3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: EX 001 Revision P1 BLOCK PLAN; EX 002 Revision P1 SITE/LOCATION PLAN; GA 011 Revision P1 EXISTING AND PROPOSED GROUND FLOOR PLANS; GA 012 Revision P1 EXISTING AND PROPOSED FIRST FLOOR PLANS; GA 013 Revision P1 EXISTING AND PROPOSED ROOF PLANS; GA 210 Revision P1 EXISTING AND PROPOSED REAR ELEVATIONS; GA 211 Revision P1 EXISTING AND PROPOSED SIDE ELEVATION – NORTH WEST; GA 212 Revision P1 EXISTING AND PROPOSED SIDE ELEVATION – SOUTH EAST; GA 310 Revision P1 EXISTING AND PROPOSED SECTION AA; GA 311 Revision P1 EXISTING AND PROPOSED SECTION BB; Sustainable Design and Construction Statement. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): he development shall be constructed in accordance with the schedule of materials noted on the approved plans, application form and sustainable design and construction statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.