Council planning record

Notification of Prior Approval for the change of use of the lower ground, ground, first, second, third and fourth floors of existing commercial building (Class E) to residential accommodation to provide 20 self-contained residential units (Class C3) under 'Class MA' of Schedule 2 of the Town and Country Planning (General Permitted Development) Order (GPDO) 2015 (as amended)

391 - 395, City Road, London, EC1V 1NG

FINAL DECISIONReference: P2026/1470/PRALondon Borough of Islington

Last published check: 30 Sept 2026, 22:34. Check the council record for more recent changes.

Application location

391 - 395, City Road, London, EC1V 1NG

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Prior Approval (Class E To Residential)
Received
8 Jun 2026
Validated
10 Jun 2026
Determination deadline
3 Aug 2026
Local authority
London Borough of Islington

Application overview

Notification of Prior Approval for the change of use of the lower ground, ground, first, second, third and fourth floors of existing commercial building (Class E) to residential accommodation to provide 20 self-contained residential units (Class C3) under 'Class MA' of Schedule 2 of the Town and Country Planning (General Permitted Development) Order (GPDO) 2015 (as amended)

Proposal details

Reference
P2026/1470/PRA
Alternative references
PP-14983678
Ward
St Peter's & Canalside
Agent
Craig Stewart
UPRN
5300020424

