Council planning record

Removal / variation approval of details pf conditions 2 and 44 of planning permission reference: P2023/0382/S73, dated 22/12/2023 for Refurbishment of existing buildings; partial demolition and infill extensions to the southern, northern courtyard and western elevations at ground, first, second, third and fourth floor level and one storey roof extensions to provide additional floorspace at Times House; removal of plant room and entrance, alteration to the elevations and enlargement of existing windows to Laundry Building; further works include the provision of flexible Food and Drink (Class E (b)) and/or Bar/Drinking Establishment (Sui Generis) units, and Retail (Class E (a)) units at ground floor level; provision of outdoor terraces, cycle storage and associated facilities, green roofs, plant, public realm works to Laundry Yard and infrastructure and related works, and new cycle parking on Caledonia Street.

Times House and Laundry Buildings (4-6 Bravingtons Walk, 8 Caledonia Street and part ground floor area of 3 Bravingtons Walk), Laundry Yard and part of Caledonia Street, Regent Quarter, Kings Cross, London N1,

VALIDATEDReference: P2026/2112/S73London Borough of Islington

Last published check: 3 Oct 2026, 15:37. Check the council record for more recent changes.

Application location

Times House and Laundry Buildings (4-6 Bravingtons Walk, 8 Caledonia Street and part ground floor area of 3 Bravingtons Walk), Laundry Yard and part of Caledonia Street, Regent Quarter, Kings Cross, London N1,

This record has no verified map location.

Application summary

Status
VALIDATED
Application type
Removal/Variation of Condition (Section 73)
Received
6 Aug 2026
Validated
18 Aug 2026
Determination deadline
5 Nov 2026
Local authority
London Borough of Islington

Application overview

Removal / variation approval of details pf conditions 2 and 44 of planning permission reference: P2023/0382/S73, dated 22/12/2023 for Refurbishment of existing buildings; partial demolition and infill extensions to the southern, northern courtyard and western elevations at ground, first, second, third and fourth floor level and one storey roof extensions to provide additional floorspace at Times House; removal of plant room and entrance, alteration to the elevations and enlargement of existing windows to Laundry Building; further works include the provision of flexible Food and Drink (Class E (b)) and/or Bar/Drinking Establishment (Sui Generis) units, and Retail (Class E (a)) units at ground floor level; provision of outdoor terraces, cycle storage and associated facilities, green roofs, plant, public realm works to Laundry Yard and infrastructure and related works, and new cycle parking on Caledonia Street.

Proposal details

Reference
P2026/2112/S73
Alternative references
PP-15034000
Ward
Caledonian
Agent
Miss Emilia Frost
UPRN
10001296652

