Application for a non-material amendment following a grant of Planning Permission ref: 17/00252/FUL (Change of use of part of ground floor and all of basement retail unit at 111-113 Waterloo Road (Use Class A1) to provide new drinking establishment (Use Class A4) including internal works and associated alterations to the external elevations.) Granted on 30/03/2017Amendment sought: Amend the wording of condition 9 as follows:"Prior to commencement of the use hereby approved a scheme for mitigation and validation must be undertaken to ensure that noise targets are met within the adjoining premises as stated in table 4.3 of section 4 of CSGA Acoustics report dated 10th of March 2017. The scheme shall be submitted to and approved in writing by the Local Planning Authority and shall demonstrate compliance over a 1 hour Laeq taking due account of frequency. The scheme must include details of construction monitoring by a suitably qualified acoustician and a post construction scheme of validation and measurement to demonstrate compliance. The use hereby permitted shall not commence until the approved details are fully implemented and details of post construction validation have been submitted to and approved in writing by the Local Planning Authority."
Application for a non-material amendment following a grant of Planning Permission ref: 17/00252/FUL (Change of use of part of ground floor and all of basement retail unit at 111-113 Waterloo Road (Use Class A1) to provide new drinking establishment (Use Class A4) including internal works and associated alterations to the external elevations.) Granted on 30/03/2017Amendment sought: Amend the wording of condition 9 as follows:"Prior to commencement of the use hereby approved a scheme for mitigation and validation must be undertaken to ensure that noise targets are met within the adjoining premises as stated in table 4.3 of section 4 of CSGA Acoustics report dated 10th of March 2017. The scheme shall be submitted to and approved in writing by the Local Planning Authority and shall demonstrate compliance over a 1 hour Laeq taking due account of frequency. The scheme must include details of construction monitoring by a suitably qualified acoustician and a post construction scheme of validation and measurement to demonstrate compliance. The use hereby permitted shall not commence until the approved details are fully implemented and details of post construction validation have been submitted to and approved in writing by the Local Planning Authority."
Reference
17/01902/NMC
Ward
Bishops
Agent
Wildstone Planning
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.