ApprovedCouncil status: Decided

Application for Certificate of Lawfulness (Existing) with respect to the excavation and backfilling of a foundation trench of c. 5.0m in length, 1.0m in width, and 1.0m in depth in accordance with Planning Permission ref: 15/06216/FUL (A residential led mixed use development above and surrounding the proposed Nine Elms Station comprising four buildings between 5 and 20 storeys above the station podium and ranging in height from 29m AOD to 92m AOD, providing 332 residential units (C3) comprising 1 bed, 2 bed, 3 bed and 4 bed apartments; 4,811sqm of workspace/office (B1); 272sqm of assembly and leisure (D2) and 580sqm of retail (falling within class A1/A3/A4), a new public square, amenity space, play space, pedestrian and cycle connections, cycle parking, disabled car parking and associated works).

10 Pascal Street London SW8 4SH

London Borough of LambethReference 25/01589/LDCECertificate of Lawful Use existing

Last published check: 11 Nov 2026, 21:31. Check the council record for more recent changes.

Status and dates

Last published check: 11 Nov 2026, 21:31 (UK)

  1. DoneReceived14 May 2025
  2. DoneValidated14 May 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedGrant Permission30 Jun 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
Application type
Certificate of Lawful Use existing
Ward
Vauxhall
Documents
7 published

Proposal

Application for Certificate of Lawfulness (Existing) with respect to the excavation and backfilling of a foundation trench of c. 5.0m in length, 1.0m in width, and 1.0m in depth in accordance with Planning Permission ref: 15/06216/FUL (A residential led mixed use development above and surrounding the proposed Nine Elms Station comprising four buildings between 5 and 20 storeys above the station podium and ranging in height from 29m AOD to 92m AOD, providing 332 residential units (C3) comprising 1 bed, 2 bed, 3 bed and 4 bed apartments; 4,811sqm of workspace/office (B1); 272sqm of assembly and leisure (D2) and 580sqm of retail (falling within class A1/A3/A4), a new public square, amenity space, play space, pedestrian and cycle connections, cycle parking, disabled car parking and associated works).

Reference
25/01589/LDCE
Ward
Vauxhall
Agent
tor&co

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • DECISION NOTICEDecision Notice30 Jun 2025View
  • DELEGATED REGISTERDelegated Register27 Jun 2025View
  • COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMSupporting Docs14 May 2025View
  • APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form14 May 2025View
  • PHOTOGRAPHS AND PHOTOMONTAGESPhoto14 May 2025View
  • THE LOCATION PLANOS Map14 May 2025View
  • PROPOSED FLOOR PLANPlans14 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Grant Permission
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.