Council planning record

The demolition of all existing buildings and construction of a phased, mixed use, co-living scheme (comprising a co-living building (Sui Generis) with all associated amenity and ancillary spaces) and separately contained light industrial building (Use Class E(g)(iii)) and associated access, parking, amenity, public realm (including associated highway works) and landscaping. This is a re-consultation (14 Days) due to revised plans and details received clarifying the proposed public realm works alongside the arches and the wider vision. This includes amendments and technical detail responses to officer and consultee comments. Revised details have been received regarding the following:LanduseDesignLandscape/Public realmTransport/HighwaysEnvironmental Health Energy and sustainabilityInformation for the purpose of consultation: The proposed development would provide 320 co-living units in a building of maximum height of 47.85m above ground level; and 1,421.2sqm GIA of light industrial floorspace in a building of maximum height of 10.1m above ground level.

1, 3-11 Wellfit Street, 7-9 Hinton Road & Units 1-4 Hardess Street London SE24 0HN

DecidedReference: 24/00073/FULLondon Borough of Lambeth

Application location

1, 3-11 Wellfit Street, 7-9 Hinton Road & Units 1-4 Hardess Street London SE24 0HN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
8 Jan 2024
Validated
26 Jan 2024
Determination deadline
Not published
Local authority
London Borough of Lambeth

Application overview

The demolition of all existing buildings and construction of a phased, mixed use, co-living scheme (comprising a co-living building (Sui Generis) with all associated amenity and ancillary spaces) and separately contained light industrial building (Use Class E(g)(iii)) and associated access, parking, amenity, public realm (including associated highway works) and landscaping. This is a re-consultation (14 Days) due to revised plans and details received clarifying the proposed public realm works alongside the arches and the wider vision. This includes amendments and technical detail responses to officer and consultee comments. Revised details have been received regarding the following:LanduseDesignLandscape/Public realmTransport/HighwaysEnvironmental Health Energy and sustainabilityInformation for the purpose of consultation: The proposed development would provide 320 co-living units in a building of maximum height of 47.85m above ground level; and 1,421.2sqm GIA of light industrial floorspace in a building of maximum height of 10.1m above ground level.

Proposal details

Reference
24/00073/FUL
Ward
Herne Hill Loughborough Junction
Agent
Maddox Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 282 of 282

