 2026Plans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN SECTIONS - PROPOSED SECTION NEPlans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 3 -SECTION EAST TO WESTPlans - Revised · PDF | 19 Jun 2026 | View |
| 2ND AMENDMENT COVER LETTERPlanning Statement · PDF | 19 Jun 2026 | View |
| PLOT 3 SECTION (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| DISTRICT HEATING NETWORK READINESS AND REVISED ENERGY STRATEGYDocuments - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 47 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| MASTERPLAN SECTIONS (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 05 -SOUTHEAST TO NORTHWEST SECTIONPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 49 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 03 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| MASTERPLAN PLANS ABOVE GROUND (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 05 -NORTH TO SOUTH SECTIONPlans - Revised · PDF | 19 Jun 2026 | View |
| AFFORDABLE HOUSING STATEMENT (REV4)Documents - Revised · PDF | 19 Jun 2026 | View |
| DESIGN AND ACCESS STATEMENT SECOND ADDENDUMDesign & Access Statement · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 46 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 18 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 15 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| 12-GENERAL ARRANGEMENT SECTIONS - PLOT 1 -NORTH TO SOUTHPlans - Revised · PDF | 19 Jun 2026 | View |
| ADDITIONAL CIL INFORMATION FORMDocuments - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 17 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| PLOT 5 SECTIONS (AMENDED)Plans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN - LEVEL 48 FLOOR PLANPlans - Revised · PDF | 19 Jun 2026 | View |
| GENERAL ARRANGEMENT MASTERPLAN SECTIONS - PROPOSED SECTION EWPlans - Revised · PDF | 19 Jun 2026 | View |
| COMMENTS - REVIEW FOR COUNCIL ON COST PLAN FOR MAIN SITE ENABLING WORKS (STACE)Supporting Docs · PDF | 1 Jun 2026 | View |
| COMMENTS - WESTMINSTER COMMENTS (APRIL 2026)Supporting Docs · PDF | 13 Apr 2026 | View |
| COMMENTS - WANDSWORTH COMMENTS - REPORTSupporting Docs · PDF | 8 Apr 2026 | View |
| MASTERPLAN ELEVATIONS AND SECTIONS (AMENDED)Plans - Revised · PDF | 9 Mar 2026 | View |
| MASTERPLAN PLANS BASEMENT - F46 (AMENDED)Plans - Revised · PDF | 9 Mar 2026 | View |
| MASTERPLAN PLANS F47-ROOF (AMENDED)Plans - Revised · PDF | 9 Mar 2026 | View |
| APPLICANT RESPONSE TO QUINTIC'S PBSA PIL REVIEW (YIELD)Supporting Docs · PDF | 9 Mar 2026 | View |
| APPLICANT RESPONSE TO PBSA PIL METHODOLOGYSupporting Docs · PDF | 9 Mar 2026 | View |
| APPLICANT RESPONSE ON PLOT LINKAGESSupporting Docs · PDF | 9 Mar 2026 | View |
| PLOT 6 PLANS (AMENDED)Plans - Revised · PDF | 4 Mar 2026 | View |
| INDICATIVE LAYOUT PLOT 6 - CO-LIVINGSupporting Docs · PDF | 4 Mar 2026 | View |
| PLOT 5 PLANS (AMENDED)Plans - Revised · PDF | 4 Mar 2026 | View |
| MASTERPLAN PLANS (AMENDED)Plans - Superseded · PDF | 4 Mar 2026 | View |
| INDICATIVE LAYOUT PLOT 6 - RESIDENTIALSupporting Docs · PDF | 4 Mar 2026 | View |
| PLOT 3 PLANS (AMENDED)Plans - Revised · PDF | 4 Mar 2026 | View |
| INDICATIVE S278 WORKS AND LANDSCAPING (AMENDED)Plans - Revised · PDF | 4 Mar 2026 | View |
| COMMENTS - REVIEW FOR COUNCIL ON PBSA PIL - BNPP (NOW QUINTIC) (FEB 2026)Supporting Docs · PDF | 20 Feb 2026 | View |
| COMMENTS - TFL - RE-CONSULTATIONSupporting Docs · PDF | 19 Feb 2026 | View |
| COMMENTS - LFBSupporting Docs · PDF | 10 Feb 2026 | View |
| ENERGY STATEMENT - P06Documents - Revised · PDF | 4 Feb 2026 | View |
| COMMENTS - DSO REVIEW FOR COUNCIL (DELVA PATMAN REDLER) - FINAL REVIEW JAN 2026Supporting Docs · PDF | 30 Jan 2026 | View |
| PBSA - PIL NOTEDocuments - Revised · PDF | 30 Jan 2026 | View |
| COMMENTS - MET POLICE (SBD)Supporting Docs | 23 Jan 2026 | View |
| PLOT 5 - BASEMENT (REVISED)Plans - Superseded · PDF | 23 Jan 2026 | View |
| PLOT 3 - BASEMENT (REVISED)Plans - Superseded · PDF | 23 Jan 2026 | View |
| DSO - SUPPLEMENTARY REPORT - BRUNSWICK HOUSEDocuments - Revised · PDF | 23 Jan 2026 | View |
| PLOT 3 - BASEMENT MEZZANINE (REVISED)Plans - Superseded · PDF | 23 Jan 2026 | View |
| MASTERPLAN DRAWINGS - PLANS (AMENDED)Plans - Superseded · PDF | 23 Jan 2026 | View |
| ES - VOL 3: DSOSG APPENDICES ADDENDUM (BRUNSWICK HOUSE)Documents - Revised · PDF | 22 Jan 2026 | View |
| KOV NEIGHBOURHOOD PLAN VIEW ASSESSMENTDocuments - Revised · PDF | 21 Jan 2026 | View |
