Council planning record

Replacement of existing front and side elevation single glazed timber framed windows at first and second floor levels with double glazed timber framed windows and all associated façade remediation works.

112-114 King's Cross Road, London, WC1X 9DS

FINAL DECISIONReference: P2026/1452/FULLondon Borough of Islington

Last published check: 30 Sept 2026, 01:12. Check the council record for more recent changes.

Application location

112-114 King's Cross Road, London, WC1X 9DS

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
4 Jun 2026
Validated
26 Jun 2026
Determination deadline
13 Aug 2026
Local authority
London Borough of Islington

Application overview

Replacement of existing front and side elevation single glazed timber framed windows at first and second floor levels with double glazed timber framed windows and all associated façade remediation works.

Proposal details

Reference
P2026/1452/FUL
Alternative references
PP-14987373
Ward
Clerkenwell
Agent
SHAA
UPRN
10012788500

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
Application Form (Redacted)Application Form4 Jun 2026View
OS MapLocation Plan4 Jun 2026View
Proposed Replacement Window Details SUPERSEDEDApplication Drawings - Superseded4 Jun 2026View
Side ElevationDrawing Submission4 Jun 2026View
Front ElevationDrawing Submission4 Jun 2026View
CIL FormSupporting Documentation4 Jun 2026View
Sustainable Design & Construction StatementSupporting Documentation26 Jun 2026View
Proposed Replacement Window DetailsDrawing Submission31 Jul 2026View
delegated reportDelegated Report3 Aug 2026View
DN FINALDecision Notice Final3 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN FINAL
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: OS Map (unnumbered), 2026078/1 – Existing & Proposed Front Elevation, 2026078/2 – Existing & Proposed Side Elevation, 21149A (Rev. 01) - Proposed Replacement Windows Details, Sustainable Design & Construction Statement Template (undated). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Application Form. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. WINDOW FRAME COLOUR (COMPLIANCE):The replacement windows hereby approved shall be painted in a white colour to match the existing and maintained as such thereafter. REASON: To ensure that the appearance of the windows are acceptable in relation to the existing building and the character of the surrounding area.
  5. HIGHWAYS: All vehicles associated with the development during the works or subsequently must comply with existing on-street restrictions. If any Red Route dispensations or highways licensing are sought for the works, these must be agreed with the relevant TfL team in writing before the work commences. The footway and carriageway must not be blocked during any works associated with the development.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.