Council planning record

Section 73 (Minor Material Amendment) to vary Condition 2 (Approved Drawings) and 3 (Materials) of Planning Consent ref. P2024/3126/FUL (Single storey ground floor rear and side infill extension, creation of second-floor terrace with privacy screening, additional roof light to front roof slope and replacement roof tiles to main roof, tiling of rear dormer rear elevation and revised rear window) dated 08 Jan 2025 to amend extension materials from aluminium cladding to zinc cladding.

9 Battledean Road, London, N5 1UX

FINAL DECISIONReference: P2026/1169/S73London Borough of Islington

Last published check: 2 Oct 2026, 11:37. Check the council record for more recent changes.

Application location

9 Battledean Road, London, N5 1UX

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Removal/Variation of Condition (Section 73)
Received
5 May 2026
Validated
15 May 2026
Determination deadline
29 Jun 2026
Local authority
London Borough of Islington

Application overview

Section 73 (Minor Material Amendment) to vary Condition 2 (Approved Drawings) and 3 (Materials) of Planning Consent ref. P2024/3126/FUL (Single storey ground floor rear and side infill extension, creation of second-floor terrace with privacy screening, additional roof light to front roof slope and replacement roof tiles to main roof, tiling of rear dormer rear elevation and revised rear window) dated 08 Jan 2025 to amend extension materials from aluminium cladding to zinc cladding.

Proposal details

Reference
P2026/1169/S73
Alternative references
PP-14858665
Ward
Highbury
Agent
Victoria Tong
UPRN
5300007468

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 18 of 18

DocumentPublishedAction
Application Form - Without Personal DataApplication Form5 May 2026View
Site PlanDrawings - Existing5 May 2026View
Block planDrawings - Existing5 May 2026View
Sustainability StatementSupporting Documentation5 May 2026View
Front Elevations - Existing and ProposedExisting & Proposed Plans5 May 2026View
FUL Design and access statementDesign and Access Statement5 May 2026View
S73 Covering letterSupporting Documentation5 May 2026View
Community Infrastructure Levy - Completed formSupporting Documentation5 May 2026View
Ground Floor Plan- Existing and ProposedExisting & Proposed Plans5 May 2026View
First Floor Plan- Existing and ProposedExisting & Proposed Plans5 May 2026View
Second Floor Plan - Existing and ProposedExisting & Proposed Plans5 May 2026View
Loft Plan - Existing and ProposedExisting & Proposed Plans5 May 2026View
Roof Plan - Existing and ProposedExisting & Proposed Plans5 May 2026View
Rear Elevations - Existing and ProposedExisting & Proposed Plans5 May 2026View
Side Elevations - Existing and ProposedExisting & Proposed Plans5 May 2026View
Sections - Existing and ProposedExisting & Proposed Plans5 May 2026View
Decision NoticeDecision Notice18 Jun 2026View
Delegated ReportDelegated Report18 Jun 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Dispatch date

    Published milestoneCouncil source
  12. Decision date

    Published milestoneCouncil source
  13. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. S73 - CONSENT LIMITED TO THAT OF ORIGINAL PERMISSION: The development hereby permitted shall be begun not later than the expiration of 08 January 2028. REASON: To ensure the commencement timescale for the development is not extended beyond that of the original planning permission granted on 08 January 2025 (LBI reference P2024/3126/FUL). Furthermore, to comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Site Location Plan, Site Block Plan 9BR-P10, Existing and Proposed Ground Floor Plans 9BR-P01A Rev 1, Existing and Proposed First Floor Plans 9BR-P02A Rev 1, Existing and Proposed Second Floor Plans 9BR-P03A Rev 1, Existing and Proposed Loft Floor Plans 9BR-P04A Rev 1, Existing and Proposed Roof Plans 9BR-P05A Rev 1, Existing and Proposed Front Elevation 9BR-P06, Existing and Proposed Rear Elevations 9BR-P07A Rev 1, Existing and Proposed Side Elevations 9BR-P08A Rev 1, Existing and Proposed Sections 9BR-P09A Rev 1, S73 Cover Letter and Sustainable Design & Construction Statement by TX11 Architects. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.