Council planning record

Installation of mechanical plant comprising air source heat pumps and an air handling unit to the first-floor roof behind the existing parapet; replacement of entrance steps, risers, coping stones and paved areas with natural stone; replacement of front boundary gates and brick piers; alteration to the parapet of the existing side extension; reinstatement of the original roof form to the projecting bay; replacement of the existing steel entrance door with a timber door and all associated works

13 Willow Bridge Road, London, N1 2LB

FINAL DECISIONReference: P2026/2124/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 14:11. Check the council record for more recent changes.

Application location

13 Willow Bridge Road, London, N1 2LB

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
7 Aug 2026
Validated
19 Aug 2026
Determination deadline
1 Oct 2026
Local authority
London Borough of Islington

Application overview

Installation of mechanical plant comprising air source heat pumps and an air handling unit to the first-floor roof behind the existing parapet; replacement of entrance steps, risers, coping stones and paved areas with natural stone; replacement of front boundary gates and brick piers; alteration to the parapet of the existing side extension; reinstatement of the original roof form to the projecting bay; replacement of the existing steel entrance door with a timber door and all associated works

Proposal details

Reference
P2026/2124/FUL
Alternative references
PP-15138327
Ward
Canonbury
Agent
Ade Fowler
UPRN
5300098129

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 14 of 14

DocumentPublishedAction
Application Form (Redacted)Default7 Aug 2026View
Proposed Side ElevationDefault7 Aug 2026View
Existing Front Garden PlanDefault7 Aug 2026View
Proposed Front Garden PlanDefault7 Aug 2026View
Planning/Sustainability StatementDefault7 Aug 2026View
OS Site PlanDefault7 Aug 2026View
Location PlanDefault7 Aug 2026View
Design & Access StatementDefault7 Aug 2026View
Noise ReportDefault7 Aug 2026View
Existing & Proposed Roof PlanDefault7 Aug 2026View
Existing & Proposed Front ElevationDefault7 Aug 2026View
Existing Side ElevationDefault7 Aug 2026View
DNDecision Notice30 Sept 2026View
DRDelegated Report30 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: OS Map (unnumbered), 308_P_01_002 – Location Plan, 308_P_02_007 – Existing & Proposed Roof Plan, 308_D_01_016 – Proposed Side Elevation, 308_D_01_018 – Existing & Proposed Front Elevations, 308_D_01_090 – Proposed Front Garden Plan, Design Access & Heritage Statement prepared by Islington Architects Ltd (undated), Noise Assessment Report prepared by PC Environmental Consultants (dated 06/08/2026), Sustainable Design & Construction Statement prepared by Islington Architects Ltd (dated 30/03/2026), Climate Action SPD Compliance Statement prepared by Islington Architects Ltd (dated 05/08/2026), Climate Action SPD Compliance Checklist prepared by Islington Architects Ltd (dated 05/08/2026) REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. CONDITION: The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: In the interest of protecting the amenities of future residential occupiers from undue levels of noise and disruption.
  5. NOISE (CONSTRUCTION WORKS): Noise from demolition and construction works is subject to control under the Control of Pollution Act 1974. You must carry out any building works that can be heard at the boundary of the site only between 08.00 and 18.00 hours Monday to Friday and 08.00 to 13.00 on Saturday and not at all on Sundays and Public Holidays. You are advised to consult the Pollution Team, Islington Council, 222 Upper Street London N1 1XR (Tel. No. 020 7527 3258 or by email pollution@islington.gov.uk) or seek prior approval under Section 61 of the Act if you anticipate any difficulty in carrying out construction other than within the hours stated above.
  6. The applicant is advised that Islington have a duty to investigate any complaints in terms of statutory nuisance. It is also advised that the plant is checked upon installation and regularly checked, maintained and serviced to ensure noise levels do not rise or acoustic character such as tonality, intermittency, impulsivity or other acoustic character develop. The units should be installed on a solid base with appropriate isolation to minimise vibration and structure-borne noise transmission.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.