| BASEMENT IMPACT ASSESSMENT (AMENDED)Documents - Revised · PDF | 21 Jan 2026 | View |
| FIRE STRATEGYDocuments - Revised · PDF | 21 Jan 2026 | View |
| ES RESPONSE - TRIUM COVERING LETTER (09.01.26)Documents - Revised · PDF | 21 Jan 2026 | View |
| MASTERPLAN DRAWINGS - ELEVATIONS AND SECTIONS (AMENDED)Plans - Superseded · PDF | 21 Jan 2026 | View |
| COVER LETTER FOR AMENDMENTS (21.01.26)Documents - Revised · PDF | 21 Jan 2026 | View |
| DAS - PLOT 6 ADDENDUMDesign & Access Statement · PDF | 21 Jan 2026 | View |
| ES - NON-TECHNICAL SUMMARY (AMENDED)Documents - Revised · PDF | 21 Jan 2026 | View |
| ES VOLUME 1, CHAPTER 11: DAYLIGHT, SUNLIGHT, OVERSHADOWING AND SOLAR GLARE (AMENDocuments - Revised · PDF | 21 Jan 2026 | View |
| CIL FORM ADDENDUMDocuments - Revised · PDF | 21 Jan 2026 | View |
| APPLICATION FORM ADDENDUMDocuments - Revised · PDF | 21 Jan 2026 | View |
| CIRCULAR ECONOMY STATEMENT (REVISED)Documents - Revised · PDF | 21 Jan 2026 | View |
| APPLICANT RESPONSE TO TFL COMMENTSDocuments - Revised · PDF | 21 Jan 2026 | View |
| PLOT 6 DRAWINGS - PLANS (AMENDED)Plans - Superseded · PDF | 21 Jan 2026 | View |
| RESIDENTIAL WATER EFFICIENCY CALCULATIONDocuments - Revised · PDF | 21 Jan 2026 | View |
| AREA SCHEDULE ADDENDUM - PLOT 6 AMENDMENTSDocuments - Revised · PDF | 21 Jan 2026 | View |
| AIR QUALITY CLARIFICATION RESPONSESDocuments - Revised · PDF | 21 Jan 2026 | View |
| ES VOLUME 1, CHAPTER 16: LIKELY SIGNIFICANT EFFECTS (AMENDED)Documents - Revised · PDF | 21 Jan 2026 | View |
| PLOT 6 DRAWINGS - ELEVATIONS AND SECTIONS (AMENDED)Plans - Revised · PDF | 21 Jan 2026 | View |
| COMMENTS - DSO REVIEW FOR COUNCIL (DPR - INITIAL)Supporting Docs · PDF | 12 Dec 2025 | View |
| COMMENTS - NHSSupporting Docs · PDF | 12 Dec 2025 | View |
| COMMENTS - HSE (FINAL)Supporting Docs · PDF | 11 Dec 2025 | View |
| COMMENTS - NETWORK RAILSupporting Docs | 8 Dec 2025 | View |
| COMMENTS - EASupporting Docs · PDF | 2 Dec 2025 | View |
| COMMENTS - TFLSupporting Docs · PDF | 1 Dec 2025 | View |
| COMMENTS - CITY OF LONDONSupporting Docs · PDF | 27 Nov 2025 | View |
| COMMENTS - GLA STAGE 1 REPORTSupporting Docs · PDF | 25 Nov 2025 | View |
| COMMENTS - GLA STAGE 1 LETTERSupporting Docs · PDF | 25 Nov 2025 | View |
| COMMENTS - NATURAL ENGLANDSupporting Docs · PDF | 17 Nov 2025 | View |
| COMMENTS - NATURAL ENGLAND - ANNEX ASupporting Docs · PDF | 17 Nov 2025 | View |
| COMMENTS - SOUTHWARKSupporting Docs · PDF | 13 Nov 2025 | View |
| COMMENTS - HSESupporting Docs · PDF | 11 Nov 2025 | View |
| COMMENTS - LONDON HELIPORTSupporting Docs · PDF | 7 Nov 2025 | View |
| COMMENTS - LUSupporting Docs | 31 Oct 2025 | View |
| COMMENTS - POLICE - ESTATE STRATEGYSupporting Docs | 30 Oct 2025 | View |
| COMMENTS - ATESupporting Docs | 23 Oct 2025 | View |
| COMMENTS - EH ARCHEOLOGYSupporting Docs · PDF | 21 Oct 2025 | View |
| COMMENTS - NATSSupporting Docs | 21 Oct 2025 | View |
| COMMENTS - HE ARCHAEOLOGY COMMENTSSupporting Docs · PDF | 20 Oct 2025 | View |
| AFFORDABLE HOUSING STATEMENTSupporting Docs · PDF | 16 Oct 2025 | View |
| PLOT 5 PROPOSED DRAWINGS PACK (PLANS)Plans - Superseded · PDF | 13 Oct 2025 | View |
| PART 17Design & Access Statement · PDF | 9 Oct 2025 | View |
| PART 15Design & Access Statement · PDF | 9 Oct 2025 | View |
| EMPLOYMENT AND SKILLS PLANSupporting Docs · PDF | 9 Oct 2025 | View |
| PART 21Design & Access Statement · PDF | 9 Oct 2025 | View |
| STATEMENT OF COMMUNITY INVOLVEMENTSupporting Docs · PDF | 9 Oct 2025 | View |
| PART 18Design & Access Statement · PDF | 9 Oct 2025 | View |
| CO-LIVING OPERATIONAL MANAGEMENT PLANSupporting Docs · PDF | 9 Oct 2025 | View |
| PART 16Design & Access Statement · PDF | 9 Oct 2025 | View |
| PART 14Design & Access Statement · PDF | 9 Oct 2025 | View |
| ENERGY STATEMENT & OVERHEATING ASSESSMENT (SUPERSEDED)Supporting Docs · PDF | 9 Oct 2025 | View |
| PART 20Design & Access Statement · PDF | 9 Oct 2025 | View |
| PART 13Design & Access Statement · PDF | 9 Oct 2025 | View |
| PART 19Design & Access Statement · PDF | 9 Oct 2025 | View |
| PART 22Design & Access Statement · PDF | 9 Oct 2025 | View |
| EXISTING PLAN - EXISTING SITE BLOCK PLANPlans · PDF | 8 Oct 2025 | View |
| MASTERPLAN PROPOSED DRAWINGS PACK (ELEVATIONS AND SECTIONS)Plans · PDF | 8 Oct 2025 | View |
| PLOT 2 PROPOSED DRAWINGS PACKPlans · PDF | 8 Oct 2025 | View |
| PART 06Design & Access Statement · PDF | 8 Oct 2025 | View |
