Council planning record

Erection of a mansard roof extension, formation of front roof terrace and rear roof balcony, and installation of external air conditioning unit in new front roof terrace

19 Cruden Street, London, N1 8NH

FINAL DECISIONReference: P2026/1686/FULLondon Borough of Islington

Last published check: 29 Sept 2026, 01:43. Check the council record for more recent changes.

Application location

19 Cruden Street, London, N1 8NH

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
26 Jun 2026
Validated
23 Jul 2026
Determination deadline
16 Sept 2026
Local authority
London Borough of Islington

Application overview

Erection of a mansard roof extension, formation of front roof terrace and rear roof balcony, and installation of external air conditioning unit in new front roof terrace

Proposal details

Reference
P2026/1686/FUL
Alternative references
PP-14955300
Ward
St Mary's & St James'
Agent
Fergus Davis
UPRN
5300026175

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 34 of 34

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted26 Jun 2026View
Location PlanLocation Plan26 Jun 2026View
Existing Block PlanDrawings - Existing - Site Layout26 Jun 2026View
Existing Site PlanDrawings - Existing - Site Layout26 Jun 2026View
Existing Lower Ground Floor PlanDrawings - Existing - Plans26 Jun 2026View
Existing Upper Ground Floor PlanDrawings - Existing - Plans26 Jun 2026View
Existing First Floor PlanDrawings - Existing - Plans26 Jun 2026View
Existing Roof PlanDrawings - Existing - Plans26 Jun 2026View
Existing Front ElevationDrawings - Existing - Elevations26 Jun 2026View
Existing Rear ElevationDrawings - Existing - Elevations26 Jun 2026View
Existing Side (North) ElevationDrawings - Existing - Elevations26 Jun 2026View
Existing Side (South) ElevationDrawings - Existing - Elevations26 Jun 2026View
Existing Section (including outrigger)Drawings - Existing Sections26 Jun 2026View
Existing SectionDrawings - Existing Sections26 Jun 2026View
Proposed Site PlanDrawings - Proposed - Site Layout26 Jun 2026View
Proposed Lower Ground Floor PlanDrawings - Proposed - Plans26 Jun 2026View
Proposed Upper Ground Floor PlanDrawings - Proposed - Plans26 Jun 2026View
Proposed First Floor PlanDrawings - Proposed - Plans26 Jun 2026View
Proposed Loft PlanDrawings - Proposed - Plans26 Jun 2026View
Proposed Roof PlanDrawings - Proposed - Plans26 Jun 2026View
Proposed Front ElevationDrawings - Proposed - Elevations26 Jun 2026View
Proposed Rear ElevationDrawings - Proposed - Elevations26 Jun 2026View
Proposed Side (North) ElevationDrawings - Proposed - Elevations26 Jun 2026View
Proposed Side (South) ElevationDrawings - Proposed - Elevations26 Jun 2026View
Proposed Section (including outrigger)Drawings - Proposed - Sections26 Jun 2026View
Proposed SectionDrawings - Proposed - Sections26 Jun 2026View
Proposed Section (including Cruden Street)Drawings - Proposed - Sections26 Jun 2026View
Design and Access StatementDefault26 Jun 2026View
Sustainable Design and Construction StatementApplication Supporting Documents3 Jul 2026View
Statement on Energy HierarchyApplication Supporting Documents23 Jul 2026View
Air Conditioning Unit Manufacturer SpecificationApplication Supporting Documents23 Jul 2026View
Air Conditioning Unit MCS CertificateApplication Supporting Documents23 Jul 2026View
DELEGATED REPORTDelegated Report10 Sept 2026View
DN FINALDecision Notice10 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN FINAL
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan, 127 10 000(P1), 127 20 000(P1), 127 20 001(P1), 127 20 002(P1), 127 20 003(P1), 127 20 004(P1), 127 21 000(P1), 127 21 001(P1), 127 21 002(P1), 127 21 003(P1), 127 22 000(P1), 127 22 001(P1), 127 22 002(P1), 127 22 003(P1), Design and Access Statement, Sustainable Design and Construction Statement, Statement on Energy Hierarchy, Air Conditioning Unit Technical Sheet Data and MCS Certification (Midea Breezeless E) REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. FIXED PLANT (COMPLIANCE): The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: To ensure that the operation of fixed plant does not impact on residential amenity
  5. FIXED PLANT: You are advised that Islington have a duty to investigate any complaints in terms of statutory nuisance. It is advised that the plant is checked upon installation and regularly checked, maintained and serviced to ensure noise levels do not rise or acoustic character such as tonality, intermittency, impulsivity or other acoustic character develop.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.