Council planning record

Works to external terraces (levels 2, 3, 4, 5 & 6) including replacement of uninsulated asphalt and concrete paviours with insulated roofing membrane and terrace tile finishes; replacement of existing mesh terrace dividers with integrated planter terrace dividers and addition of parapet extenders; roof refurbishment works to level 8 (above stairwell)

York Central, 70-78 York Way, London, N1 9AG

VALIDATEDReference: P2026/1965/FULLondon Borough of Islington

Last published check: 3 Oct 2026, 04:06. Check the council record for more recent changes.

Application location

York Central, 70-78 York Way, London, N1 9AG

This record has no verified map location.

Application summary

Status
VALIDATED
Application type
Full Planning Application
Received
23 Jul 2026
Validated
26 Aug 2026
Determination deadline
12 Oct 2026
Local authority
London Borough of Islington

Application overview

Works to external terraces (levels 2, 3, 4, 5 & 6) including replacement of uninsulated asphalt and concrete paviours with insulated roofing membrane and terrace tile finishes; replacement of existing mesh terrace dividers with integrated planter terrace dividers and addition of parapet extenders; roof refurbishment works to level 8 (above stairwell)

Proposal details

Reference
P2026/1965/FUL
Alternative references
PP-14922095
Ward
Caledonian
Agent
Mr Adrian Friend
UPRN
10012789560

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 42 of 42

DocumentPublishedAction
Application Form (Redacted)Default23 Jul 2026View
Site Location PlanDefault23 Jul 2026View
CIL FormDefault23 Jul 2026View
Design & Access StatementDefault23 Jul 2026View
Existing Ground Floor PlanDefault23 Jul 2026View
Existing First Floor PlanDefault23 Jul 2026View
Existing Second Floor PlanDefault23 Jul 2026View
Existing Third Floor PlanDefault23 Jul 2026View
Existing Fourth Floor PlanDefault23 Jul 2026View
Existing Fifth Floor PlanDefault23 Jul 2026View
Existing Sixth Floor PlanDefault23 Jul 2026View
Block PlanDefault23 Jul 2026View
Location PlanDefault23 Jul 2026View
Existing Fourth, Fifth & Sixth Floor Terrace PlansDefault23 Jul 2026View
Existing Second & Third Floor Terrace ElevationsDefault23 Jul 2026View
Existing Fourth, Fifth & Sixth Floor Terrace ElevationsDefault23 Jul 2026View
Proposed Second Floor PlanDefault23 Jul 2026View
Proposed Third Floor PlanDefault23 Jul 2026View
Proposed Fourth Floor PlanDefault23 Jul 2026View
Proposed Fifth Floor PlanDefault23 Jul 2026View
Proposed Sixth Floor PlanDefault23 Jul 2026View
Proposed Second & Third Floor Terrace ElevationsDefault23 Jul 2026View
Proposed Fourth, Fifth & Sixth Floor Terrace ElevationsDefault23 Jul 2026View
Proposed Second & Third Floor Terrace PlansDefault23 Jul 2026View
Proposed Fourth Fifth & Sixth Floor Terrace PlansDefault23 Jul 2026View
Screen Divider DetailDefault23 Jul 2026View
Parapet Extender Axo DetailDefault23 Jul 2026View
Parapet Extender DetailDefault23 Jul 2026View
Existing Slab Structure DetailDefault23 Jul 2026View
Parapet Render Fixings DetailDefault23 Jul 2026View
Proposed Terrace Dividers DetailDefault23 Jul 2026View
Covering LetterDefault23 Jul 2026View
Bauder Roof System Thermal CalculationsDefault26 Aug 2026View
Fire StatementDefault26 Aug 2026View
Sustainable Design & Construction StatementDefault26 Aug 2026View
Drawing ScheduleDefault26 Aug 2026View
Existing Front Elevation (York Way)Default26 Aug 2026View
Existing Rear Elevation (Crinan Street)Default26 Aug 2026View
Existing Side Elevations and ReturnsDefault26 Aug 2026View
Proposed Front Elevation (York Way)Default26 Aug 2026View
Proposed Rear Elevation (Crinan Street)Default26 Aug 2026View
Proposed Side Elevations and ReturnsDefault26 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision due date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Consultation expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Statutory expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.