Council planning record

Replacement windows, doors and insulated spandrel panels. Encapsulation of the existing exposed wood wool boarded soffits with a new external soffit board. Replacement of the existing black painted timber tongue and groove cladding with a new black rainscreen cladding system. Repairs to the existing facing brickwork where required and other associated works.

Flats 1-4 Bakersfield, London, N7 0LT

FINAL DECISIONReference: P2026/1571/FULLondon Borough of Islington

Last published check: 30 Sept 2026, 12:38. Check the council record for more recent changes.

Application location

Flats 1-4 Bakersfield, London, N7 0LT

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
12 Jun 2026
Validated
18 Jun 2026
Determination deadline
6 Aug 2026
Local authority
London Borough of Islington

Application overview

Replacement windows, doors and insulated spandrel panels. Encapsulation of the existing exposed wood wool boarded soffits with a new external soffit board. Replacement of the existing black painted timber tongue and groove cladding with a new black rainscreen cladding system. Repairs to the existing facing brickwork where required and other associated works.

Proposal details

Reference
P2026/1571/FUL
Alternative references
PP-14896108
Ward
Tufnell Park
UPRN
5300005224

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted16 Jun 2026View
Cover LetterSupporting Documentation16 Jun 2026View
Community Infrastructure Levy - Completed formSupporting Documentation16 Jun 2026View
Design and access statementDesign and Access Statement16 Jun 2026View
Planning StatementSupporting Documentation16 Jun 2026View
Sustainable Design and Construction StatementSupporting Documentation16 Jun 2026View
SUPERSEDED - Material SpecsARCHIVE16 Jun 2026View
Fire StatementSupporting Documentation16 Jun 2026View
Accomodation Area Schedule - CombinedSupporting Documentation16 Jun 2026View
Site/Block Plan - ProposedBlock Plan16 Jun 2026View
Existing Plans - CombinedDrawings - Existing16 Jun 2026View
Proposed Plans - CombinedDrawings - Proposed16 Jun 2026View
Site/Block Plan - ExistingBlock Plan16 Jun 2026View
Window Proposal - CombinedDrawings - Proposed16 Jun 2026View
Indicative Window Opening Detail DrawingDrawings - Proposed12 Aug 2026View
Material SpecsSupporting Documentation12 Aug 2026View
Ownership Certificate B - REDACTEDOwnership Certificate12 Aug 2026View
DN FINALDecision Notice Final8 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  13. Dispatch date

    Published milestoneCouncil source
  14. Decision date

    Published milestoneCouncil source

Decision & conditions

Approve with conditions
DN FINAL
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: BKF-PRP-ZZ-XX-DR-A-R20210 P01, BKF-PRP-ZZ-XX-DR-A-R23210 P01, BKF-PRP-ZZ-XX-DR-A-R20310 P01, BKF-PRP-ZZ-XX-DR-A-R81000 P01, BKF-PRP-ZZ-XX-DR-A-R43200 P02, BKF-PRP-ZZ-XX-DR-A-R53200 P02, BKF-PRP-B1-XX-ELV-A-R46200 P01, BKF-PRP-B1-XX-SEC-A-R46350 P01, BKF-PRP-XX-XX-DR-A- R64200 P01, BKF-PRP-XX-XX-DR-A-R64201 P01, BKF-PRP-XX-XX-DR-A-R64202 P01, BKF-PRP-XX-XX-DR-A-R64203 P01, BKF-PRP-XX-XX-DR-A-R64204 P01, BKF-PRP-XX-XX-DR-A-R64205 P01, Design & Access Statement prepared by PRP dated 10.06.2026, External Product Selection Matrix ref. BKF-PRP-ZZ-XX-RP-A-R26004 revision P04 dated 06.08.2026, Planning Statement prepared by PRP dated 10.06.2026, Sustainable Design & Construction Statement prepared by PRP dated 22.05.26, Fire Statement prepared by PRP dated 22.05.2026. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans, within the Design and Access Statement dated 10.06.2026 and within the External Product Selection Matrix ref. BKF-PRP-ZZ-XX-RP-A-R26004 revision P04 dated 06.08.2026. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. FIRE SAFETY STRATEGY (COMPLIANCE): The development must be implemented in accordance with the provisions of the Fire Statement Form prepared by PRP dated 22.05.2026. REASON: To ensure that the development incorporates the necessary fire safety measures in accordance with the Mayor's London Plan Policy D12.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.