Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
York Central, 70-78 York Way, London, N1 9AG
Last published check: 3 Oct 2026, 04:06. Check the council record for more recent changes.
York Central, 70-78 York Way, London, N1 9AG
This record has no verified map location.
Works to external terraces (levels 2, 3, 4, 5 & 6) including replacement of uninsulated asphalt and concrete paviours with insulated roofing membrane and terrace tile finishes; replacement of existing mesh terrace dividers with integrated planter terrace dividers and addition of parapet extenders; roof refurbishment works to level 8 (above stairwell)
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Application Form (Redacted)Default | 23 Jul 2026 | View |
| Site Location PlanDefault | 23 Jul 2026 | View |
| CIL FormDefault | 23 Jul 2026 | View |
| Design & Access StatementDefault | 23 Jul 2026 | View |
| Existing Ground Floor PlanDefault | 23 Jul 2026 | View |
| Existing First Floor PlanDefault | 23 Jul 2026 | View |
| Existing Second Floor PlanDefault | 23 Jul 2026 | View |
| Existing Third Floor PlanDefault | 23 Jul 2026 | View |
| Existing Fourth Floor PlanDefault | 23 Jul 2026 | View |
| Existing Fifth Floor PlanDefault | 23 Jul 2026 | View |
| Existing Sixth Floor PlanDefault | 23 Jul 2026 | View |
| Block PlanDefault | 23 Jul 2026 | View |
| Location PlanDefault | 23 Jul 2026 | View |
| Existing Fourth, Fifth & Sixth Floor Terrace PlansDefault | 23 Jul 2026 | View |
| Existing Second & Third Floor Terrace ElevationsDefault | 23 Jul 2026 | View |
| Existing Fourth, Fifth & Sixth Floor Terrace ElevationsDefault | 23 Jul 2026 | View |
| Proposed Second Floor PlanDefault | 23 Jul 2026 | View |
| Proposed Third Floor PlanDefault | 23 Jul 2026 | View |
| Proposed Fourth Floor PlanDefault | 23 Jul 2026 | View |
| Proposed Fifth Floor PlanDefault | 23 Jul 2026 | View |
| Proposed Sixth Floor PlanDefault | 23 Jul 2026 | View |
| Proposed Second & Third Floor Terrace ElevationsDefault | 23 Jul 2026 | View |
| Proposed Fourth, Fifth & Sixth Floor Terrace ElevationsDefault | 23 Jul 2026 | View |
| Proposed Second & Third Floor Terrace PlansDefault | 23 Jul 2026 | View |
| Proposed Fourth Fifth & Sixth Floor Terrace PlansDefault | 23 Jul 2026 | View |
| Screen Divider DetailDefault | 23 Jul 2026 | View |
| Parapet Extender Axo DetailDefault | 23 Jul 2026 | View |
| Parapet Extender DetailDefault | 23 Jul 2026 | View |
| Existing Slab Structure DetailDefault | 23 Jul 2026 | View |
| Parapet Render Fixings DetailDefault | 23 Jul 2026 | View |
| Proposed Terrace Dividers DetailDefault | 23 Jul 2026 | View |
| Covering LetterDefault | 23 Jul 2026 | View |
| Bauder Roof System Thermal CalculationsDefault | 26 Aug 2026 | View |
| Fire StatementDefault | 26 Aug 2026 | View |
| Sustainable Design & Construction StatementDefault | 26 Aug 2026 | View |
| Drawing ScheduleDefault | 26 Aug 2026 | View |
| Existing Front Elevation (York Way)Default | 26 Aug 2026 | View |
| Existing Rear Elevation (Crinan Street)Default | 26 Aug 2026 | View |
| Existing Side Elevations and ReturnsDefault | 26 Aug 2026 | View |
| Proposed Front Elevation (York Way)Default | 26 Aug 2026 | View |
| Proposed Rear Elevation (Crinan Street)Default | 26 Aug 2026 | View |
| Proposed Side Elevations and ReturnsDefault | 26 Aug 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceWe haven’t collected any decision conditions for this application.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.