Installation of two traditional rear dormer windows, replacement of existing windows and doors to front roof extension, restoration of ground floor front sash window, paving of front steps and internal alterations (to include widening of internal door at basement).
Installation of two traditional rear dormer windows, replacement of existing windows and doors to front roof extension, restoration of ground floor front sash window, paving of front steps and internal alterations (to include widening of internal door at basement).
Reference
P2026/1150/FUL
Alternative references
PP-14897803
Ward
Barnsbury
UPRN
5300006701
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: Location Plan; K1011-1600-001 Rev A Proposed Lower Ground Floor; K1011-1600-002 Rev A Proposed Lower Ground Floor; K1011-1600-006 Rev A Proposed Structural Sections; A2767-0600 Rev 03 Proposed Ground Floor; A2767-1501 Rev 01 Proposed First Floor; A2767-1502 Rev 06 Proposed Second Floor; A2767-1503 Rev 03 Proposed Third Floor; A2767-0751 Rev 00 Proposed Section AA; A2767-0800 Rev 03 Proposed Rear Elevation; A2767-0801 Rev 01 Proposed Front Elevation; A2767-0910 Rev 01 Proposed Lower Ground Floor Doors; A2767-0911 Rev 01 Proposed Second Floor Bedroom 02 Doors; A2767-0912 Rev 00 Proposed Third Floor Mansard Doors; A2767-0913 Rev 00 Proposed Second Floor Bedroom 01 Doors; A2767-0914 Rev 01 Proposed Elevation and Section of Dormer Windows; A2767-0951 Rev 01 Proposed Entrance Steps Section; Sustainable Design and Construction Statement [May 2026]; Structural Report [Alan Baxter Partnership LLP; August 2026] REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the approved plans and within the Sustainable Design and Construction Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.