Council planning record

Change of use and alterations to existing building to provide a mixed-use development, comprising the retention of part of the existing Class E floorspace, a hotel (Use Class C1) and Class F1 uses, together with new public realm, access, servicing and associated works. (THIS APPLICATION CONSTITUTES A DEPARTURE FROM THE DEVELOPMENT PLAN) (amended to refer to Departure from the Local Plan).

National Westminster Bank PLC, 40 Islington High Street, London, N1 8EQ

VALIDATEDReference: P2026/2046/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 17:08. Check the council record for more recent changes.

Application location

National Westminster Bank PLC, 40 Islington High Street, London, N1 8EQ

This record has no verified map location.

Application summary

Status
VALIDATED
Application type
Full Planning Application
Received
3 Aug 2026
Validated
17 Aug 2026
Determination deadline
13 Nov 2026
Local authority
London Borough of Islington

Application overview

Change of use and alterations to existing building to provide a mixed-use development, comprising the retention of part of the existing Class E floorspace, a hotel (Use Class C1) and Class F1 uses, together with new public realm, access, servicing and associated works. (THIS APPLICATION CONSTITUTES A DEPARTURE FROM THE DEVELOPMENT PLAN) (amended to refer to Departure from the Local Plan).

Proposal details

Reference
P2026/2046/FUL
Alternative references
PP-15081046
Ward
St Peter's & Canalside
Agent
Sophie Lennon
UPRN
10096363006

