Erection of a single storey part ground part lower ground floor side infill extension. Replacement of rear outrigger roof with new asphalt roof covering and replacement of plastic, guttering, hopper, and down pipe with new cast iron versions. Replacement of a window at first floor to match existing.Internal alterations to include:The scheme also involves a number of internal alterationsPart Lower Ground FloorRemoval of flank wall within new extension, introduction of new beam in place of load bearing wall, re-introduction of original fireplace and hearth, replacement of a door to bedroom 2 with matching original panelled door and reversal of door swing, and replacement of ceiling in bedroom 2, adapt landing to incorporate a raised step leading into kitchen, slight relocation of kitchen door, rehang existing door to bathroom/utility room.Ground FloorRemoval of wall between reception room 1 and 2, introduction of a new beam in place of load bearing wall, retain and restore fireplaces in both reception rooms, re hang existing doors to both reception rooms, and replacement of door to bedroom 3 with new door to match existing.First FloorReinstatement of original fireplace and hearth to bedroom 1 and renewal of existing ceiling.
Erection of a single storey part ground part lower ground floor side infill extension. Replacement of rear outrigger roof with new asphalt roof covering and replacement of plastic, guttering, hopper, and down pipe with new cast iron versions. Replacement of a window at first floor to match existing.Internal alterations to include:The scheme also involves a number of internal alterationsPart Lower Ground FloorRemoval of flank wall within new extension, introduction of new beam in place of load bearing wall, re-introduction of original fireplace and hearth, replacement of a door to bedroom 2 with matching original panelled door and reversal of door swing, and replacement of ceiling in bedroom 2, adapt landing to incorporate a raised step leading into kitchen, slight relocation of kitchen door, rehang existing door to bathroom/utility room.Ground FloorRemoval of wall between reception room 1 and 2, introduction of a new beam in place of load bearing wall, retain and restore fireplaces in both reception rooms, re hang existing doors to both reception rooms, and replacement of door to bedroom 3 with new door to match existing.First FloorReinstatement of original fireplace and hearth to bedroom 1 and renewal of existing ceiling.
Reference
16/07071/LB
Ward
Princes
Agent
WYG
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.