ApprovedCouncil status: FINAL DECISION

Listed Building Consent for repairing and repainting sash windows, replacing the existing cement render to the front facade with lime render and repainting the front door and shopfront with linseed oil paint.

32 Britton Street, London, EC1M 5UH

London Borough of IslingtonReference P2026/1521/LBCListed Building

Last published check: 30 Sept 2026, 14:57. Check the council record for more recent changes.

Status and dates

Last published check: 30 Sept 2026, 14:57 (UK)

  1. DoneReceived10 Jun 2026
  2. DoneValidated16 Jun 2026
  3. ClosedConsultationEnded 11 Jul 2026
  4. Date set by councilTarget decision date4 Aug 2026
  5. DecidedApprove with conditions7 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (14)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Decision expiry date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building
Ward
Clerkenwell
Documents
8 published

Proposal

Listed Building Consent for repairing and repainting sash windows, replacing the existing cement render to the front facade with lime render and repainting the front door and shopfront with linseed oil paint.

Reference
P2026/1521/LBC
Alternative references
PP-13309205
Ward
Clerkenwell
UPRN
5300012017

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • File Size: 238331, Reference: Application Form - Without Personal DataDefault10 Jun 2026View
  • File Size: 505847, Reference: The location planDefault10 Jun 2026View
  • File Size: 176360, Reference: Floor planDefault10 Jun 2026View
  • File Size: 1345972, Reference: Design and access statementDefault10 Jun 2026View
  • File Size: 2226332, Reference: Heritage statementDefault10 Jun 2026View
  • Details of window pane replacementDefault18 Jun 2026View
  • Decision NoticeDecision Notice Final7 Aug 2026View
  • Delegated ReportDelegated Report7 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD FOR LBC and CAC: The works hereby permitted shall be begun not later than three years from the date of this consent. REASON: To comply with the provisions of Section 18(1)(a) of the Planning (Listed Buildings and Conservation Areas) Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Application Form; Design and Access Statement; Location Plan; Existing Floor Plans; Details of windowpane replacement; Heritage Statement. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. ALL EXTERNAL AND INTERNAL WORKS TO MATCH (COMPLIANCE): All new external and internal works and finishes and works of making good to the retained fabric shall match the existing adjacent work with regard to the methods used and to material, colour, texture and profile. All such works and finishes shall be maintained as such thereafter. REASON: In order to safeguard the special architectural or historic interest of the heritage asset.
  4. This consent relates solely to listed building matters. Should it become necessary to make alterations to the consented scheme in order to comply with other legislation, such as Building Regulations, a further consent may be required. Such a consent should be sought and obtained prior to the relevant works being undertaken.
  5. The applicant, their successors, and developer must ensure compliance with the conditions listed above. Some conditions may require the submission and approval of further information to the Local Planning Authority prior to the commencement of development, works, use or occupation.
  6. If you are an agent, please ensure that a full copy of this decision is forwarded to your client. In particular, please advise your client of any conditions attached to the decision and the need for them to comply with those conditions. Failure to comply with a condition is a breach of planning control, which could lead to enforcement action being taken against your client.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.