DocumentPublishedAction
Decision NoticeDecision Notice · PDF3 Jul 2026View
SECTION 106 AGREEMENT REDACTEDSection 106 · PDF2 Jul 2026View
DRAFT S106 AGREEMENTSection 106 · PDF29 Jun 2026View
PRINTED MINUTES PLANNING APPLICATIONS COMMITTEECommittee Report · PDF16 May 2025View
COMMITTEE REPORTCommittee Report · PDF26 Nov 2024View
COMMITTEE REPORT - ADDENDUMCommittee Report · PDF26 Nov 2024View
COMMITTEE REPORT - SECOND ADDENDUMCommittee Report · PDF26 Nov 2024View
GENERAL ARRANGEMENT GROUNDFLOOR PLANPlans - Revised · PDF8 Nov 2024View
COLIVING AND LIGHT INDUSTRIAL BUILDINGS PROPOSED SECTION AAPlans - Revised · PDF7 Nov 2024View
GENERAL ARRANGEMENT GROUNDFLOOR PLANPlans - Superseded · PDF6 Nov 2024View
COLIVING BUILDING PROPOSED L13 FLOORPLANPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING SOUTH WEST SECTION SOUTH EAST SECTIONPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED SOUTHWEST ELEVATIONPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L7 FLOOR PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L 9 FLOORPLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L10 FLOORPLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED LEVEL 6 FLOORPLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED LEVEL 5 FLOORPLANPlans - Revised · PDF5 Nov 2024View
PLANNING REVISION NOVEMBER 2024 PART 1Supporting Docs · PDF5 Nov 2024View
PLANNING REVISION NOVEMBER 2024 PART 2 APPENDIXSupporting Docs · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED GROUNDFLOOR PLANPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED NORTH WEST ELEVATION PROPOSED SOUTH EAST ELEVPlans - Revised · PDF5 Nov 2024View
COMMERCIAL STRATEGY -ADDENDUM 3Supporting Docs · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SOUTH WEST ELEVATION PROPOSED NORTH EAST ELEVPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SECOND FLOOR PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L2 FLOORPLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L4 FLOOR PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L11 FLOORPLANPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED GROUNDFLOOR PLANPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING SOUTH EAST SECTION A SOUTH EAST SECTION B SOUTH EAST SPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED ROOF PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED LEVEL 1 FLOORPLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L8 FLOOR PLANPlans - Revised · PDF5 Nov 2024View
PLANNING REVISION NOVEMBER 2024 COMPRESSEDSupporting Docs · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L3 FLOOR PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED MEZZANINE FLOOR PLANPlans - Revised · PDF5 Nov 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED FIRST FLOOR PLANPlans - Revised · PDF5 Nov 2024View
COLIVING BUILDING PROPOSED L12 FLOORPLANPlans - Revised · PDF5 Nov 2024View
DESIGN SCHEME PART 2Supporting Docs · PDF31 Oct 2024View
DESIGN SCHEME PART 4Supporting Docs · PDF31 Oct 2024View
STAGE 1 ROAD SAFETY AUDITSupporting Docs · PDF31 Oct 2024View
DESIGN SCHEME PART 1Supporting Docs · PDF31 Oct 2024View
DESIGN SCHEME PART 3Supporting Docs · PDF31 Oct 2024View
MANAGEMENT PLAN OCTOBER 2024Supporting Docs · PDF11 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SOUTH WEST ELEVATION PROPOSED NORTH EAST ELEVPlans - Revised · PDF11 Oct 2024View
COLIVING BUILDING PROPOSED L8 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING L4 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
