Application for Listed Building Consent for replacement of existing slate roof tiles, existing lead dormers surround, existing rooflights and insertion of 1x rooflight. Replacement of windows with double glazed sash windows; replacement of rear garden stairs, replacement of cement based pointing with lime mortar. Replacement of plastic drain pipes with traditional cast iron pipes; replacement of French door leading to garden and insertion of French doors at LGF level facing rear garden. Erection of timber garden wall trellis and replacement of garden paving. Internal alterations involving the lowering of non-original raised LGF floor level, opening and restoration of bricked up historic fireplace. (Associated full planning with reference number: 25/01404/FUL received).
Application for Listed Building Consent for replacement of existing slate roof tiles, existing lead dormers surround, existing rooflights and insertion of 1x rooflight. Replacement of windows with double glazed sash windows; replacement of rear garden stairs, replacement of cement based pointing with lime mortar. Replacement of plastic drain pipes with traditional cast iron pipes; replacement of French door leading to garden and insertion of French doors at LGF level facing rear garden. Erection of timber garden wall trellis and replacement of garden paving. Internal alterations involving the lowering of non-original raised LGF floor level, opening and restoration of bricked up historic fireplace. (Associated full planning with reference number: 25/01404/FUL received).
Reference
25/01405/LB
Ward
Kennington
Agent
Ivo Carew Architects Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.