Retrospective application for installation of 2no. gas pipes to the front elevation and part of the side returns and the installation of 2no. meter boxes to the front lightwell
Retrospective application for installation of 2no. gas pipes to the front elevation and part of the side returns and the installation of 2no. meter boxes to the front lightwell
Reference
P2026/1209/FUL
Alternative references
PP-13796657
Ward
Barnsbury
Agent
Environment and Planning Service
UPRN
5300051830
Sign in to view all collected council fields and recorded changes.
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 25000336_PLN_EL_1.1_A – Pre-Existing & North Elevation, 25000336_PLN_EL_1.2 – Pre-Existing & Existing, 25000336_PLN_LOC_2.1 – Location Plan, 25000336_PLN_SI_3.1 – Site Plan, 25000336_PLN_SI_4.1 – Block Plan, Design Access & Heritage Statement prepared by Dalcour Maclaren (dated February 2025), Sustainable Design & Construction Statement (undated) and Fire Statement (Issue 01) prepared by Bureau Veritas (dated 09/04/2026). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.