Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
28 Grafton Square London Lambeth SW4 0DB
Last published check: 10 Oct 2026, 06:50. Check the council record for more recent changes.
28 Grafton Square London Lambeth SW4 0DB
This record has no verified map location.
View council mapProposed second floor rear extension, new double glazed timber sash window and new roof lights in flat roof and existing pitched main Butterly roof. Removal of existing clay tiles and replaced with traditional slates. Replacement of Two existing UPVC windows at second floor rear elevation with new double glazed timber hardwood sash style and other associated alterations.(Please note: The reference number for this Listed Building Consent application is 25/02764/LB but there is also an associated application for Full Planning Permission related to these works with reference number: 25/02763/FUL).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| OFFICERS REPORTDelegated Register · PDF | 10 Nov 2025 | View |
| Decision NoticeDecision Notice · PDF | 10 Nov 2025 | View |
| PROPOSED FIRST FLOOR AND SECOND FLOOR PLANSPlans · PDF | 2 Sept 2025 | View |
| EXISTING LOWER GROUND FLOOR AND UPPER GROUND FLOOR PLANSPlans · PDF | 2 Sept 2025 | View |
| HERITAGE STATEMENTSupporting Docs · PDF | 2 Sept 2025 | View |
| PROPOSED SECTION AA AND BBPlans · PDF | 2 Sept 2025 | View |
| DESIGN AND ACCESS STATEMENTDesign & Access Statement · PDF | 2 Sept 2025 | View |
| PROPOSED FIRST AND SECOND FLOOR PLANSPlans · PDF | 2 Sept 2025 | View |
| EXISTING SECTION AA AND BBPlans · PDF | 2 Sept 2025 | View |
| PROPOSED LOWER GROUND AND UPPER GROUND FLOOR PLANSPlans · PDF | 2 Sept 2025 | View |
| PROPOSED FRONT AND REAR ELEVATIONSPlans · PDF | 2 Sept 2025 | View |
| PROPOSED SIDE ELEVATION 2Plans · PDF | 2 Sept 2025 | View |
| EXISTING ROOF PLANPlans · PDF | 2 Sept 2025 | View |
| EXISTING SIDE ELEVATIONPlans · PDF | 2 Sept 2025 | View |
| COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMSupporting Docs · PDF | 2 Sept 2025 | View |
| PROPOSED FIRST FLOOR AND SECOND FLOOR PLANSPlans · PDF | 2 Sept 2025 | View |
| THE LOCATION PLANPlans · PDF | 2 Sept 2025 | View |
| APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF | 2 Sept 2025 | View |
| PROPOSED ROOF PLANPlans · PDF | 2 Sept 2025 | View |
| PROPOSED SIDE ELEVATIONPlans · PDF | 2 Sept 2025 | View |
| EXISTING FRONT AND REAR ELEVATIONSPlans · PDF | 2 Sept 2025 | View |
| EXISTING SIDE ELEVATIONPlans · PDF | 2 Sept 2025 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.