Approval of details pursuant to conditions 14 (Method Statement and Flood Risk Assessment) and 16 (Sustainable construction scheme) of Planning Permission Ref: 15/03900/FUL (Conversion of the existing building from student accommodation (sui generis) to a single family dwelling (C3 use class), involving the erection of a second floor extension, basement excavation, and demolition of garage for the erection of a two storey coach house and associated external alterations, including the repair and refurbishment of existing windows, brickwork, doors and roof slopes and internal changes, including the provision of a lift, reconfiguration of staircase and internal room layouts, involving replacement of one window with a door on the east elevation. [Town Planning and Listed Building consent]) Granted on 24.03.2016.
Approval of details pursuant to conditions 14 (Method Statement and Flood Risk Assessment) and 16 (Sustainable construction scheme) of Planning Permission Ref: 15/03900/FUL (Conversion of the existing building from student accommodation (sui generis) to a single family dwelling (C3 use class), involving the erection of a second floor extension, basement excavation, and demolition of garage for the erection of a two storey coach house and associated external alterations, including the repair and refurbishment of existing windows, brickwork, doors and roof slopes and internal changes, including the provision of a lift, reconfiguration of staircase and internal room layouts, involving replacement of one window with a door on the east elevation. [Town Planning and Listed Building consent]) Granted on 24.03.2016.
Reference
17/01291/DET
Ward
Bishops
Agent
Hollins Planning Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.