3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: A 0047 GA 00 2001 (20) GA Proposed Plans; A 0047 GA 00 2002 01 Rev. 01 First Floor Plans; A 0047 GA 00 2003 (20) GA Roof Plans; A 0047 GA 00 2006 01 Rev. 01 (20) GA Proposed Elevations; A 0047 GA 00 2008 (20) Proposed Section; Location Plan dated 17-Jul-2026; Heritage Statement prepared by anna janiak studio; Sustainable Design and Construction Statement. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
GREEN/BROWN BIODIVERSITY ROOFS (COMPLIANCE): The green roof hereby approved shall be: a) biodiversity based with extensive substrate base (depth 80-150mm); b) laid out in accordance with plan A 0047 GA 00 2002 01 hereby approved; and c) planted/seeded with a mix of species within the first planting season following the practical completion of the building works (the seed mix shall be focused on wildflower planting, and shall contain no more than a maximum of 25% sedum). The biodiversity green roof shall not be used as an amenity or sitting out space of any kind whatsoever and shall only be used in the case of essential maintenance or repair, or escape in case of emergency. The biodiversity roof shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: To ensure the development provides the maximum possible provision towards creation of habitats and valuable areas for biodiversity.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.