3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 139.L.308 (Rev.A), 139.L.316 rev C, 139.L.323, Planning Support Statement, Design and Access Statement, External Air Conditioning Unit Environmental Noise Assessment Report prepared by PC Environmental (Consultants) Ltd (dated 21 May 2026), Sustainable Design and Construction Statement, Air Conditioning Technical Data 5MXM-M, Air Conditioning Technical Data AZAS-MV1. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
FIXED PLANT (COMPLIANCE): The design and installation of new items of fixed plant shall be such that when operating the cumulative noise level LAeq Tr arising from the proposed plant, measured or predicted at 1m from the facade of the nearest noise sensitive premises, shall be a rating level of at least 5dB(A) below the background noise level LAF90 Tbg. The measurement and/or prediction of the noise should be carried out in accordance with the methodology contained within BS 4142:2014+A1:2019. REASON: To ensure that the operation of fixed plant does not impact on residential amenity
FIXED PLANT: You are advised that Islington have a duty to investigate any complaints in terms of statutory nuisance. It is advised that the plant is checked upon installation and regularly checked, maintained and serviced to ensure noise levels do not rise or acoustic character such as tonality, intermittency, impulsivity or other acoustic character develop.
The applicant is advised that this planning permission does not grant rights of access over any part of the building that is outside the applicant's ownership. Any necessary third-party consents or legal rights required to implement the development and maintenance must be obtained separately.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.