Council planning record

The formation of a new internal opening between the existing front and rear rooms at basement level. Internal alterations for replacement kitchen and bathroom fittings, replacement floor and wall finishes; upgrade to wiring and installation of new light fittings; replacement of radiators; and repairs to joinery.

3, Canonbury Place, London, N1 2NQ

SECOND STAGE REVIEWReference: P2026/1258/LBCLondon Borough of Islington

Last published check: 2 Oct 2026, 08:30. Check the council record for more recent changes.

Application location

3, Canonbury Place, London, N1 2NQ

This record has no verified map location.

Application summary

Status
SECOND STAGE REVIEW
Application type
Listed Building
Received
13 May 2026
Validated
19 May 2026
Determination deadline
31 Jul 2026
Local authority
London Borough of Islington

Application overview

The formation of a new internal opening between the existing front and rear rooms at basement level. Internal alterations for replacement kitchen and bathroom fittings, replacement floor and wall finishes; upgrade to wiring and installation of new light fittings; replacement of radiators; and repairs to joinery.

Proposal details

Reference
P2026/1258/LBC
Alternative references
PP-14930233
Ward
Canonbury
Agent
Mr Michael Daly, Goodman Mann Broomhall
UPRN
5300015851

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 10 of 10

DocumentPublishedAction
File Size: 232897, Reference: Application Form - Without Personal DataDefault13 May 2026View
File Size: 132544, Reference: Design and access statementDefault13 May 2026View
File Size: 1865397, Reference: Heritage statementDefault13 May 2026View
File Size: 250080, Reference: Additional plansDefault13 May 2026View
Existing drawingsDrawings - Existing19 May 2026View
Proposed plansDrawings - Proposed19 May 2026View
Location planLocation Plan19 May 2026View
Revised proposed basement planDrawings - Proposed27 Jul 2026View
Structural engineer's reportStructural Plans27 Jul 2026View
Detailed structural engineer's sectionsDrawings - Proposed - Sections27 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

SECOND STAGE REVIEW
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.