RefusedCouncil status: Decided

External works involving Installation of new railings to front garden, replacement of the existing pathway paving stones to the rear elevation, repair chimney flue, replacement of all windows with double glazed windows, repair roof, replacement of original front door with Georgian style front door, removal of rear window at basement level and installation of doors, replacement of rear door with a window at ground floor level. Internal works including excavation of existing basement, installation of a shutter to ground floor front arched window, removal and replacement of stud walls at basement and ground floor levels, installation of a new staircase along with other associated internal and external works.

322 Kennington Road London SE11 4LD

London Borough of LambethReference 17/00172/LBListed Building Consent

Last published check: 23 Nov 2026, 09:37. Check the council record for more recent changes.

Status and dates

Last published check: 23 Nov 2026, 09:37 (UK)

  1. DoneReceived15 Jan 2017
  2. DoneValidated23 Feb 2017
  3. ClosedConsultationEnded 17 Mar 2017
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedRefuse Permission20 Apr 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (8)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Oval
Documents
19 published

Proposal

External works involving Installation of new railings to front garden, replacement of the existing pathway paving stones to the rear elevation, repair chimney flue, replacement of all windows with double glazed windows, repair roof, replacement of original front door with Georgian style front door, removal of rear window at basement level and installation of doors, replacement of rear door with a window at ground floor level. Internal works including excavation of existing basement, installation of a shutter to ground floor front arched window, removal and replacement of stud walls at basement and ground floor levels, installation of a new staircase along with other associated internal and external works.

Reference
17/00172/LB
Ward
Oval
Agent
Shorplans Architectural Services

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision NoticeDecision Notice21 Apr 2017View
  • Delegated RegisterDelegated Register20 Apr 2017View
  • OBJECTIONPublic Comments (Redacted)29 Mar 2017View
  • PROPOSED BASEMENT / GROUND FLOOR PLANSPlans - Revised24 Feb 2017View
  • EXISTING AND PROPOSED FLOOR PLANS, ELEVATIONS AND SECTIONSPlans21 Feb 2017View
  • AMENDMENTHERITAGE STATEMENTPlans - Superseded13 Feb 2017View
  • AMENDMENTTHE LOCATION PLANPlans - Superseded13 Feb 2017View
  • AMENDMENTHOW THE FEE WAS CALCULATEDPlans - Superseded13 Feb 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Refuse Permission
Decision Notice
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.