| PLOT 3 PROPOSED DRAWINGS PACK (ELEVATIONS AND SECTIONS)Plans · PDF | 8 Oct 2025 | View |
| PART 02Design & Access Statement · PDF | 8 Oct 2025 | View |
| PLOT 1 PROPOSED DRAWINGS PACK (ELEVATIONS)Plans · PDF | 8 Oct 2025 | View |
| PLOT 4 PROPOSED DRAWINGS PACK (SECTIONS)Plans · PDF | 8 Oct 2025 | View |
| DRAWING SCHEDULESupporting Docs · PDF | 8 Oct 2025 | View |
| PHASING PLANSPlans · PDF | 8 Oct 2025 | View |
| MASTERPLAN PROPOSED PLANS_BASEMENT TO LEVEL 17Plans - Superseded · PDF | 8 Oct 2025 | View |
| MASTERPLAN PROPOSED PLANS_LEVEL 18 TO LEVEL 55Plans - Superseded · PDF | 8 Oct 2025 | View |
| PART 10Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 11Design & Access Statement · PDF | 8 Oct 2025 | View |
| DEMOLITION PLAN - EXISTING SITE PLAN WITH DEMOLITION EXTENTPlans · PDF | 8 Oct 2025 | View |
| Planning StatementPlanning Statement · PDF | 8 Oct 2025 | View |
| PLOT 4 PROPOSED DRAWINGS PACK (ELEVATIONS)Plans · PDF | 8 Oct 2025 | View |
| PART 03Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 05Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 08Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 01Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 07Design & Access Statement · PDF | 8 Oct 2025 | View |
| PART 12Design & Access Statement · PDF | 8 Oct 2025 | View |
| MASTERPLAN PROPOSED PLANS_LEVEL 56-ROOFPlans - Superseded · PDF | 8 Oct 2025 | View |
| PLOT 1 PROPOSED DRAWINGS PACK (SECTIONS)Plans · PDF | 8 Oct 2025 | View |
| PLOT 3 PROPOSED DRAWINGS PACK (PLANS)Plans - Superseded · PDF | 8 Oct 2025 | View |
| PART 04Design & Access Statement · PDF | 8 Oct 2025 | View |
| SITE LOCATION PLANOS Map · PDF | 8 Oct 2025 | View |
| PLOT 4 PROPOSED DRAWINGS PACK (PLANS)Plans · PDF | 8 Oct 2025 | View |
| PLOT 5 PROPOSED DRAWINGS PACK (ELEVATIONS AND SECTIONS)Plans · PDF | 8 Oct 2025 | View |
| PLOT 6 PROPOSED DRAWINGS PACKPlans - Superseded · PDF | 8 Oct 2025 | View |
| PLOT 1 PROPOSED DRAWINGS PACK (PLANS)Plans · PDF | 8 Oct 2025 | View |
| PART 09Design & Access Statement · PDF | 8 Oct 2025 | View |
| ESVOL1_CH02_EIA METHODOLOGYSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH05_ENABLING AND CONSTRUCTIONSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH06_SOCIOECONOMICSSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH15_EFFECT INTERACTIONSSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH17_MITIGATION MONITORING SCHEDULESupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A16Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_ECOLOGY_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_EIA METHODOLOGY_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_NOISE AND VIBRATION_A4Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_NOISE AND VIBRATION_A5Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH01_INTRODUCTIONSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH14_GROUND CONDITIONSSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH16_LIKELY SIGNIFICANT EFFECTS (SUPERSEDED)Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A4Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A5Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A4Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A10Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A17Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_NOISE AND VIBRATION_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH03_ALTERNATIVE SAND DESIGN EVOLUTIONSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH04_THE PROPOSED DEVELOPMENTSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A4Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A9Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A11Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A13Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A6Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A8Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A7Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_EIA METHODOLOGY_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_ENABLING AND CONSTRUCTION_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_ENABLING CONSTRUCTION_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_INTRODUCTION_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_NOISE AND VIBRATION_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH07_HEALTHSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH13_CLIMATE CHANGESupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A10Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A9Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A6Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A9Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A11Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_INTRODUCTION_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| EESVOL3_APPENDIX_WIND MICROCLIMATE_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH10_NOISE VIBRATIONSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH11_DAYLIGHT, SUNLIGHT, OVERSHADOWING AND SOLAR GLARE (SUPERSEDED)Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A5Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A8Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_ARCHAEOLOGY_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A8Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A12Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A15Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_HEALTH AND WELLBEING_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_INTRODUCTION_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_SOCIO-ECONOMICS_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_SOCIO-ECONOMICS_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ES_NONTECHNICALSUMMARY (SUPERSEDED)Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH08_TRAFFIC MOVEMENTSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH12_WIND MICROCLIMATESupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_SOCIO-ECONOMICS_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL1_CH09_AIR QUALITYSupporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A6Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A7Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A13Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A14Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A19Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A21Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A25Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_ENABLING AND CONSTRUCTION_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_SOCIO-ECONOMICS_A4Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_TRAFFIC AND MOVEMENT_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_AIR QUALITY_A12Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_CLIMATE CHANGE_A7Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A18Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A20Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A23Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_EIA METHODOLOGY_A3Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_NOISE AND VIBRATION_A2Supporting Docs · PDF | 7 Oct 2025 | View |
| ESVOL3_APPENDIX_WIND MICROCLIMATE_A1Supporting Docs · PDF | 7 Oct 2025 | View |
| WHOLE LIFE CARBON ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| VENTILATION AND EXTRACTION STATEMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| STUDENT HOUSING STATEMENT AND MANAGEMENT PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| EQUALITIES STATEMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| DRAINAGE STRATEGY REPORT PART 2 OF 2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART9Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A2_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A3_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| HERITAGE IMPACT ASSESSMENT (LOW RES)Supporting Docs · PDF | 6 Oct 2025 | View |
| LANDSCAPE AND PUBLIC REALM DAS_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 3 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 4 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| URBAN GREENING FACTORSupporting Docs · PDF | 6 Oct 2025 | View |
| SUSTAINABILITY STATEMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| STUDENT LIVING NEEDS ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| FRAMEWORK TRAVEL PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HERITAGE TOWNSCAPE AND VISUAL IMPACT ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART8Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART9Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A3_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A3_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| LANDSCAPE AND PUBLIC REALM DAS_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| LANDSCAPE AND PUBLIC REALM DAS_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 3 