ApprovedCouncil status: FINAL DECISION

Erection of dormer to main rear roof and to existing rear outrigger with installation of 3 no. rooflights to front roof slope. Relocation of bathroom window and removal of rear outrigger chimney stack.

25 Bracey Street, London, N4 3BJ

London Borough of IslingtonReference P2026/1400/COLCertificate of Lawfulness (Proposed)

Last published check: 30 Sept 2026, 19:51. Check the council record for more recent changes.

Status and dates

Last published check: 30 Sept 2026, 19:51 (UK)

  1. DoneReceived1 Jun 2026
  2. DoneValidated11 Jun 2026
  3. Not publishedConsultationNo date on council record
  4. Date set by councilTarget decision date26 Jul 2026
  5. DecidedApprove with no conditions27 Aug 2026

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (7)
  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision date

    Published milestoneCouncil source
Application type
Certificate of Lawfulness (Proposed)
Ward
Tollington
Documents
22 published

Proposal

Erection of dormer to main rear roof and to existing rear outrigger with installation of 3 no. rooflights to front roof slope. Relocation of bathroom window and removal of rear outrigger chimney stack.

Reference
P2026/1400/COL
Alternative references
PP-14975431
Ward
Tollington
UPRN
5300011156

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Application Form - Without Personal DataApplication Form - Redacted1 Jun 2026View
  • Location PlanLocation Plan1 Jun 2026View
  • Existing Section BBDrawings - Existing1 Jun 2026View
  • Existing Section AADrawings - Existing1 Jun 2026View
  • Proposed Ground floor planDrawings - Proposed1 Jun 2026View
  • Proposed First floor planDrawings - Proposed1 Jun 2026View
  • Proposed Attic floor planDrawings - Proposed1 Jun 2026View
  • Proposed Roof PlanDrawings - Proposed1 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approve with no conditions
dn final
Planning conditions
  1. 01 (Location Plan); 10, 11, 12, 13, 14, 15 Rev A; 16; 17.
  2. The information submitted with the application is considered sufficient to satisfy the local planning authority that the works as described would be lawful under Schedule 2, Part 1, Classes A, B, C and G of the Town and Country Planning (General Permitted Development) Order 2015, if instituted or begun at the time of the application. Therefore, it is recommended that the certificate is approved.
  3. INFORMATIVE: You are reminded that in order to be permitted development the relocated first floor flank window on the side of the outrigger (as shown on drawing no. 16) must be obscured-glazed and non-opening unless the opening parts are located 1.7m above the finished floor level of the room in which it is installed.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.