Council planning record

Replacement of roof coverings, including lead linings, ridge tiles and flashings throughout (Full Planning ref: P2026/1741/FUL also submitted).

9 Northampton Park, London, N1 2PP

FINAL DECISIONReference: P2026/1743/LBCLondon Borough of Islington

Last published check: 29 Sept 2026, 14:16. Check the council record for more recent changes.

Application location

9 Northampton Park, London, N1 2PP

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Listed Building
Received
1 Jul 2026
Validated
10 Jul 2026
Determination deadline
25 Aug 2026
Local authority
London Borough of Islington

Application overview

Replacement of roof coverings, including lead linings, ridge tiles and flashings throughout (Full Planning ref: P2026/1741/FUL also submitted).

Proposal details

Reference
P2026/1743/LBC
Alternative references
PP-15004432_C
Ward
Mildmay
Agent
Mr Francesco Zafarana
UPRN
5300067636

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 1 of 1

DocumentPublishedAction
Decision NoticeDecision Notice24 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC and CAC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. CONDITION: All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  3. RYD-NP-9-001 – Site Location Plan, RYD-NP-9-002 – Proposed Roof Plan & Section, Design Access & Heritage Statement prepared by FZ Architect (dated 30/06/2026), Sustainable Design & Construction Statement prepared by FZ Architect (dated 30/06/2026)
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.