RESPONSE TO LBL COMMENTSSupporting Docs · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L7 FLOORPLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L5 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L13 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L9 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L3 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED GROUND FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING SOUTH EAST SECTION A SOUTH EAST SECTION B SOUTHEASTPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED GROUND FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED ROOF PLANPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SECOND FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L12 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L2 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED MEZZANINE FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L6 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SOUTH WEST ELEVATION PROPOSED NORTH EAST ELEVPlans - Superseded · PDF8 Oct 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED FIRST FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L1 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L10 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
COLIVING BUILDING PROPOSED L11 FLOOR PLANPlans - Superseded · PDF8 Oct 2024View
EXTERNAL LIGHTING CLARIFICATIONSupporting Docs · PDF2 Oct 2024View
DAYLIGHT AND SUNLIGHTSupporting Docs · PDF18 Sept 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED SOUTH WEST ELEVATION PROPOSED NORTH EAST ELEVPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 3 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 1 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 6 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 2 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
LIGHT INDUSTRIAL BUILDING SOUTH WEST SECTION SOUTH EAST SECTIONPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 10 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED ROOF PLANPlans - Revised · PDF29 Aug 2024View
S106 HIGHWAY WORKS PLANPlans - Revised · PDF29 Aug 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED NORTH WEST ELEVATION PROPOSED SOUTH EAST ELEVPlans - Revised · PDF29 Aug 2024View
SITE PLAN AS PROPOSED ROOF PLANPlans - Revised · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 13 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 7 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED ROOF PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 8 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED GROUND FLOOR PLAN NPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING LEVEL 4 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 11 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 5 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
DOCUMENT REGISTER AND ISSUEPlans - Revised · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 9 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
LIGHT INDUSTRIAL BUILDING PROPOSED NORTH WEST ELEVATION PROPOSED SOUTH EAST ELEVPlans - Superseded · PDF29 Aug 2024View
SITE PLAN AS PROPOSED GROUND FLOORPlans - Revised · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED LEVEL 12 FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
COLIVING BUILDING PROPOSED MEZZANINE FLOOR PLANPlans - Superseded · PDF29 Aug 2024View
LIGHT INDUSTRIAL BUILDING SOUTH EAST SECTION A SOUTHEAST SECTION B SOUTH EAST SEPlans - Superseded · PDF29 Aug 2024View
COVER LETTER REDACTEDSupporting Docs · PDF27 Aug 2024View
TECHNICAL NOTE - FUMESupporting Docs · PDF27 Aug 2024View
UTILITIES OVERLAYSupporting Docs · PDF27 Aug 2024View
NEIGHBOURING RETAILSupporting Docs · PDF27 Aug 2024View
SOCIAL IMPACT ASSESSMENTSupporting Docs · PDF27 Aug 2024View
GENERAL ARRANGEMENT GROUNDFLOOR PLANPlans - Superseded · PDF27 Aug 2024View
LAMBETH TRANSPORT RESPONSE NOTE 2Supporting Docs · PDF16 Aug 2024View
COMMERCIAL STRATEGYSupporting Docs · PDF16 Aug 2024View
HEALTH IMPACT ASSESSMENTSupporting Docs · PDF16 Aug 2024View
WIND TECHNICAL MEMORANDAMSupporting Docs · PDF16 Aug 2024View
FLOOD RISK ASSESSMENT AND SUDS STRATEGY REPORTSupporting Docs · PDF16 Aug 2024View
TOWNSCAPE HERITAGE VISUAL IMPACT ASSESSMENTSupporting Docs · PDF16 Aug 2024View
CIRCULAR ECONOMY STATEMENT - RIBA STAGE 2 ISSUE 2Supporting Docs · PDF16 Aug 2024View
GLA CIRCULAR ECONOMY STAEMENT TEMPLATE 14/08/24Supporting Docs16 Aug 2024View
EARNSCLIFFE HARDESS YARD LETTER RE ACCESSIBLE ROOMSSupporting Docs · PDF16 Aug 2024View
LIFT CAPACITY - ELEVATESupporting Docs · PDF16 Aug 2024View
LIFT PERFORMANCESupporting Docs · PDF16 Aug 2024View
