Enlargement of rear lightwell with installation of new door and stair. Replacement of cement render/pointing, vents/rainwater goods and front lightwell door.
5 Cumberland Gardens, London, WC1X 9AF
FINAL DECISIONReference: P2026/1628/FULLondon Borough of Islington
Last published check: 29 Sept 2026, 22:02. Check the council record for more recent changes.
Application location
5 Cumberland Gardens, London, WC1X 9AF
This record has no verified map location.
Application summary
Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
22 Jun 2026
Validated
1 Jul 2026
Determination deadline
16 Aug 2026
Local authority
London Borough of Islington
Application overview
Enlargement of rear lightwell with installation of new door and stair. Replacement of cement render/pointing, vents/rainwater goods and front lightwell door.
Proposal details
Reference
P2026/1628/FUL
Alternative references
PP-15017040
Ward
Clerkenwell
Agent
Mr Theo Jones
UPRN
5300026384
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan; GA100; GA101 P2; GA102; GA103; GA200; GA201; GA300; GA301; GA309; GA305; DT100; DT301; DT302; DT401; DT402; Arboricultural Impact Assessment and Preliminary Method Statement Revision A dated 10 April 2026 (document ref. MDJAC-BS25190-AIAPMS-01A); Design, Access and Heritage Statement – P1 dated June 2026; Sustainable Design and Construction Statement; Method statement - Removal of inappropriate cement pointing and render dated June 2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Design, Access and Heritage Statement - P1 dated June 2026. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
REPLACEMENT TREES (DETAILS): Notwithstanding approved drawing GA101 - Ground Floor Plan - P2, details of five replacement trees to be planted in the rear garden (including species, size and locations) shall be submitted to and approved in writing by the Local Planning Authority prior to first occupation of the development. The replacement trees shall be planted in the first planting season following the completion of the development. Any trees to be planted as part of the approved landscaping scheme which die or become severely damaged or diseased within five years of completion of the development shall be replaced with the same species or an approved alternative to the satisfaction of the Local Planning Authority within the next planting season. The development shall be carried out strictly in accordance with the details approved and the trees shall be retained and maintained as such thereafter. REASON: In the interests of biodiversity and in order to provide adequate replacement tree canopy in accordance with Policy G4 of Islington’s Strategic and Development Management Policies (2023).
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.