Council planning record

Proposed reconfiguration of the lower ground floor, including remedial damp-proofing works; demolition of the existing non-original single-storey glazed link and its replacement with a lightweight glazed entrance structure; together with the reinstatement of traditional internal detailing, including joinery and cornicing, the replacement of existing windows with double-glazed timber units, and associated courtyard landscaping and accessibility alterations.

24 Sudeley Street, London, N1 8HP

FINAL DECISIONReference: P2026/1759/FULLondon Borough of Islington

Last published check: 29 Sept 2026, 06:29. Check the council record for more recent changes.

Application location

24 Sudeley Street, London, N1 8HP

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
2 Jul 2026
Validated
17 Jul 2026
Determination deadline
26 Aug 2026
Local authority
London Borough of Islington

Application overview

Proposed reconfiguration of the lower ground floor, including remedial damp-proofing works; demolition of the existing non-original single-storey glazed link and its replacement with a lightweight glazed entrance structure; together with the reinstatement of traditional internal detailing, including joinery and cornicing, the replacement of existing windows with double-glazed timber units, and associated courtyard landscaping and accessibility alterations.

Proposal details

Reference
P2026/1759/FUL
Alternative references
PP-15049143
Ward
St Peter's & Canalside
Agent
NTA Planning LLP
UPRN
5300088593

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 58 of 58

DocumentPublishedAction
Application Form - Without Personal DataApplication Form2 Jul 2026View
SUPERSEDED Proposed Roof PlanApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed Side ElevationApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed Section AAApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed Section BBApplication Drawings - Superseded2 Jul 2026View
Window ScheduleDrawings - Proposed2 Jul 2026View
Window ScheduleDrawings - Proposed2 Jul 2026View
Typical Basement Floor to WallDrawings - Proposed2 Jul 2026View
Window Details 1Drawings - Proposed2 Jul 2026View
Window Details 2Drawings - Proposed2 Jul 2026View
Mouldings DetailsDrawings - Proposed2 Jul 2026View
Typical Staircase DetailDrawings - Proposed2 Jul 2026View
Proposed Section through Glazed LinkDrawings - Proposed2 Jul 2026View
Existing LGF PlanDrawings - Existing2 Jul 2026View
Existing GF PlanDrawings - Existing2 Jul 2026View
Existing FF PlanDrawings - Existing2 Jul 2026View
Existing SF PlanDrawings - Existing2 Jul 2026View
Existing Roof PlanDrawings - Existing2 Jul 2026View
Existing Side ElevationDrawings - Existing2 Jul 2026View
Existing Section AADrawings - Existing2 Jul 2026View
Existing Section BBDrawings - Existing2 Jul 2026View
Proposed LGF PlanDrawings - Proposed2 Jul 2026View
SUPERSEDED Proposed GF PlanApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed FF PlanApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed SF PlanApplication Drawings - Superseded2 Jul 2026View
Sustainability statement - SupersededSupporting Documentation2 Jul 2026View
Design and access statementDesign and Access Statement2 Jul 2026View
The location planDrawings - Existing2 Jul 2026View
SUPERSEDED Proposed Front Elevation and Section DDApplication Drawings - Superseded2 Jul 2026View
SUPERSEDED Proposed Rear Elevation and Section CCApplication Drawings - Superseded2 Jul 2026View
Drawings ListDrawings - Proposed2 Jul 2026View
Community Infrastructure Levy - Completed formSupporting Documentation2 Jul 2026View
Heritage StatementHeritage Statement2 Jul 2026View
Historic Floor PlanDrawings - Existing2 Jul 2026View
Sump Chamber InstallationSupporting Documentation2 Jul 2026View
Recessed ChamberSupporting Documentation2 Jul 2026View
Planning statementSupporting Documentation2 Jul 2026View
SUPERSEDED Proposed Rear Elevation and Section CC Rev DApplication Drawings - Superseded21 Sept 2026View
SUPERSEDED Proposed Section BB Rev CApplication Drawings - Superseded21 Sept 2026View
SUPERSEDED Proposed Section AA Rev CApplication Drawings - Superseded21 Sept 2026View
SUPERSEDED Proposed Side Elevation Rev CApplication Drawings - Superseded21 Sept 2026View
Proposed Roof Plan Rev BDrawings - Proposed21 Sept 2026View
SUPERSEDED Proposed Front Elevation and Section DD Rev CApplication Drawings - Superseded21 Sept 2026View
Proposed SF Plan Rev BDrawings - Proposed21 Sept 2026View
Proposed FF Plan Rev BDrawings - Proposed21 Sept 2026View
Drawing List of RevisionsDrawings - Proposed24 Sept 2026View
Proposed Rear Elevation and Section CC Rev EDrawings - Proposed24 Sept 2026View
SUPERSEDED Proposed Section BB Rev DApplication Drawings - Superseded24 Sept 2026View
Proposed Section AA Rev DDrawings - Proposed24 Sept 2026View
Proposed Side Elevation Rev DDrawings - Proposed24 Sept 2026View
Proposed Front Elevation and Section DD Rev DDrawings - Proposed24 Sept 2026View
Existing Rear Elevation and Section CC Rev ADrawings - Existing24 Sept 2026View
Existing Front Elevation and Section DD Rev ADrawings - Existing24 Sept 2026View
Proposed Section BB Rev EDrawings - Proposed28 Sept 2026View
Proposed GF PlanDrawings - Proposed28 Sept 2026View
Sustainability statement - RevisedSupporting Documentation28 Sept 2026View
delegated reportDelegated Report28 Sept 2026View
DN FINALDecision Notice28 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN FINAL
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 338-A-001 Existing Site Location Plan, 338-A-053 Proposed Lower Ground Floor Plan, 338-A-054 Rev D Proposed Ground Floor Plan, 338-A-055 Rev B Proposed First Floor Plan, 338-A-055 Rev B Proposed Second Floor Plan, 338-A-057 Rev B Proposed Roof Plan, 338-A-061 Rev D Proposed Front Elevation & Section D-D, 338-A-062 Rev D Proposed Side Elevation, 338-A-063 Rev D Proposed Section A-A, 338-A-064 Rev E Proposed Section B-B, 338-A-065 Rev E Proposed Rear Elevation & Section C-C, 338-A-071 Window Schedule ½, 338-A-081 Typical Basement Wall to Floor Waterproofing Detail, 338-A-082 Typical Window Details – 1, 338-A-083 Typical Window Details – 2, 338-A-084 Typical Mouldings Details, 338-A-085 Proposed Typical Staircase Detail 338-A-086 Proposed Section Through Glazed Link, Sustainable Design & Construction Statement - Revised 28th September 2026 REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Sustainable Design and Construction Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.