Partial approval of details pursuant to condition 9 a (sample of external materials), b (mock up panels of typical elevations), c (fa�ade design and detailing at 1:20 and 1:5 scale), d (location and dimension details of all external pillars), e (building soffits;), f (ground and first floor detailed elevation drawings), g (basement ventilation strategy;), h (details to all external pillars) and i (screening between building 5 and the railway viaduct) of appeal decision ref (APP/N5660/V/13/2205181) of refused planning permission 12/04708/FUL (Part demolition of Shell Centre comprising Hungerford, York and Chicheley wings, upper level walkway, removal of raised podium deck, associated structures and associated site clearance to enable a mixed use development of 8 buildings ranging from 5 to 37 storeys in height and 4 basement levels to provide up to 218,147m2 of floorspace (GIA), comprising offices (B1), residential (C3) (up to 877 units), retail (A1-A5), leisure (D2) and community/leisure uses (D1/D2), parking and servicing space, hard and soft landscaping together with the provision of a new public square, highway and landscaping works to Belvedere Road, Chicheley Street and York Road, modifications to York Road Underground station, 2 link bridges from new buildings to the existing Shell Centre Tower, reconfiguration of York Road footbridge if retained, creation of new vehicular access and other associated works) granted on 05.06.2014.This application relates to building 3 including the York Road bridge extension and stair.
Partial approval of details pursuant to condition 9 a (sample of external materials), b (mock up panels of typical elevations), c (fa�ade design and detailing at 1:20 and 1:5 scale), d (location and dimension details of all external pillars), e (building soffits;), f (ground and first floor detailed elevation drawings), g (basement ventilation strategy;), h (details to all external pillars) and i (screening between building 5 and the railway viaduct) of appeal decision ref (APP/N5660/V/13/2205181) of refused planning permission 12/04708/FUL (Part demolition of Shell Centre comprising Hungerford, York and Chicheley wings, upper level walkway, removal of raised podium deck, associated structures and associated site clearance to enable a mixed use development of 8 buildings ranging from 5 to 37 storeys in height and 4 basement levels to provide up to 218,147m2 of floorspace (GIA), comprising offices (B1), residential (C3) (up to 877 units), retail (A1-A5), leisure (D2) and community/leisure uses (D1/D2), parking and servicing space, hard and soft landscaping together with the provision of a new public square, highway and landscaping works to Belvedere Road, Chicheley Street and York Road, modifications to York Road Underground station, 2 link bridges from new buildings to the existing Shell Centre Tower, reconfiguration of York Road footbridge if retained, creation of new vehicular access and other associated works) granted on 05.06.2014.This application relates to building 3 including the York Road bridge extension and stair.
Reference
17/03384/DET
Ward
Bishops
Agent
Quod
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.