Council planning record

Erection of rear dormer roof and installation of two rooflights to front roof slope. Replacement of front concrete roof tiles with slate tiles.

14 Stonenest Street, London, N4 3BA

FINAL DECISIONReference: P2026/1542/COLLondon Borough of Islington

Last published check: 30 Sept 2026, 11:52. Check the council record for more recent changes.

Application location

14 Stonenest Street, London, N4 3BA

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Certificate of Lawfulness (Proposed)
Received
12 Jun 2026
Validated
18 Jun 2026
Determination deadline
6 Aug 2026
Local authority
London Borough of Islington

Application overview

Erection of rear dormer roof and installation of two rooflights to front roof slope. Replacement of front concrete roof tiles with slate tiles.

Proposal details

Reference
P2026/1542/COL
Alternative references
PP-14982682
Ward
Tollington
Agent
Mr Gareth Gazey
UPRN
5300088113

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
Application Form - Without Personal DataApplication Form12 Jun 2026View
Location PlanLocation Plan12 Jun 2026View
Site/Block Plan - ExistingDrawings - Existing12 Jun 2026View
Existing PlansDrawings - Existing12 Jun 2026View
Block plan of the site SUPERSEDEDApplication Drawings - Superseded12 Jun 2026View
Proposed Front ElevationDrawings - Proposed12 Jun 2026View
Planning StatementSupporting Documentation12 Jun 2026View
Dormer cheek elevation SUPERSEDEDApplication Drawings - Superseded29 Jul 2026View
Proposed Section AMENDEDDrawings - Proposed3 Aug 2026View
Block Plan AMENDEDDrawings - Proposed3 Aug 2026View
Proposed Loft Floor Plan AMENDEDDrawings - Proposed3 Aug 2026View
Proposed Roof Plan AMENDEDDrawings - Proposed3 Aug 2026View
delegated reportDelegated Report4 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Dispatch date

    Published milestoneCouncil source
  6. Decision date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with no conditions
Planning conditions
  1. The information submitted with the application is considered sufficient to satisfy the Local Planning Authority that the works as described would be lawful under Schedule 2, Part 1, Class B and Class C of the Town and Country Planning (General Permitted Development) Order 2015, if instituted or begun at the time of the application. As such, the certificate is recommended to be approved.
  2. Planning Statement (Gazey Architects); (00)AE001 Revision B; (00)AP003 Revision B; (00)AP004 Revision C; (00)AP005 Revision C; (00)AS001 Revision E; (00)AP050 Revision C; (00)AS001 Revision D; (00)AP100 Revision B.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.