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 35 of 35

DocumentPublishedAction
Application Form - Without Personal DataApplication Form - Redacted8 Jun 2026View
Flood risk assessmentApplication Supporting Documents8 Jun 2026View
Daylight sunlight assessmentApplication Supporting Documents8 Jun 2026View
Heritage statementApplication Supporting Documents8 Jun 2026View
Noise impact assessmentApplication Supporting Documents8 Jun 2026View
Covering letterApplication Supporting Documents8 Jun 2026View
Accomodation scheduleApplication Supporting Documents8 Jun 2026View
Elevation (West)Drawings - Proposed8 Jun 2026View
Elevation (North)Drawings - Proposed8 Jun 2026View
Elevation (East)Drawings - Proposed8 Jun 2026View
Elevation (South)Drawings - Proposed8 Jun 2026View
Section BDrawings - Proposed8 Jun 2026View
Section ADrawings - Proposed8 Jun 2026View
Section BDrawings - Existing8 Jun 2026View
Section ADrawings - Existing8 Jun 2026View
The location planLocation Plan8 Jun 2026View
Block plan of the siteDrawings - Existing8 Jun 2026View
Roof Plan - ProposedDrawings - Proposed8 Jun 2026View
Roof Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Floor planDrawings - Proposed8 Jun 2026View
Floor Plan - ExistingDrawings - Existing8 Jun 2026View
Transport assessmentApplication Supporting Documents8 Jun 2026View
Land contamination assessmentApplication Supporting Documents8 Jun 2026View
Decision Notice P2026/1470/PRADecision Notice30 Jul 2026View
Delegated Report P2026/1470/PRADelegated Report30 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Prior approval required - approved with Conditions
Decision Notice P2026/1470/PRA
Planning conditions
  1. CAR FREE DEVELOPMENT: All future occupiers of the residential units hereby approved shall not be eligible to obtain an on street residents parking permit except: i) In the case of disabled persons; ii) In the case of units designated in this planning permission as 'non car free'; or iii) In the case of the resident who is an existing holder of a residents parking permit issued by the London Borough of Islington and has held the permit for a period of at least one year. REASON: To ensure that the development remains car free in accordance with policy T6 of the London Plan 2021, policy T3 of the Islington Local Plan: Strategic and Development Management Policies 2023 and Schedule 2, Part 3, Class MA, sub–Paragraph MA.2(2)(a) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
  2. SOUND INSULATION AND VENTILATION: A scheme for sound insulation and noise control measures shall be submitted to and approved in writing by the Local Planning Authority prior to any occupation of the residential units. The sound insulation and noise control measures shall achieve the following internal noise targets: Bedrooms (23.00-07.00 hrs) 30 dB LAeq,8 hour and 45 dB Lmax (fast) Living Rooms (07.00-23.00 hrs) 35 dB LAeq, 16 hour Dining rooms (07.00 –23.00 hrs) 40 dB LAeq, 16 hour The details of the ventilation and any self-generated noise from the ventilation shall be included within the calculations with reference to the AVO Guidance. The sound insulation and noise control measures shall be carried out strictly in accordance with the details so approved, shall be implemented prior to the first occupation of the development hereby approved, shall be maintained as such thereafter and no change therefrom shall take place without the prior written consent of the Local Planning Authority. REASON: To ensure that an appropriate standard of residential accommodation is provided in accordance with Schedule 2, Part 3, Class MA, sub–Paragraph MA.2(2)(d) of The Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
  3. The applicant is reminded of the following conditions as set out in Schedule 2, Part 3, Class MA of The Town and Country Planning (General Permitted Development)(England) Order 2015 (as amended): - In accordance with Schedule 2, Part 3, Class MA. Sub-paragraph (5) development must be completed within a period of 3 years starting with the date prior approval date; - In accordance with Schedule 2, Part 3, Class MA. Sub-paragraph (6) any building permitted to be used as a dwellinghouse by virtue of Class MA is to remain in use as a dwellinghouse within the meaning of Class C3 of Schedule 1 to the Use Classes Order and for no other purpose, except to the extent that the other purpose is ancillary to the use as a dwellinghouse; - In accordance with Schedule 2, Part 3, Paragraph W. Sub-paragraph (12) the development must be carried out — (a) where prior approval is required, in accordance with the details approved by the local planning authority; (b) where prior approval is not required, or where sub-paragraph (11)(c) applies, in accordance with the details provided in the application referred to in sub-paragraph (1), unless the local planning authority and the developer agree otherwise in writing.
  4. For the avoidance of doubt, any required changes to the external elevations of the building, including fenestration, will require full planning permission.
  5. The applicant is advised of the need to fully comply with Building Regulations 2010 in relation to fire safety compliance and noise insulation requirements.
  6. Cover Letter (Iceni Projects, 04 June 2026); Daylight and Sunlight Report DL REF: 277 (Development & Light, May 2026); Flood Risk Assessment Note (Iceni Projects, May 2026); Heritage Impact Assessment (Iceni Projects, May 2026); Noise Assessment Report (auricl acoustic consulting, 3 June 2026); Tier 1 Contamination Risk Assessment: 65217812 -SWE-XX-XX-T-GE-0001 Revision: C02 (Sweco UK Limited, 28 May 2026); Transport Note (Iceni Projects, May 2026); 184-ANO-ZZ-XX-DR-A-02010 Revision C01 – Existing Site; 184-ANO-ZZ-XX-DR-A-02011 Revision C01 – Site Location; 184-ANO-ZZ-B1-DR-A-02129 Revision C01 – Existing Plan – Level B1; 184-ANO-ZZ-00-DR-A-02130 Revision C01 – Existing Plan – Level 00; 184-ANO-ZZ-01-DR-A-02131 Revision C01 – Existing Plan – Level 01; 184-ANO-ZZ-02-DR-A-02132 Revision C01 – Existing Plan – Level 02; 184-ANO-ZZ-03-DR-A-02133 Revision C01 – Existing Plan – Level 03; 184-ANO-ZZ-04-DR-A-02134 Revision C01 – Existing Plan – Level 04; 184-ANO-ZZ-RF-DR-A-02135 Revision C01 – Existing Plan – Level RF; 184-ANO-ZZ-ZZ-DR-A-02310 Revision C01 – Existing Section A; 184-ANO-ZZ-ZZ-DR-A-02311 Revision C01 – Existing Section B; 184-ANO-ZZ-B1-DR-A-05109 Revision C01 – Permitted Development – General Arrangement – B1; 184-ANO-ZZ-00-DR-A-05110 Revision C01 – Permitted Development – General Arrangement – L00; 184-ANO-ZZ-01-DR-A-05111 Revision C01 – Permitted Development – General Arrangement – L01; 184-ANO-ZZ-02-DR-A-05112 Revision C01 – Permitted Development – General Arrangement – L02; 184-ANO-ZZ-03-DR-A-05113 Revision C01 – Permitted Development – General Arrangement – L03; 184-ANO-ZZ-04-DR-A-05114 Revision C01 – Permitted Development – General Arrangement – L04; 184-ANO-ZZ-RF-DR-A-05115 Revision C01 – Permitted Development – General Arrangement – L05 (Roof); 184-ANO-ZZ-ZZ-DR-A-05310 Revision C01 – Proposed Section – Section A; 184-ANO-ZZ-ZZ-DR-A-05311 Revision C01 – Proposed Section – Section B; 184-ANO-ZZ-ZZ-DR-A-05410 Revision C01 – Permitted Development – South Elevation; 184-ANO-ZZ-ZZ-DR-A-05411 Revision C01 – Permitted Development – East Elevation; 184-ANO-ZZ-ZZ-DR-A-05412 Revision C01 – Permitted Development – North Elevation; 184-ANO-ZZ-ZZ-DR-A-05413 Revision C01 – Permitted Development – West Elevation;
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.