Council planning record

Installation of rooftop plant, roof cowls, ductwork, pipework, weatherproofing and associated works to serve the fifth floor only, following the removal of existing plant equipment.

Arts Building, 2 - 10 Morris Place, London, N4 3JG

FINAL DECISIONReference: P2026/1813/FULLondon Borough of Islington

Last published check: 29 Sept 2026, 05:28. Check the council record for more recent changes.

Application location

Arts Building, 2 - 10 Morris Place, London, N4 3JG

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
8 Jul 2026
Validated
20 Jul 2026
Determination deadline
1 Sept 2026
Local authority
London Borough of Islington

Application overview

Installation of rooftop plant, roof cowls, ductwork, pipework, weatherproofing and associated works to serve the fifth floor only, following the removal of existing plant equipment.

Proposal details

Reference
P2026/1813/FUL
Alternative references
PP-14960663
Ward
Finsbury Park
Agent
Sarah Williamson
UPRN
10091002420

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted8 Jul 2026View
Roof Plan - ExistingDrawings - Existing8 Jul 2026View
Proposed Site PlanDrawings - Proposed8 Jul 2026View
Roof Plan - ProposedDrawings - Proposed8 Jul 2026View
Location PlanLocation Plan8 Jul 2026View
Elevations - ExistingDrawings - Existing8 Jul 2026View
Elevations - ProposedDrawings - Proposed8 Jul 2026View
Covering letterSupporting Documentation8 Jul 2026View
Reasonable Exemption StatementSupporting Documentation8 Jul 2026View
Site PhotosPhotographs8 Jul 2026View
Sustainable Design and Construction StatementSupporting Documentation8 Jul 2026View
Noise Impact AssessmentSupporting Documentation8 Jul 2026View
Community Infrastructure Levy - Completed formSupporting Documentation8 Jul 2026View
delegated reportDelegated Report24 Sept 2026View
dn finalDecision Notice Final24 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
dn final
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: NLFT IWDXXXXDRA210100 P01; NLFT IWDXXXXDRA232000 P01; NLFT IWDXXRFDRA231002 P01; NLFT IWDXXRFDRA211101 P01 and Statement on Sustainability Design and Construction of the Proposal prepared by Ingleton Wood; Noise Impact Assessment for proposed installation of mechanical plant (reference JM31/26113/Rev. 0 dated 22/06/2026). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. PLANT NOISE LIMIT CONDITION (COMPLIANCE): The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: To protect neighbouring amenity.
  5. PLANT TIME LIMIT CONDITION (COMPLIANCE): Prior to the first use of the approved plant equipment, a timer shall be installed limiting the operation of all plant to between the hours of 07:00 to 19:00 Monday to Friday only. The plant shall not be operated outside of these hours. The timer shall be maintained as such thereafter in perpetuity. REASON: To protect neighbouring amenity.
  6. PLANT MAINTAINENACE: The applicant is advised that Islington have a duty to investigate any complaints in terms of statutory nuisance. It is also advised that the plant is checked upon installation and regularly checked, maintained and serviced to ensure noise levels do not rise or acoustic character such as tonality, intermittency, impulsivity or other acoustic character develop. The units should be installed on a solid base with appropriate isolation to minimise vibration and structure-borne noise transmission.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.