ApprovedCouncil status: FINAL DECISION

Proposed alterations to the first-floor rear elevation and rear mansard roof: new and amended openings, replacement of existing timber door, installation of rooflights, and addition of a timber deck to existing roof terrace. Installation of a new rooflight to front roof slope. Replacement of existing sash windows with double-glazed timber sash windows to the front and rear elevations. (Part retrospective).

Top Floor Flat, 60 Gladsmuir Road, N19 3JU

London Borough of IslingtonReference P2026/1749/FULFull Planning Application

Last published check: 29 Sept 2026, 08:20. Check the council record for more recent changes.

Status and dates

Last published check: 29 Sept 2026, 08:20 (UK)

  1. DoneReceived1 Jul 2026
  2. DoneValidated15 Jul 2026
  3. ClosedConsultationEnded 13 Aug 2026
  4. Date set by councilTarget decision date25 Aug 2026
  5. DecidedApprove with conditions20 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (13)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Application
Ward
Hillrise
Documents
20 published

Proposal

Proposed alterations to the first-floor rear elevation and rear mansard roof: new and amended openings, replacement of existing timber door, installation of rooflights, and addition of a timber deck to existing roof terrace. Installation of a new rooflight to front roof slope. Replacement of existing sash windows with double-glazed timber sash windows to the front and rear elevations. (Part retrospective).

Reference
P2026/1749/FUL
Alternative references
PP-14986626
Ward
Hillrise
Agent
Marie Magnien
UPRN
5300036127

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form - Without Personal DataApplication Form - Redacted1 Jul 2026View
  • Location PlanLocation Plan1 Jul 2026View
  • Design and Access StatementSupporting Documentation1 Jul 2026View
  • Community Infrastructure Levy - Completed formSupporting Documentation1 Jul 2026View
  • Existing and Proposed Block PlansDrawings - Proposed - Combined1 Jul 2026View
  • Existing First Floor PlanDrawings - Existing1 Jul 2026View
  • Existing Second Floor PlanDrawings - Existing1 Jul 2026View
  • Existing Roof PlanDrawings - Existing1 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan; 01-001; 01-005; 01-006; 02-002; 02-003; 02-004; 02-004; 02-005; 02-006; 02-007; Sustainable Design and Construction Statement; Design & Access Statement dated June 2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design & Access Statement dated June 2026. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. CONSERVATION ROOFLIGHTS (COMPLIANCE): The roof lights hereby approved shall be 'conservation rooflights' in metal painted black to sit flush with the roof and shall be maintained as such thereafter. REASON: In order to safeguard the character and appearance of the conservation area.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.