Replace the existing non-original lower ground floor rear garden door with new glazed French doors. Renovate the existing basement front lightwell glazed door and window under the entrance steps - replace the existing modern single glazing with slimline double glazing. Replacement of second floor windows. Reinstatement of roller awnings to first floor front windows. Dress the front entrance steps asphalt with square edged Yorks stone steps and associated rear garden works. Replacement of rear roof light.
Replace the existing non-original lower ground floor rear garden door with new glazed French doors. Renovate the existing basement front lightwell glazed door and window under the entrance steps - replace the existing modern single glazing with slimline double glazing. Replacement of second floor windows. Reinstatement of roller awnings to first floor front windows. Dress the front entrance steps asphalt with square edged Yorks stone steps and associated rear garden works. Replacement of rear roof light.
Reference
P2026/1588/FUL
Alternative references
PP-14997229
Ward
Barnsbury
Agent
Dominic McKenzie
UPRN
5300006951
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 132_P_19 Rev. A Proposed Lower Ground Floor; 132_P_20 Rev. A Proposed Ground Floor; 132_P_21 Rev. A Proposed First Floor; 132_P_22 Rev. A Proposed Second Floor; 132_P_23 Rev. A Proposed Attic Floor; 132_P_35 Proposed Front Elevation; 132_P_36 Rev. A Proposed Rear Elevation; 132_P_80 Proposed Kitchen; Location Plan dated 17-Jun-2026; 1097 Rev. 00 58 Barnsbury Street Fire Statement prepared by Scott Hall; Sustainable Design and Construction Statement 25th June 2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.