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 130 of 130

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted3 Aug 2026View
Marketing Report Appendix CApplication Supporting Documents3 Aug 2026View
Marketing Report Appendix DApplication Supporting Documents3 Aug 2026View
Marketing Report Appendix EApplication Supporting Documents3 Aug 2026View
Marketing Report Appendix FApplication Supporting Documents3 Aug 2026View
Marketing report Appendix AApplication Supporting Documents3 Aug 2026View
Marketing Report Appendix BApplication Supporting Documents3 Aug 2026View
Community Infrastructure Levy - Completed formApplication Supporting Documents3 Aug 2026View
Retail and leisure strategyApplication Supporting Documents3 Aug 2026View
Air quality assessmentApplication Supporting Documents3 Aug 2026View
Tree surveyApplication Supporting Documents3 Aug 2026View
Construction and Environmental Management PlanApplication Supporting Documents3 Aug 2026View
General arrangement ground floor proposed landscapingDrawings - Proposed - Landscaping3 Aug 2026View
General arrangement roof terrace landscapingDrawings - Proposed - Landscaping3 Aug 2026View
Delivery and Servicing planApplication Supporting Documents3 Aug 2026View
Ecology StatementApplication Supporting Documents3 Aug 2026View
Fire StatementApplication Supporting Documents3 Aug 2026View
Flood risk assessmentApplication Supporting Documents3 Aug 2026View
Geotechnical Preliminary Risk Assessment Appendices part 1Application Supporting Documents3 Aug 2026View
Geotechnical Preliminary Risk Assessment Appendices part 2Application Supporting Documents3 Aug 2026View
Geotechnical Preliminary Risk Assessment StatementApplication Supporting Documents3 Aug 2026View
Health Impact AssessmentApplication Supporting Documents3 Aug 2026View
Hotel Demand reportApplication Supporting Documents3 Aug 2026View
Landscape Design and Access Statement part 1Application Supporting Documents3 Aug 2026View
Landscape Design and Access Statement part 2Application Supporting Documents3 Aug 2026View
Landscape Design and Access Statement part 3Application Supporting Documents3 Aug 2026View
WLCA assessment templateApplication Supporting Documents3 Aug 2026View
Noise impact assessmentApplication Supporting Documents3 Aug 2026View
Office demand statementApplication Supporting Documents3 Aug 2026View
Operational Waste Management StrategyApplication Supporting Documents3 Aug 2026View
Outline Construction Logistics PlanApplication Supporting Documents3 Aug 2026View
Outline Hotel Management PlanApplication Supporting Documents3 Aug 2026View
Pre-demolition auditApplication Supporting Documents3 Aug 2026View
Socio Economic StatementApplication Supporting Documents3 Aug 2026View
Statement of community involvementApplication Supporting Documents3 Aug 2026View
Structural Methodology StatementApplication Supporting Documents3 Aug 2026View
Surface Water Management PLanApplication Supporting Documents3 Aug 2026View
Tree Survey referernce planDrawings - Proposed - Landscaping3 Aug 2026View
Tree survey reference planDrawings - Proposed - Landscaping3 Aug 2026View
Soft landscaping plan 1Drawings - Proposed - Landscaping3 Aug 2026View
Soft landscaping plan 2Drawings - Proposed - Landscaping3 Aug 2026View
Tree removal plan 1Drawings - Proposed - Landscaping3 Aug 2026View
Tree removal plan 2Drawings - Proposed - Landscaping3 Aug 2026View
Thermal Comfort Assessment SUPERSEDEDApplication Supporting Documents3 Aug 2026View
Transport Assessment part 1Application Supporting Documents3 Aug 2026View
Transport Assessment part 1Application Supporting Documents3 Aug 2026View
Transport Assessment part 1Application Supporting Documents3 Aug 2026View
Transport Assessment part 1Application Supporting Documents3 Aug 2026View
Transport Assessment part 1Application Supporting Documents3 Aug 2026View
Travel PlanApplication Supporting Documents3 Aug 2026View
Utility AssessmentApplication Supporting Documents3 Aug 2026View
VEntilation and extraction reportApplication Supporting Documents3 Aug 2026View
Heritage and Townscape StatementApplication Supporting Documents3 Aug 2026View
Whole Life Carbon AssessmentApplication Supporting Documents3 Aug 2026View
Circular Economy StatementApplication Supporting Documents3 Aug 2026View
Sustainability StatementApplication Supporting Documents3 Aug 2026View
Residential studyApplication Supporting Documents3 Aug 2026View
Energy StrategyApplication Supporting Documents3 Aug 2026View
Daylight and sunlight reportApplication Supporting Documents3 Aug 2026View
Arboricultural Impact AssessmentApplication Supporting Documents3 Aug 2026View
Access StatementApplication Supporting Documents3 Aug 2026View
Biodiversity Net Gain Assessment StatementApplication Supporting Documents3 Aug 2026View
GLA Circular Economy StatementApplication Supporting Documents3 Aug 2026View
Biodiversity net gain metric matrixApplication Supporting Documents3 Aug 2026View
Cover letterApplication Supporting Documents3 Aug 2026View
Proposed third floorDrawings - Proposed - Plans3 Aug 2026View
Proposed fourth floorDrawings - Proposed - Plans3 Aug 2026View
Proposed fifth floorDrawings - Proposed - Plans3 Aug 2026View
Proposed sixth floorDrawings - Proposed - Plans3 Aug 2026View
Proposed roof planDrawings - Proposed - Plans3 Aug 2026View
Proposed lower ground floorDrawings - Proposed - Plans3 Aug 2026View
Proposed basement floorDrawings - Proposed - Plans3 Aug 2026View
Proposed basement level 002Drawings - Proposed - Plans3 Aug 2026View
Proposed north courtyard elevationDrawings - Proposed - Elevations3 Aug 2026View
Proposed courtyard elevation southDrawings - Proposed - Elevations3 Aug 2026View
Hotel accommodation scheduleApplication Supporting Documents3 Aug 2026View
SIte wide area scheduleApplication Supporting Documents3 Aug 2026View
Proposed block planDrawings - Proposed - Site Layout3 Aug 2026View
Proposed ground floorDrawings - Proposed - Plans3 Aug 2026View
Proposed first floorDrawings - Proposed - Plans3 Aug 2026View
Proposed secondDrawings - Proposed - Plans3 Aug 2026View
Design and access Statement part 1Design and Access Statement3 Aug 2026View
Design and access Statement part 2Design and Access Statement3 Aug 2026View
Design and access Statement part 3Design and Access Statement3 Aug 2026View
Design and access Statement part 4Design and Access Statement3 Aug 2026View
Design and access Statement part 5Design and Access Statement3 Aug 2026View
Design and access Statement part 6Design and Access Statement3 Aug 2026View
Design and access Statement part 7Design and Access Statement3 Aug 2026View
Design and access Statement part 8Design and Access Statement3 Aug 2026View
Design and access Statement part 9Design and Access Statement3 Aug 2026View
cover letterAPPLICATION COVER LETTER3 Aug 2026View
Planning StatementApplication Supporting Documents3 Aug 2026View
residential conversion viability statementApplication Supporting Documents17 Aug 2026View
Thermal Comfort Assessment Revision BApplication Supporting Documents17 Aug 2026View
ground floor site layoutDrawings - Proposed - Site Layout17 Aug 2026View
basement floor site layoutDrawings - Proposed - Site Layout17 Aug 2026View
lower ground floor site layoutDrawings - Proposed - Site Layout17 Aug 2026View
Proposed elevations (NORTH AND WEST)Drawings - Proposed - Elevations20 Aug 2026View
Proposed elevations (SOUTH AND EAST)Drawings - Proposed - Elevations20 Aug 2026View
Proposed contiguous courtyard elevationsDrawings - Proposed - Elevations20 Aug 2026View
Proposed sections 01 and 02Drawings - Proposed - Sections20 Aug 2026View
Proposed sections 03 and 04Drawings - Proposed - Sections20 Aug 2026View
existing ground floorPlans/Drawings/Photo20 Aug 2026View
existing fourth floorDrawings - Existing - Plans20 Aug 2026View
existing fifth floorDrawings - Existing - Plans20 Aug 2026View
existing sixth floorDrawings - Existing - Plans20 Aug 2026View
existing basement 001Drawings - Existing - Plans20 Aug 2026View
existing basement 002Drawings - Existing - Plans20 Aug 2026View
existing basement 003Drawings - Existing - Plans20 Aug 2026View
existing roof planDrawings - Existing - Plans20 Aug 2026View
existing courtyard elevationsDrawings - Existing - Elevations20 Aug 2026View
existing southeast elevationDrawings - Existing - Elevations20 Aug 2026View
exisitng northwest elevationDrawings - Existing - Elevations20 Aug 2026View
existing southwest elevationDrawings - Existing - Elevations20 Aug 2026View
existing northeast elevationDrawings - Existing - Elevations20 Aug 2026View
existing section 01Drawings - Existing Sections20 Aug 2026View
existing section 02Drawings - Existing Sections20 Aug 2026View
existing section 03Drawings - Existing Sections20 Aug 2026View
existing section 04Drawings - Existing Sections20 Aug 2026View
existing section 05Drawings - Existing Sections20 Aug 2026View
existing section 06Drawings - Existing Sections20 Aug 2026View
existing section 07Drawings - Existing Sections20 Aug 2026View
existing section 08Drawings - Existing Sections20 Aug 2026View
existing first floor planDrawings - Existing - Plans20 Aug 2026View
existing second floor planDrawings - Existing - Plans20 Aug 2026View
existing third floor planDrawings - Existing - Plans20 Aug 2026View
proposed ground floorDrawings - Proposed - Plans20 Aug 2026View
proposed basementDrawings - Proposed - Plans20 Aug 2026View
proposed lower ground floorDrawings - Proposed20 Aug 2026View
Updated drainage assessmentApplication Supporting Documents1 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.