Status on council recordCouncil status: Decided

Request for a scoping opinion in respect of an Environmental Impact Assessment in relation to proposed development at Plot Bounded By Parry Street, Bondway and 7 To 93 Wandsworth Road London for removal of existing structures and the construction of a mixed-use development comprising two towers of 53 storeys (185m) and 42 storeys (151m), with a connecting podium of 10 storeys (49m), containing office (B1), hotel (C1), residential (C3) and retail (A1-A4) uses plus plant, servicing, parking and other ancillary space; the provision of hard and soft landscaping; the creation of a new vehicular access point on Wandsworth Road and a vehicular drop-off on Parry Street, and other works incidental to the development.

Vauxhall Cross, Kennington Lane London

London Borough of LambethReference 17/04652/EIASCPEIA Scoping

Last published check: 21 Nov 2026, 19:52. Check the council record for more recent changes.

Status and dates

Last published check: 21 Nov 2026, 19:52 (UK)

  1. DoneReceived22 Sept 2017
  2. DoneValidated22 Sept 2017
  3. ClosedConsultationEnded 19 Oct 2017
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedNo further Action - Finally Disposed of1 Nov 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
Application type
EIA Scoping
Ward
Oval
Documents
6 published

Proposal

Request for a scoping opinion in respect of an Environmental Impact Assessment in relation to proposed development at Plot Bounded By Parry Street, Bondway and 7 To 93 Wandsworth Road London for removal of existing structures and the construction of a mixed-use development comprising two towers of 53 storeys (185m) and 42 storeys (151m), with a connecting podium of 10 storeys (49m), containing office (B1), hotel (C1), residential (C3) and retail (A1-A4) uses plus plant, servicing, parking and other ancillary space; the provision of hard and soft landscaping; the creation of a new vehicular access point on Wandsworth Road and a vehicular drop-off on Parry Street, and other works incidental to the development.

Reference
17/04652/EIASCP
Ward
Oval

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • SCOPING OPINION LETTERDecision Notice31 Oct 2017View
  • SCOPING REPORT BY WATERMANDelegated Register31 Oct 2017View
  • GEOARCHAEOLOGICAL DEPOSIT MODELLING REPORTSupporting Docs22 Sept 2017View
  • ENVIRONMENTAL IMPACT ASSESSMENT SCOPING REPORTSupporting Docs22 Sept 2017View
  • APPENDIX B VIEWS MAPPlans22 Sept 2017View
  • PRELIMINARY ECOLOGICAL APPRAISALSupporting Docs22 Sept 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

No further Action - Finally Disposed of
SCOPING OPINION LETTER
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.