Approval of details pursuant to conditions 5 (hard and soft landscaping and external lighting), 7 (waste management plan) and 8 (cycle parking) of planning permission ref (11/02205/FUL) (Application for a new planning permission to replace an extant planning permission in order to extend the time limit for implementation of planning permission ref: 07/04565/FUL (Erection of two storey extension at roof level fronting Acre Lane and single storey extension at roof level fronting Strathleven Road, to provide 9 self contained flats (8 x 2 bedroom and 1 x 3 bedroom) and refurbishment of existing building including alterations to existing entrance involving the formation of a new ramped access, steps and railings and associated landscaping, boundary treatment) granted on: 28.08.2008.) Granted on 31.01.2012.
Approval of details pursuant to conditions 5 (hard and soft landscaping and external lighting), 7 (waste management plan) and 8 (cycle parking) of planning permission ref (11/02205/FUL) (Application for a new planning permission to replace an extant planning permission in order to extend the time limit for implementation of planning permission ref: 07/04565/FUL (Erection of two storey extension at roof level fronting Acre Lane and single storey extension at roof level fronting Strathleven Road, to provide 9 self contained flats (8 x 2 bedroom and 1 x 3 bedroom) and refurbishment of existing building including alterations to existing entrance involving the formation of a new ramped access, steps and railings and associated landscaping, boundary treatment) granted on: 28.08.2008.) Granted on 31.01.2012.
Reference
16/06259/DET
Ward
Brixton Hill
Agent
UV Architects
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.