Council planning record

Prior Approval Application under Schedule 2, Part 20 Class AB of The Town and Country Planning (General Permitted Development) (England) Order 2015 for an upward extension of existing building by one additional storey to create 3 new flats

140 Seven Sisters Road, London, N7 7NS

FINAL DECISIONReference: P2026/1733/PRALondon Borough of Islington

Last published check: 29 Sept 2026, 14:53. Check the council record for more recent changes.

Application location

140 Seven Sisters Road, London, N7 7NS

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Prior Approval (Roof Extensions)
Received
30 Jun 2026
Validated
10 Jul 2026
Determination deadline
24 Aug 2026
Local authority
London Borough of Islington

Application overview

Prior Approval Application under Schedule 2, Part 20 Class AB of The Town and Country Planning (General Permitted Development) (England) Order 2015 for an upward extension of existing building by one additional storey to create 3 new flats

Proposal details

Reference
P2026/1733/PRA
Alternative references
PP-15028434
Ward
Finsbury Park
Agent
Shloime Godlewsky
UPRN
10096366106

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
Application Form - Without Personal DataApplication Form30 Jun 2026View
Daylight or sunlight assessmentSupporting Documentation30 Jun 2026View
Noise impact assessmentSupporting Documentation30 Jun 2026View
Land contamination assessmentSupporting Documentation30 Jun 2026View
Site and Block PlanDrawings - Existing30 Jun 2026View
Planning statementSupporting Documentation30 Jun 2026View
Location and Block PlanDrawings - Existing30 Jun 2026View
Existing Ground and First Floor PlansDrawings - Existing30 Jun 2026View
Existing Front and Right Side ElevationsDrawings - Existing30 Jun 2026View
Existing Rear and Left ElevationsDrawings - Existing30 Jun 2026View
Existing Section AADrawings - Existing30 Jun 2026View
Proposed Block PlanDrawings - Proposed30 Jun 2026View
Proposed Ground and First Floor PlansDrawings - Proposed30 Jun 2026View
Proposed Second and Roof PlansDrawings - Proposed30 Jun 2026View
Proposed Front ElevationDrawings - Proposed30 Jun 2026View
Proposed Rear ElevationDrawings - Proposed30 Jun 2026View
Proposed Left Side ElevationDrawings - Proposed30 Jun 2026View
Proposed Right Side ElevationDrawings - Proposed30 Jun 2026View
Proposed Section AADrawings - Proposed30 Jun 2026View
Proposed Street ViewDrawings - Proposed30 Jun 2026View
Proposed Cycle and Refuse DetailsDrawings - Proposed30 Jun 2026View
Delegated ReportDelegated Report24 Aug 2026View
Decision NoticeDecision Notice24 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior approval required - refused
Decision Notice
Planning conditions
  1. REASON: The proposal fails to accord with Schedule 2, Part 20, Class AB.2(1)(f) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The applicant has failed to demonstrate that all habitable rooms to the proposed Flats 1 and 3 would be provided with adequate natural light as the submitted daylight assessment has been carried out using a layout of windows which is not consistent with the submitted floor plans, therefore, does not satisfy Class AB.2 (1)(f). This is contrary to the NPPF, the GPDO and the Local Plan Development Framework policies insofar as they are material considerations relevant to the prior approval matters.
  2. Location and Block Plan E00 Proposed Drawings Block Plan P01 Proposed Drawings Floor Plans P02 Proposed Drawings Floor Plans P03 Proposed Drawings Elevations P04 Proposed Drawings Elevations P05 Proposed Drawings Elevations P06 Proposed Drawings Elevations P07 Proposed Drawings Section P08 Proposed Drawings Section P09, Proposed Drawings Details P10 Daylight Sunlight Analysis by Morgan Light Assessors dated June 2026 Acoustic Report by Atelier Crescendo ACC-00075-ARP1-3 dated 13 February 2026 Contaminated Land Risk Assessment PH1-2026-000003 dated 02/02/2026 Planning Statement
  3. REASON: The proposed development fails to accord with Schedule 2, Part 20, Class AB.2(1)(e) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended). The proposed extension by reason of its design, siting, scale, materiality, poorly integrated fenestration and contrasting style to the original building would result in a visually discordant, incongruous and incohesive development. The development would result in unacceptable visual harm and unacceptably detract from the character and appearance of the local townscape. The proposal is therefore contrary to Policy DP3 of the NPPF, the GPDO and the Local Plan Development Framework policies insofar as they are material considerations relevant to the prior approval matters.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.