DS2 AFFORDABLE HOUSING RESPONSE DATED 02/08/24Supporting Docs · PDF7 Aug 2024View
APPENDIX 2 - VIABILITY APPRAISAL SENSITIVITY ANALYSISSupporting Docs · PDF7 Aug 2024View
APPENIDX 1 - MANTRA FINANCE RATE SUPPORTING INFORMATIONSupporting Docs · PDF7 Aug 2024View
HARDESS YARD BE GREEN BRUKLSupporting Docs · PDF11 Jul 2024View
UNIT A - BE GREEN - FULL SAP CALCULATIONSSupporting Docs · PDF11 Jul 2024View
UNIT H - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT D - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT F - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
BRUKL - LIGHT INDUSTRIAL BUILDING BE LEANSupporting Docs · PDF11 Jul 2024View
UNIT B - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
ENERGY AND SUSTAINABILITY STATEMENTSupporting Docs · PDF11 Jul 2024View
UNIT H - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
OVERHEATING ANALYSIS (TM59/TM52)Supporting Docs · PDF11 Jul 2024View
UNIT A - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT C - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
GLA BE SEEN SPREADSHEET V2.1 REDACTEDSupporting Docs11 Jul 2024View
UNIT C - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT E - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT F - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT G - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
HARDESS YARD BE LEAN BRUKLSupporting Docs · PDF11 Jul 2024View
UNIT G - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT E - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT I - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
BRUKL - LIGHT INDUSTRIAL BUILDING BE GREENSupporting Docs · PDF11 Jul 2024View
UNIT B - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT I - BE GREEN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
UNIT D - BE LEAN - FULL SAP CALCULATIONSupporting Docs · PDF11 Jul 2024View
GLA CARBON EMISSION REPORTING SPREADSHEET V2.0Supporting Docs10 Jul 2024View
LETTER - APPENDIX 1 - OPEX BREAKDOWN LASupporting Docs · PDF26 Jun 2024View
LETTER - APPENDIX 2 - PHOTOS OF EXISTING MEZZANINESupporting Docs · PDF26 Jun 2024View
LETTER - APPENDIX 3 - KEL REPORTSupporting Docs · PDF26 Jun 2024View
LETTER - AFFORDABLE HOUSING RESPONSE TO GLASupporting Docs · PDF26 Jun 2024View
LETTER - APPENDIX 4 - VIABILITY APPRAISALSupporting Docs · PDF26 Jun 2024View
COLIVING BUILDING - PROPOSED GROUND FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L1 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
BIODIVERSITY METRIC (STATUTORY)Supporting Docs · PDF12 Jun 2024View
LAMBETH TRANSPORT RESPONSE NOTESupporting Docs · PDF12 Jun 2024View
PROPOSED NORTH WEST ELEVATION PROPOSED SOUTHWEST ELEVATIONPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L4 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L6 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
VENTILATION STATEMENTSupporting Docs · PDF12 Jun 2024View
PROPOSED SITE PLAN - ROOF PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L11 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
LIGHT INDUSTRIAL BUILDING - PROPOSED FIRST FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
FRAMEWORK TRAVEL PLANSupporting Docs · PDF12 Jun 2024View
COMMUNITY INVESTMENT PROGRAMMESupporting Docs · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L7 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L9 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
LIGHT INDUSTRIAL BUILDING - PROPOSED GROUND FLOOR PLANPlans - Revised · PDF12 Jun 2024View
COLIVING AND LIGHT INDUSTRIAL BUILDINGS - PROPOSED SECTION AAPlans - Superseded · PDF12 Jun 2024View
COMMERCIAL STRATEGY ADDENDUMSupporting Docs · PDF12 Jun 2024View
SUBMISSION OF UPDATED INFORMATION - REDACTED LETTERSupporting Docs · PDF12 Jun 2024View
2ND FLOOR LIGHT INDUSTRIAL BUILDING VENTILATIONSupporting Docs · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L12 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L13 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED ROOF PLANPlans - Superseded · PDF12 Jun 2024View
