RefusedCouncil status: FINAL DECISION

The proposed deployment of a Street Hub 3 unit with associated digital advertisement screens.

Pavement outside 2-4 Archway Close, London, N19 3TD

London Borough of IslingtonReference P2026/1722/FULFull Planning Application

Last published check: 29 Sept 2026, 09:00. Check the council record for more recent changes.

Status and dates

Last published check: 29 Sept 2026, 09:00 (UK)

  1. DoneReceived29 Jun 2026
  2. DoneValidated14 Jul 2026
  3. ClosedConsultationEnded 10 Aug 2026
  4. Date set by councilTarget decision date6 Sept 2026
  5. DecidedRefusal of permission3 Sept 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (13)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning Application
Ward
Junction
Documents
15 published

Proposal

The proposed deployment of a Street Hub 3 unit with associated digital advertisement screens.

Reference
P2026/1722/FUL
Alternative references
PP-15025542
Ward
Junction
Agent
Tom Hayes
UPRN
10008979990

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form - Without Personal DataApplication Form - Redacted29 Jun 2026View
  • ASB Management PlanSupporting Documentation29 Jun 2026View
  • Street Hub Product StatementSupporting Documentation29 Jun 2026View
  • Noise Management PlanSupporting Documentation29 Jun 2026View
  • Lighting Management PlanSupporting Documentation29 Jun 2026View
  • Streethub Dimensions - ProposedDrawing Submission29 Jun 2026View
  • Elevation Plan and PhotographsDrawing Submission29 Jun 2026View
  • Community Infrastructure Levy - Completed formSupporting Documentation29 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Refusal of permission
dn final
Planning conditions
  1. REASON: The proposed communications hub and its associated advertisement display by reason of its height, width, illuminance, siting and prominent overall location in Navigator Square would increase visual clutter and would have a harmful impact on the character and appearance of the surrounding area, the streetscene and the setting of the adjacent St John’s Grove Conservation Area. The proposal would therefore be contrary to Policy DP3 of the National Planning Policy Framework, policies D3, D4 and T2 of the London Plan (2021), and policies PLAN1, DH1, DH2, DH6 and ST3 of Islington’s Strategic and Development Management Policies (2023) and the guidance contained within Islington's Urban Design Guide (2017).
  2. REASON: The proposed communications hub and associated advertisement display by reason of its siting, scale, height and proximity to a cycleway and pedestrian crossing would obstruct pedestrian permeability and desire lines and obscure the visibility of the crossing point for both pedestrians and cyclists. The hub would therefore be a hazard and detrimental to public safety and be contrary to Policy TR4 of the National Planning Policy Framework, policies T2 and T4 of the London Plan (2021) and policies DH6, T1, T2, T4 and ST3 of Islington’s Strategic and Development Management Policies (2023).
  3. ISL-02B - Planning, Design and Access Statement (not dated) ISL-23 FP - Covering Letter dated 25.06.2026 SDCS (not dated) 26001607_PLN_LOC_1.1 - Location Plan dated 19.06.2026 26001607_PLN_SI_2.1_A - Proposed Site Plan dated 19.06.206 26001607_PLN_EL_3.1_A - Elevations dated 19.06.2026 PROPOSED BT STREETHUB 3 UNIT dated 21.03.2026 Professional Lighting Guide 05/23 BT Street Hub Noise Management Plan (February 2025) V2.1 BT Street Hubs Beyond connection (November 2025) V2.2 BT Street Hub Anti-Social Behaviour Management Plan Version 3 (not dated)
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.