Council planning record

All works as per per previous consents (application no P2018/3003/TRE, P2021/1670/TRE and P2023/2587) 3 x Lime Trees - overall growth reduction to previous outermost pruning points (approx 2m branch length). On building side reduce to approx 3m branch length (including removal of side branches to approx 100mm diameter to inner pruning points) to create 3m clearance from building . Removal of basal & epicormic growth. Reasons for work: branches sweeping residents' windows, banging in the wind and blocking out significant amount of natural light.

1 Harecourt Road, London, N1 2LW

FINAL DECISIONReference: P2026/1796/TRELondon Borough of Islington

Last published check: 29 Sept 2026, 13:16. Check the council record for more recent changes.

Application location

1 Harecourt Road, London, N1 2LW

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Works application to tree with Tree Preservation Order
Received
7 Jul 2026
Validated
10 Jul 2026
Determination deadline
3 Sept 2026
Local authority
London Borough of Islington

Application overview

All works as per per previous consents (application no P2018/3003/TRE, P2021/1670/TRE and P2023/2587) 3 x Lime Trees - overall growth reduction to previous outermost pruning points (approx 2m branch length). On building side reduce to approx 3m branch length (including removal of side branches to approx 100mm diameter to inner pruning points) to create 3m clearance from building . Removal of basal & epicormic growth. Reasons for work: branches sweeping residents' windows, banging in the wind and blocking out significant amount of natural light.

Proposal details

Reference
P2026/1796/TRE
Alternative references
PP-15068418
Ward
Mildmay
UPRN
5300040503

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
File Size: 197479, Reference: Application Form - Without Personal DataDefault7 Jul 2026View
File Size: 248905, Reference: Additional plansDefault7 Jul 2026View
1_Harecourt.pdfDelegated Report20 Aug 2026View
943142-943137T-_Decision_Notice_-AP8_351_v1.pdfTrees - Final Decision Note20 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
943142-943137T-_Decision_Notice_-AP8_351_v1.pdf
Planning conditions
  1. TREE WORKS (COMPLIANCE): All tree work shall be carried out in accordance with British Standard BS3998 - Recommendations for Tree Work. In addition: a) No fires shall be lit within [10] metres of the nearest point of the canopy of any retained tree. No equipment, machinery or structure shall be attached to or supported by a retained tree. b) No mixing of cement or use of other contaminating materials or substances shall take place within, or close enough to, a root protection area that seepage or displacement could cause them to enter a root protection area. c) No alterations or variations to the approved works or tree protection schemes shall be made without prior written consent of the local planning authority. REASON: In the interest of the protection of trees and to safeguard visual amenities.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.