Council planning record

Demolition of existing conservatory and replacement with a single storey infill rear extension; remodelling and rebuilding of existing two storey rear outrigger along with associated reconfiguration of existing flats resulting in change from 4 no. flats (4x 1 bed) to 3 flats no. (2x 1 bed and 1x 1bed) along with relocation of rooflight to existing side extension.

20 Ockendon Road, London

FINAL DECISIONReference: P2026/1135/FULLondon Borough of Islington

Last published check: 2 Oct 2026, 07:16. Check the council record for more recent changes.

Application location

20 Ockendon Road, London

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning Application
Received
29 Apr 2026
Validated
20 May 2026
Determination deadline
8 Jul 2026
Local authority
London Borough of Islington

Application overview

Demolition of existing conservatory and replacement with a single storey infill rear extension; remodelling and rebuilding of existing two storey rear outrigger along with associated reconfiguration of existing flats resulting in change from 4 no. flats (4x 1 bed) to 3 flats no. (2x 1 bed and 1x 1bed) along with relocation of rooflight to existing side extension.

Proposal details

Reference
P2026/1135/FUL
Alternative references
PP-14878977
Ward
Canonbury
Agent
Gosia Sienna
UPRN
5300068777

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
Application Form - Without Personal DataApplication Form29 Apr 2026View
Location planLocation Plan29 Apr 2026View
Flood risk assessmentApplication Supporting Documents29 Apr 2026View
Fire Safety StatementApplication Supporting Documents29 Apr 2026View
Design and access statementApplication Supporting Documents29 Apr 2026View
Existing Front and Side ElevationsDrawings - Existing29 Apr 2026View
Existing Rear and Side ElevationsDrawings - Existing29 Apr 2026View
Existing LG, G, & 1st Floor PlansDrawings - Existing29 Apr 2026View
Existing Second Floor and Roof PlanDrawings - Existing29 Apr 2026View
Existing Section AADrawings - Existing29 Apr 2026View
SDCSApplication Supporting Documents20 May 2026View
Existing and Proposed Drawings Set Rev. BExisting & Proposed20 May 2026View
Existing and Proposed Flats DimensionsApplication Supporting Documents10 Aug 2026View
DNDecision Notice13 Aug 2026View
DRDelegated Report13 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
DN
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 07 Rev. B; 08 Rev. B; 09 Rev. B; 10 Rev. B; 11 Rev. B; 12 Rev. B; 13 Rev. B; 14 Rev. B; 15 Rev. B; 16 Rev. B; Design and Access Statement; Existing and Proposed Flats Dimensions; Sustainable Design & Construction Statement; Flood Risk Assessment; Fire Safety Statement. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. REMOVAL OF PERMITTED DEVELOPMENT RIGHTS (COMPLIANCE): Notwithstanding the provisions of Schedule 2, Part 3, Class L of the Town and Country Planning (General Permitted Developent) Order 2015 (or any other order revoking and re-enacting that Order with or without modifications), no change of use from Class C3 (dwellingshoues to C4 (Houses In Multiple Occupation) shall take place unless otherwise agreed in writing by the Local Planning Authority. REASON: To protect amenity and ensure there is no loss of existing larger homes.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.