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 4 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| SOCIO ECONOMIC IMPACT ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| LANDSCAPE GENERAL ARRANGEMENT PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| ARBORICULTURAL REPORT IMPACT ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| DRAINAGE STRATEGY REPORT PART 1 OF 2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART11Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A5_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A5_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A2_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| TRANSPORT ASSSESSMENT PART 1 OF 2Transport Statement · PDF | 6 Oct 2025 | View |
| TREE PLANTING PLANS_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 2 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| FIRE STATEMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| BASEMENT IMPACT ASSESSMENT (SUPERSEDED)Supporting Docs · PDF | 6 Oct 2025 | View |
| COVERING LETTERSupporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART10Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART5Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A3_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| HERITAGE IMPACT ASSESSMENT_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| TRANSPORT ASSSESSMENT PART 2 OF 2Transport Statement · PDF | 6 Oct 2025 | View |
| PLOT 2 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 7 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 7 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| CIRCULAR ECONOMY STATEMENT (SUPERSEDED)Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A5_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART7Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A2_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 1 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 2 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 5 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| WIND AND MICROCLIMATE CFD ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| DELIVERY AND SERVICING PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| AVIATION SAFEGUARDING ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| AREA SCHEDULESupporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART5Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART4Supporting Docs · PDF | 6 Oct 2025 | View |
| FLOOD RISK ASSESSMENT PART 1 OF 2Supporting Docs · PDF | 6 Oct 2025 | View |
| HERITAGE IMPACT ASSESSMENT_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| HERITAGE IMPACT ASSESSMENT_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 6 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 1 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 6 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| INFRASTRUCTURE IMPACT ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| CO-LIVING NEEDS ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| CIL FORM (SEE CIL FORM ADDENDUM)Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART5Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART6Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A22_PART6Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A2_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| FLOOD RISK ASSESSMENT PART 2 OF 2Supporting Docs · PDF | 6 Oct 2025 | View |
| TREE PLANTING PLANS_PART2Supporting Docs · PDF | 6 Oct 2025 | View |
| TREE PLANTING PLANS_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 3 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| PLOT 4 CES STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| OPERATIONAL WASTE MANAGEMENT STRATEGYSupporting Docs · PDF | 6 Oct 2025 | View |
| HOTEL ACCOMMODATION IMPACT ASSESSMENTSupporting Docs · PDF | 6 Oct 2025 | View |
| COMMUNITY USE MANAGEMENT PLANSupporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL2_HTVIA_PART7Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A5_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_DSO_A24_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| ESVOL3_APPENDIX_GROUND CONDITIONS_A2_PART3Supporting Docs · PDF | 6 Oct 2025 | View |
| HERITAGE IMPACT ASSESSMENT_PART1Supporting Docs · PDF | 6 Oct 2025 | View |
| PLOT 5 WLCA STATEMENT TEMPLATESupporting Docs | 6 Oct 2025 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 3 Oct 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.