LIGHT INDUSTRIAL BUILDING - PROPOSED SECOND FLOOR PLANPlans - Revised · PDF12 Jun 2024View
LIGHT INDUSTRIAL BUILDING - PROPOSED ROOF PLANPlans - Superseded · PDF12 Jun 2024View
ACOUSTIC CONSULTANCY REPORT REDACTEDSupporting Docs · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L3 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L5 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
HEALTH IMPACT ASSESSMENTSupporting Docs · PDF12 Jun 2024View
HARDESS YARD - EXTERNAL LIGHTING CLARIFICATIONSupporting Docs · PDF12 Jun 2024View
GROUNDFLOOR MEZZANINE LIGHT INDUSTRIAL BUILDING VENTILATIONSupporting Docs · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED MEZZANINE FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L10 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L2 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
COLIVING BUILDING - PROPOSED L8 FLOOR PLANPlans - Superseded · PDF12 Jun 2024View
STATUTORY BIODIVERSITY METRICSupporting Docs12 Jun 2024View
TFL TRANSPORT RESPONSE NOTESupporting Docs · PDF11 Jun 2024View
SECTION 106 HIGHWAY WORKS PLANPlans - Superseded · PDF11 Jun 2024View
TECHNICAL MEMO - WIND MICROCLIMATESupporting Docs · PDF11 Jun 2024View
LANDSCAPE GENERAL ARRANGEMENT GROUND FLOOR PLANPlans - Superseded · PDF11 Jun 2024View
2ND FLOOR FUTURE HEAT NETWROK CONNECTIONSupporting Docs · PDF31 May 2024View
GROUND FLOOR FUTURE HEAT NETWORK CONNECTIONSupporting Docs · PDF31 May 2024View
2ND FLOOR HEATING PLANTROOM LOCATIONSupporting Docs · PDF31 May 2024View
DAYLIGHT AND SUNLIGHT ADDENDUM RESPONSE MAY 2024Supporting Docs · PDF31 May 2024View
UPDATED LIGHTING REPORTSupporting Docs · PDF31 May 2024View
1ST FLOOR FUTURE HEAT NETWORK CONNECTIONSupporting Docs · PDF31 May 2024View
NOISE, VIBRATION, AIR, DUST MANAGEMENTSupporting Docs · PDF21 May 2024View
PV LAYOUT ROOFSupporting Docs · PDF20 May 2024View
PHASING PLAN PHASE 00:DEMOLITIONPlans · PDF14 May 2024View
PHASING PLAN PHASE 1: CONSTRUCTIONPlans · PDF14 May 2024View
DAYLIGHT AND SUNLIGHT RESPONSESupporting Docs · PDF30 Apr 2024View
VIABILITY - APPENDIX E - APPRAISAL SUMMARY 26/04/2024Supporting Docs · PDF30 Apr 2024View
VIABILITY - APPENDIX C - MOBILISATION BUDGETSupporting Docs30 Apr 2024View
VIABILITY - APPENDIX D - CONSTRUCTION PROGRAMMESupporting Docs · PDF30 Apr 2024View
WHOLE LIFE CARBON - RIBA STAGE 2 ISSUE NO.2Supporting Docs · PDF30 Apr 2024View
VIABILITY LETTER 26/04/24 DS2Supporting Docs · PDF30 Apr 2024View
VIABILITY - APPENDIX A - K2 VIABILITY COMMENTSSupporting Docs · PDF30 Apr 2024View
EMPLOYMENT AND SKILLS PLAN UPDATEDSupporting Docs · PDF8 Apr 2024View
PART 7Design & Access Statement · PDF1 Feb 2024View
PART 9Design & Access Statement · PDF1 Feb 2024View
DEMOLITION GROUND FLOOR PLANPlans · PDF1 Feb 2024View
EXISTING SITE PLANPlans · PDF1 Feb 2024View
COLIVING BUILDING - TYPICAL STRAIGHT FACADE DETAILS NORTH WEST ELEVATIONSPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SITE WIDE NORTH WEST ELEVATIONPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SITE WIDE NORTH EAST ELEVATIONPlans · PDF1 Feb 2024View
DEMOLITION PLAN AND SECTIONSPlans · PDF1 Feb 2024View
EXISTING ELEVATIONS AND SECTIONSPlans · PDF1 Feb 2024View
PART 6Design & Access Statement · PDF1 Feb 2024View
EXISTING GROUND FLOOR PLANPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED NORTH EAST ELEVATIONPlans · PDF1 Feb 2024View
PART11Design & Access Statement · PDF1 Feb 2024View
CIL FORMSupporting Docs · PDF1 Feb 2024View
COLIVING BUILDING - TYPICAL SAWTOOTH FACADE DETAILS NORTH AND SOUTH ELEVATIONSPlans · PDF1 Feb 2024View
PART 1Design & Access Statement · PDF1 Feb 2024View
PART 3Design & Access Statement · PDF1 Feb 2024View
EXISTING FIRST FLOOR PLANPlans · PDF1 Feb 2024View
DEMOLITION PHASE - HEALTH AND SAFETY PLANSupporting Docs · PDF1 Feb 2024View
ISSUE SHEETSupporting Docs · PDF1 Feb 2024View
COLIVING BUILDING - TYPICAL STRAIGHT FACADE DETAILS SOUTH EAST ELEVATIONSPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SITE WIDE SOUTH WEST ELEVATIONPlans · PDF1 Feb 2024View
COLIVING AND LIGHT INDUSTRIAL BUILDINGS - PROPOSED SECTION BBPlans · PDF1 Feb 2024View
