Approval of details pursuant to condition 8 (basement panelling repair details) of planning permission ref 15/03956/LB (Removal of staircase and erection of a frameless glazed single story rear extension with balcony. Removal of the render on the rear elevation. Reinstatement of brickwork and the original sash window opening together with a replica six over six pane timber sash window. Removal of modern uPVC window in the roof dormer. Reinstatement of original internal basement step to the staircase. Removal of non-original radiator casings with timber panelling made good. Repairs of panelling damaged by damp in the basement stairwell. It is proposed that the reinstatement of the original step to the stair and the reinstatement of the original floor level will alleviate the damp problems.) Granted on 10.11.2015.
Approval of details pursuant to condition 8 (basement panelling repair details) of planning permission ref 15/03956/LB (Removal of staircase and erection of a frameless glazed single story rear extension with balcony. Removal of the render on the rear elevation. Reinstatement of brickwork and the original sash window opening together with a replica six over six pane timber sash window. Removal of modern uPVC window in the roof dormer. Reinstatement of original internal basement step to the staircase. Removal of non-original radiator casings with timber panelling made good. Repairs of panelling damaged by damp in the basement stairwell. It is proposed that the reinstatement of the original step to the stair and the reinstatement of the original floor level will alleviate the damp problems.) Granted on 10.11.2015.
Reference
17/00299/DET
Ward
Princes
Agent
urban future organization ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.