ApprovedCouncil status: FINAL DECISION

Replacement of existing electrical infrastructure with associated areas of external distribution cabling and new emergency lighting, fire stopping and testing

Widford House, 7 Colebrooke Row, London, N1 8DD

London Borough of IslingtonReference P2026/1668/FULFull Planning (Council's Own)

Last published check: 29 Sept 2026, 17:59. Check the council record for more recent changes.

Status and dates

Last published check: 29 Sept 2026, 17:59 (UK)

  1. DoneReceived24 Jun 2026
  2. DoneValidated7 Jul 2026
  3. ClosedConsultationEnded 1 Aug 2026
  4. Date set by councilTarget decision date18 Aug 2026
  5. DecidedApprove with conditions18 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (13)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Full Planning (Council's Own)
Ward
St Peter's & Canalside
Documents
13 published

Proposal

Replacement of existing electrical infrastructure with associated areas of external distribution cabling and new emergency lighting, fire stopping and testing

Reference
P2026/1668/FUL
Alternative references
PP-15037006
Ward
St Peter's & Canalside
Agent
Mr Juan Carlos Sanchez
UPRN
5300022077

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form (Redacted)Default24 Jun 2026View
  • Location PlanDefault24 Jun 2026View
  • CIL FormDefault24 Jun 2026View
  • Design & Access StatementDefault24 Jun 2026View
  • Location and Site PlanDefault24 Jun 2026View
  • Existing Site Plan (Overview)Default24 Jun 2026View
  • Electrical SurveyDefault24 Jun 2026View
  • New Intake Room DetailsDefault24 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve with conditions
DN
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: OS Map (unnumbered), CIP_16-IA-00-ZZ-DR-A-0001 (Rev. P00) – Location & Site Plans, CIP_16-IA-00-ZZ-DR-A-0020 (Rev. P00) – Elevations, EP12-WH-012 – New Intake Room Detail, EP12-WH-014 – Typical Containment & Cable Penetration Detail, Design Access & Heritage Statement (Issue A) prepared by Islington Architects (dated June 2026) and Sustainable Design & Construction Template (undated), Electrical Survey Details (undated). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design Access and Heritage Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.