Council planning record

Proposed reconfiguration of the lower ground floor, including remedial damp-proofing works; demolition of the existing non-original single-storey glazed link and its replacement with a lightweight glazed entrance structure; together with the reinstatement of traditional internal detailing, including joinery and cornicing, the replacement of existing windows with double-glazed timber units, and associated courtyard landscaping and accessibility alterations.

24 Sudeley Street, London, N1 8HP

FINAL DECISIONReference: P2026/1758/LBCLondon Borough of Islington

Last published check: 29 Sept 2026, 06:33. Check the council record for more recent changes.

Application location

24 Sudeley Street, London, N1 8HP

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
2 Jul 2026
Validated
17 Jul 2026
Determination deadline
26 Aug 2026
Local authority
London Borough of Islington

Application overview

Proposed reconfiguration of the lower ground floor, including remedial damp-proofing works; demolition of the existing non-original single-storey glazed link and its replacement with a lightweight glazed entrance structure; together with the reinstatement of traditional internal detailing, including joinery and cornicing, the replacement of existing windows with double-glazed timber units, and associated courtyard landscaping and accessibility alterations.

Proposal details

Reference
P2026/1758/LBC
Alternative references
PP-15049143_C
Ward
St Peter's & Canalside
Agent
NTA Planning LLP
UPRN
5300088593

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 36 of 36

DocumentPublishedAction
Application Form - Without Personal DataApplication Form2 Jul 2026View
Proposed Roof PlanDrawings - Proposed2 Jul 2026View
Proposed Side ElevationDrawings - Proposed2 Jul 2026View
Proposed Section AADrawings - Proposed2 Jul 2026View
Proposed Section BBDrawings - Proposed2 Jul 2026View
Window ScheduleDrawings - Proposed2 Jul 2026View
Window ScheduleDrawings - Proposed2 Jul 2026View
Typical Basement Floor to WallDrawings - Proposed2 Jul 2026View
Window Details 1Drawings - Proposed2 Jul 2026View
Window Details 2Drawings - Proposed2 Jul 2026View
Typical Staircase DetailDrawings - Proposed2 Jul 2026View
Proposed Section Through LinkDrawings - Proposed2 Jul 2026View
Existing LGF PlanDrawings - Existing2 Jul 2026View
Existing GF PlanDrawings - Existing2 Jul 2026View
Existing First Floor PlanDrawings - Existing2 Jul 2026View
Existing Second Floor PlanDrawings - Existing2 Jul 2026View
Existing Roof PlanDrawings - Existing2 Jul 2026View
Existing Side ElevationDrawings - Existing2 Jul 2026View
Existing Section AADrawings - Existing2 Jul 2026View
Existing Section BBDrawings - Existing2 Jul 2026View
Proposed LGF PlanDrawings - Proposed2 Jul 2026View
Proposed GF PlanDrawings - Proposed2 Jul 2026View
Proposed FF PlanDrawings - Proposed2 Jul 2026View
Proposed SF PlanDrawings - Proposed2 Jul 2026View
Sustainability StatementSupporting Documentation2 Jul 2026View
Design and access statementDesign and Access Statement2 Jul 2026View
The location planDrawings - Existing2 Jul 2026View
Proposed Front Elevation and Section DDDrawings - Proposed2 Jul 2026View
Porposed Rear Elevation and Section CCDrawings - Proposed2 Jul 2026View
Drawings sheetDrawings - Proposed2 Jul 2026View
Community Infrastructure Levy - Completed formSupporting Documentation2 Jul 2026View
Heritage StatementHeritage Statement2 Jul 2026View
Sump chamber installation guideSupporting Documentation2 Jul 2026View
Recessed ChannelSupporting Documentation2 Jul 2026View
Planning statementSupporting Documentation2 Jul 2026View
DN FINALDecision Notice Final28 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN FINAL
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. ALL EXTERNAL AND INTERNAL WORKS TO MATCH (COMPLIANCE): All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  3. 338-A-001 Existing Site Location Plan, 338-A-053 Proposed Lower Ground Floor Plan, 338-A-054 Rev D Proposed Ground Floor Plan, 338-A-055 Rev B Proposed First Floor Plan, 338-A-055 Rev B Proposed Second Floor Plan, 338-A-057 Rev B Proposed Roof Plan, 338-A-061 Rev D Proposed Front Elevation & Section D-D, 338-A-062 Rev D Proposed Side Elevation, 338-A-063 Rev D Proposed Section A-A, 338-A-064 Rev E Proposed Section B-B, 338-A-065 Rev E Proposed Rear Elevation & Section C-C, 338-A-071 Window Schedule ½, 338-A-081 Typical Basement Wall to Floor Waterproofing Detail, 338-A-082 Typical Window Details – 1, 338-A-083 Typical Window Details – 2, 338-A-084 Typical Mouldings Details, 338-A-085 Proposed Typical Staircase Detail 338-A-086 Proposed Section Through Glazed Link, Sustainable Design & Construction Statement- Revised 28th September 2026
  4. LISTED BUILDING CONSENT ONLY: This consent relates solely to listed building matters. Should it become necessary to make alterations to the consented scheme in order to comply with other legislation, such as Building Regulations, a further consent may be required. Such a consent should be sought and obtained prior to the relevant works being undertaken.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.