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 122 of 122

DocumentPublishedAction
Application form redactedApplication Form - Redacted6 Aug 2026View
Air quality confirmation statementApplication Supporting Documents6 Aug 2026View
Daylight and sunlight letter of comfortApplication Supporting Documents6 Aug 2026View
Flood risk and drainage strategyApplication Supporting Documents6 Aug 2026View
Heritage statementApplication Supporting Documents6 Aug 2026View
fire statementApplication Supporting Documents6 Aug 2026View
landscape design reportApplication Supporting Documents6 Aug 2026View
landscape planDrawings - Existing - Plans6 Aug 2026View
Existing levels planDrawings - Existing - Plans6 Aug 2026View
noise impact assessment - letter of comfortApplication Supporting Documents6 Aug 2026View
Ventilation and extraction statementApplication Supporting Documents6 Aug 2026View
Existing ground floor planDrawings - Existing - Plans6 Aug 2026View
Existing lower roof planDrawings - Existing - Plans6 Aug 2026View
Existing upper roof planDrawings - Existing - Plans6 Aug 2026View
Existing second floor planDrawings - Existing - Plans6 Aug 2026View
Existing third floor planDrawings - Existing - Plans6 Aug 2026View
Existing basement planDrawings - Existing - Plans6 Aug 2026View
Existing floor planDrawings - Existing - Plans6 Aug 2026View
Existing fourth floor planDrawings - Existing - Plans6 Aug 2026View
Existing section AADrawings - Existing Sections6 Aug 2026View
Existing section BBDrawings - Proposed6 Aug 2026View
Existing section CCDrawings - Existing Sections6 Aug 2026View
Existing section DDDrawings - Existing Sections6 Aug 2026View
Existing south elevationDrawings - Existing - Elevations6 Aug 2026View
Existing street elevationDrawings - Existing - Elevations6 Aug 2026View
Existing west eleationDrawings - Existing - Elevations6 Aug 2026View
Existing context section east and westDrawings - Existing Sections6 Aug 2026View
Existing context section north and southDrawings - Existing Sections6 Aug 2026View
Existing east elevationDrawings - Existing - Elevations6 Aug 2026View
Existing north elevationDrawings - Existing - Elevations6 Aug 2026View
Times House east elevation demolition approved under P2021/2269/FULElevations6 Aug 2026View
Times House north elevation demolition approved under P2023/0382/S73Elevations6 Aug 2026View
Times House south elevation demolition approved under P2021/2269/FULElevations6 Aug 2026View
Times House west elevation demolition approved under P2021/2269/FULElevations6 Aug 2026View
East elevation demolition plan approved under P2023/0382/S73Elevations6 Aug 2026View
North elevation demolition plan approved under P2023/0382/S73Elevations6 Aug 2026View
South elevation demolition plan approved under P2023/0382/S73Elevations6 Aug 2026View
West elevation demolition plan approved under P2021/2269/FULElevations6 Aug 2026View
Ground floor demolition plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Roof plan demolition plan approved under P2021/2269/FULRoof Plans6 Aug 2026View
Second floor demolition plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Third floor demolition plan approved under P2026/0382/S73Floor Plans6 Aug 2026View
Basement demolition plan approved under P2021/2269/FULFloor Plans6 Aug 2026View
Fifth floor demolition plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
First floor demolition plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Fourth floor demolition plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
West elevation approved under P2023/0382/S73Elevations6 Aug 2026View
North elevation approved under P2023/0382/S73Elevations6 Aug 2026View
East elevation approved under P2023/0382/S73Elevations6 Aug 2026View
South eleation approved under P2023/0382/S73Elevations6 Aug 2026View
Street elevation approved under P2023/0382/S73Elevations6 Aug 2026View
Ground floor plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Lower Roof plan approved under P2023/0382/S73Roof Plans6 Aug 2026View
Second floor plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Third floor plan approved under P2026/0382/S73Floor Plans6 Aug 2026View
Upper roof plan approved under P2023/0382/S73Roof Plans6 Aug 2026View
Basement plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Fifth floor plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
First floor plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Fourth floor plan approved under P2023/0382/S73Floor Plans6 Aug 2026View
Section EE approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section FF approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section GG approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section HH approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section II approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section AA approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section BB approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section CC approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Section DD approved under P2023/0382/S73Section - Proposed6 Aug 2026View
Laundry Building South Elevation proposed demolitionDrawings - Proposed - Elevations6 Aug 2026View
Laundry Building West Elevation proposed demolitionDrawings - Proposed - Elevations6 Aug 2026View
Times House proposed east elevation demolitionDrawings - Proposed - Plans6 Aug 2026View
Times House proposed north elevation demolitionDrawings - Proposed - Plans6 Aug 2026View
Times House proposed south elevation demolitionDrawings - Proposed - Plans6 Aug 2026View
Times House proposed west elevation demolitionDrawings - Proposed - Plans6 Aug 2026View
Laundry Building East elevation proposed demolitionDrawings - Proposed - Elevations6 Aug 2026View
Laundry Building North Elevation proposed demolitionDrawings - Proposed - Elevations6 Aug 2026View
fourth floor demolition planDrawings - Existing - Plans6 Aug 2026View
Proposed roof demolitionDrawings - Proposed - Plans6 Aug 2026View
Proposed second floor demolitionDrawings - Proposed - Plans6 Aug 2026View
Proposed third floor demolition planDrawings - Proposed - Plans6 Aug 2026View
Proposed ground floor demolition polanDrawings - Proposed - Plans6 Aug 2026View
Proposed demolition basement planDrawings - Proposed - Plans6 Aug 2026View
fifth floor demolition planDrawings - Existing - Plans6 Aug 2026View
first floor demolition planDrawings - Existing - Plans6 Aug 2026View
Proposed north elevationDrawings - Proposed - Elevations6 Aug 2026View
Proposed south elevationDrawings - Proposed - Elevations6 Aug 2026View
Proposed west elevationDrawings - Proposed - Elevations6 Aug 2026View
Proposed east elevation planDrawings - Proposed - Elevations6 Aug 2026View
Proposed Section BBDrawings - Proposed - Sections6 Aug 2026View
Proposed Section CCDrawings - Proposed - Sections6 Aug 2026View
Proposed Section DDDrawings - Proposed - Sections6 Aug 2026View
Proposed section AADrawings - Proposed - Sections6 Aug 2026View
Proposed first floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed fourth floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed second floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed Sixth floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed third floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed ground floor planDrawings - Proposed - Plans6 Aug 2026View
Proposed basement planDrawings - Proposed - Plans6 Aug 2026View
Proposed fifth floor planDrawings - Proposed - Plans6 Aug 2026View
Design and access statement addendum 2Application Supporting Documents6 Aug 2026View
Design and access statement addendum 3Application Supporting Documents6 Aug 2026View
Design and access statement addendum 1Application Supporting Documents6 Aug 2026View
Times House Laundry Building Area ScheduleApplication Supporting Documents6 Aug 2026View
Times House Area ScheduleApplication Supporting Documents6 Aug 2026View
Laundry Building Area ScheduleApplication Supporting Documents6 Aug 2026View
Transport statementApplication Supporting Documents6 Aug 2026View
Travel planApplication Supporting Documents6 Aug 2026View
Delivery and servicing management planApplication Supporting Documents6 Aug 2026View
Operational waste management planApplication Supporting Documents6 Aug 2026View
Construction traffic management planApplication Supporting Documents6 Aug 2026View
Energy Strategy Planning Addendum 2Application Supporting Documents6 Aug 2026View
Energy Strategy Planning Addendum 3Application Supporting Documents6 Aug 2026View
Energy Strategy Addendum 1Application Supporting Documents6 Aug 2026View
Sustainability Statement addendumApplication Supporting Documents6 Aug 2026View
Town planning statementApplication Supporting Documents6 Aug 2026View
CIL FORMApplication Supporting Documents6 Aug 2026View
Covering letterApplication Supporting Documents6 Aug 2026View
Statement of community involvementApplication Supporting Documents6 Aug 2026View
BNG Calculation and UGF ReviewApplication Supporting Documents6 Aug 2026View
Site location planLocation Plan1 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.