PART 4Design & Access Statement · PDF1 Feb 2024View
PART 5Design & Access Statement · PDF1 Feb 2024View
DEMOLITION PLAN FIRST FLOORPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SOUTH EAST ELEVATIONPlans · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SOUTH WEST ELEVATIONPlans · PDF1 Feb 2024View
PART10Design & Access Statement · PDF1 Feb 2024View
PROPOSED SITE PLAN - GROUND FLOORPlans - Superseded · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED NORTH WEST AND SOUTH EAST ELEVATIONSPlans - Superseded · PDF1 Feb 2024View
PART 2Design & Access Statement · PDF1 Feb 2024View
PART 8Design & Access Statement · PDF1 Feb 2024View
SITE LOCATION PLANOS Map · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED NORTH WEST ELEVATIONPlans · PDF1 Feb 2024View
LIGHT INDUSTRIAL BUILDING - PROPOSED SOUTH WEST/NORTH EAST ELEVATIONSPlans - Superseded · PDF1 Feb 2024View
COLIVING BUILDING - PROPOSED SITE WIDE SOUTH EAST ELEVATIONPlans · PDF1 Feb 2024View
UTILITIES REPORTSupporting Docs · PDF16 Jan 2024View
BE_SEEN_SPREADSHEETSupporting Docs16 Jan 2024View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF8 Jan 2024View
ACCESS STATEMENTSupporting Docs8 Jan 2024View
LANDSCAPE GA ROOF PLANPlans · PDF8 Jan 2024View
OPERATION WASTE MANAGEMENT PLANSupporting Docs · PDF8 Jan 2024View
AIR QUALITY ASSESSMENTSupporting Docs · PDF8 Jan 2024View
WHOLE LIFE CARBON - RIBA STAGE 2Supporting Docs · PDF8 Jan 2024View
PEDESTRIAN LEVEL WIND MICROCLIMATE ASSESSMENTSupporting Docs · PDF8 Jan 2024View
ARBORICULTURAL IMPACT ASSESSMENTSupporting Docs · PDF8 Jan 2024View
BREEAM 2018 NEW CONSTRUCTION - INDUSTRIALSupporting Docs · PDF8 Jan 2024View
COVERING LETTERSupporting Docs · PDF8 Jan 2024View
FINANCIAL VIABILITY ASSESSMENTSupporting Docs · PDF8 Jan 2024View
GLA CARBON EMISSION REPORTING SPREADSHEETSupporting Docs8 Jan 2024View
DEMOLITION PHASE - HEALTH AND SAFETY PLANSupporting Docs · PDF8 Jan 2024View
STATEMENT OF COMMUNITY INVOLVEMENTSupporting Docs · PDF8 Jan 2024View
EQUALITY IMPACT ASSESSMENT DRAFTSupporting Docs · PDF8 Jan 2024View
FIRE STATEMENTSupporting Docs · PDF8 Jan 2024View
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 1Supporting Docs · PDF8 Jan 2024View
LUMINAIRE LAYOUT PLANSupporting Docs · PDF8 Jan 2024View
DESK STUDY REVIEW & GROUND INVESTIGATIONSupporting Docs · PDF8 Jan 2024View
CO-LIVING DEMAND STUDYSupporting Docs · PDF8 Jan 2024View
TOWNSCAPE, HERITAGE AND VISUAL IMPACT APPRAISAL - PART 2Supporting Docs · PDF8 Jan 2024View
PLANNING GATEWAY 1 FORMSupporting Docs · PDF8 Jan 2024View
INTERNAL DAYLIGHT/ SUNLIGHT AND SOLAR GLARE REPORTSupporting Docs · PDF8 Jan 2024View
PRELIMINARY ECOLOGICAL APPRAISALSupporting Docs · PDF8 Jan 2024View
SITE WASTE MANAGEMENT PLANSupporting Docs · PDF8 Jan 2024View
COMMUNITY INFRASTRUCTURE LEVY - COMPLETED FORMSupporting Docs · PDF8 Jan 2024View
TRANSPORT ASSESSMENTTransport Statement · PDF8 Jan 2024View
ARCHAEOLOGICAL DESK-BASED ASSESSMENTSupporting Docs · PDF8 Jan 2024View
TOWNSCAPE, HERITAGE AND VISUAL IMPACT APPRAISAL - PART 3Supporting Docs · PDF8 Jan 2024View
GLA - WHOLE LIFE CYCLE CARBON(WLC) ASSESSMENT TEMPLATESupporting Docs8 Jan 2024View
PLANNING STATEMENTPlanning Statement · PDF8 Jan 2024View
BREEAM 2018 NEW CONSTRUCTION - CO-LIVING SPACESupporting Docs · PDF8 Jan 2024View
COMMERCIAL STRATEGYSupporting Docs · PDF8 Jan 2024View
NOISE IMPACT ASSESSMENTSupporting Docs · PDF8 Jan 2024View
TOWNSCAPE, HERITAGE AND VISUAL IMPACT APPRAISAL - PART 1Supporting Docs · PDF8 Jan 2024View
OUTLINE CONSTRUCTION LOGISTICS PLANSupporting Docs · PDF8 Jan 2024View
DAYLIGHT, SUNLIGHT & OVERSHADOWING REPORT - PART 2Supporting Docs · PDF8 Jan 2024View
LANDSCAPE GA TERRACE PLANPlans · PDF8 Jan 2024View
DRAFT DELIVERY AND SERVICING PLANSupporting Docs · PDF8 Jan 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Actual Committee Date

    Published milestoneCouncil source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source
  9. Agreed Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant Permission
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.