3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: CIP_03-IA-00-ZZ-DR-A-2015A Rev. P00 Proposed GA Elevations Front (A); CIP_03-IA-00-ZZ-DR-A-2015B Rev. P00 Proposed GA Elevations Front (B); CIP_03-IA-00-ZZ-DR-A-2016 Rev. P00 Proposed GA Elevations Sides 01 + 02; CIP_03-IA-00-ZZ-DR-A-2017A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2017B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2000 Rev. P00 Proposed GA Elevations Front and Side 01; CIP_03-IA-00-ZZ-DR-A-2021 Rev. P00 Proposed GA Elevations Rear and Side 02; CIP_03-IA-00-ZZ-DR-A-2022A Rev. P00 Proposed GA Elevations Front; CIP_03-IA-00-ZZ-DR-A-2022B Rev. P00 Proposed GA Elevations Front (B); CIP_03-IA-00-ZZ-DR-A-2023 Rev. P00 Proposed GA Elevations Side 01; CIP_03-IA-00-ZZ-DR-A-2024A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2024B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2025 Rev. P00 Proposed GA Elevations Side 02; CIP_03-IA-00-ZZ-DR-A-2026A Rev. P00 Proposed GA Elevations Front (A); CIP_03-IA-00-ZZ-DR-A-2026B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2027 Rev. P00 Proposed GA Elevations Side 01 + 02; CIP_03-IA-00-ZZ-DR-A-2028A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2028B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2029 Rev. P00 Proposed GA Elevations Front; CIP_03-IA-00-ZZ-DR-A-2030 Rev. P00 Proposed GA Elevations Sides; CIP_03-IA-00-ZZ-DR-A-2031 Rev. P00 Proposed GA Elevations Rear; CIP_03-IA-00-ZZ-DR-A-2035A Rev. P00 Proposed GA Elevations Front (A); CIP_03-IA-00-ZZ-DR-A-2035B Rev. P00 Proposed GA Elevations Front (B); CIP_03-IA-00-ZZ-DR-A-2036 Rev. P00 Proposed GA Elevations Sides 01 + 02 CIP_03-IA-00-ZZ-DR-A-2037A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2037B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2038A Rev. P00 Proposed GA Elevations Front (A); CIP_03-IA-00-ZZ-DR-A-2038B Rev. P00 Proposed GA elevations Front (B); CIP_03-IA-00-ZZ-DR-A-2039 Rev. P00 Proposed GA Elevations Side 01 + 02; CIP_03-IA-00-ZZ-DR-A-2040A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2040B Rev. P00 Proposed GA Elevations Rear (B); CIP_03-IA-00-ZZ-DR-A-2041 Rev. P00 Proposed GA Elevations Front; CIP_03-IA-00-ZZ-DR-A-2042 Rev. P00 Proposed GA Elevations Side 01 + 02; CIP_03-IA-00-ZZ-DR-A-2043 Rev. P00 Proposed GA Elevations Rear; CIP_03-IA-00-ZZ-DR-A-2044A Rev. P00 Proposed GA Elevations Front (A); CIP_03-IA-00-ZZ-DR-A-2044B Rev. P00 Proposed GA Elevations Front (B); CIP_03-IA-00-ZZ-DR-A-2024 Rev. P00 Proposed GA Elevations Sides 01 + 02; CIP_03-IA-00-ZZ-DR-A-2046A Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2046B Rev. P00 Proposed GA Elevations Rear (A); CIP_03-IA-00-ZZ-DR-A-2047 Rev. P00 Proposed GA Elevations Front; CIP_03-IA-00-ZZ-DR-A-2048 Rev. P00 Proposed GA Elevations Sides 01 + 02; CIP_03-IA-00-ZZ-DR-A-2049 Rev. P00 Proposed GA Elevations Rear; CIP_03-IA-00-ZZ-DR-A-3021 Rev. P00 Type 1 - uPVC window details (All window types will have same profiles); CIP_03-IA-00-ZZ-DR-A-3022 Rev. P00 Comparative Window Type 1 details - uPVC and Timber casement; CIP_03-IA-00-ZZ-DR-A-6001 Rev. P00 Proposed Window Schedule Sheet 1; CIP_03-IA-00-ZZ-DR-A-6002 Rev. P00 Proposed Window Schedule Sheet 2; CIP_03-IA-00-ZZ-DR-A-6003 Rev. P00 Proposed Window Schedule Sheet 3; CIP_03-IA-00-ZZ-DR-A-6004 Rev. P00 Proposed Door Schedule Sheet 1; CIP_03-IA-00-ZZ-DR-A-6005 Rev. P00 Proposed Door Schedule Sheet 2; Sustainable Design and Construction Template 01; Tiber Gardens and Treaty Street Window replacement Design and Access Statement Islington architects Issue A July 2026 REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
CONSTRUCTION NOISE: Noise from demolition and construction works is subject to control under the Control of Pollution Act 1974. You must carry out any building works that can be heard at the boundary of the site only between 08.00 and 18.00 hours Monday to Friday and 08.00 to 13.00 on Saturday and not at all on Sundays and Public Holidays. You are advised to consult the Pollution Team, Islington Council, 222 Upper Street London N1 1XR (by email pollution@islington.gov.uk ) or seek prior approval under Section 61 of the Act if you anticipate any difficulty in carrying out construction other than within the hours stated above.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.