Alterations to the existing rear extension involving the excavation of the lower ground floor level and demolition/reconstruction of internal floors to create level access with the main house; formation of new window opening and replacement of existing glazed link and lightwells with new rooflight/lantern; formation of terrace above with associated privacy screen; interior renovation of the lower ground floor (main house) including the removal of the contemporary walls and fittings and all associated works (Listed Building ref: P2026/1129/LBC also submitted)

32 Britton Street, London, EC1M 5NQ

FINAL DECISIONReference: P2026/1128/FULLondon Borough of Islington

Last published check: 2 Oct 2026, 18:05. Check the council record for more recent changes.

Application location

32 Britton Street, London, EC1M 5NQ

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Full Planning (Householder)
Received
30 Apr 2026
Validated
7 May 2026
Determination deadline
24 Jun 2026
Local authority
London Borough of Islington

Application overview

Alterations to the existing rear extension involving the excavation of the lower ground floor level and demolition/reconstruction of internal floors to create level access with the main house; formation of new window opening and replacement of existing glazed link and lightwells with new rooflight/lantern; formation of terrace above with associated privacy screen; interior renovation of the lower ground floor (main house) including the removal of the contemporary walls and fittings and all associated works (Listed Building ref: P2026/1129/LBC also submitted)

Proposal details

Reference
P2026/1128/FUL
Alternative references
PP-14895375
Ward
Clerkenwell
Agent
Mr Ethan Loo
UPRN
5300012017

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 41 of 41

DocumentPublishedAction
Application Form (Redacted)Default30 Apr 2026View
Site Location PlanDefault30 Apr 2026View
Site Location/Block PlanDefault30 Apr 2026View
Fire Safety Reasonable Exemption StatementDefault30 Apr 2026View
Sustainable Design & Construction StatementDefault30 Apr 2026View
Arboricultural Impact AssessmentDefault30 Apr 2026View
Archaeological Desk Based AssessmentDefault30 Apr 2026View
Site Investigation ReportDefault30 Apr 2026View
Structural Engineering ReportDefault30 Apr 2026View
Building Survey ReportDefault30 Apr 2026View
Heritage StatementDefault30 Apr 2026View
CIL FormDefault30 Apr 2026View
Design & Access StatementDefault9 Sept 2026View
Existing Lower Ground Floor PlanDefault11 Sept 2026View
Existing Upper Ground Floor PlanDefault11 Sept 2026View
Existing First Floor PlanDefault11 Sept 2026View
Existing Second Floor PlanDefault11 Sept 2026View
Existing Third Floor PlanDefault11 Sept 2026View
Existing Section AADefault11 Sept 2026View
Existing Section BBDefault11 Sept 2026View
Existing Section CCDefault11 Sept 2026View
Existing South ElevationDefault11 Sept 2026View
Existing West ElevationDefault11 Sept 2026View
Proposed Lower Ground Floor PlanDefault11 Sept 2026View
Proposed Upper Ground Floor PlanDefault11 Sept 2026View
Proposed First Floor PlanDefault11 Sept 2026View
Proposed Second Floor PlanDefault11 Sept 2026View
Proposed Third Floor PlanDefault11 Sept 2026View
Proposed Lower Ground Floor Fire PlanDefault11 Sept 2026View
Proposed Upper Ground Floor Fire PlanDefault11 Sept 2026View
Proposed First Floor Fire PlanDefault11 Sept 2026View
Proposed Second Floor Fire PlanDefault11 Sept 2026View
Proposed Third Floor Fire PlanDefault11 Sept 2026View
Proposed Section AADefault11 Sept 2026View
Proposed Section BBDefault11 Sept 2026View
Proposed Section CCDefault11 Sept 2026View
Proposed Section DDDefault11 Sept 2026View
Proposed South ElevationDefault11 Sept 2026View
Proposed West ElevationDefault11 Sept 2026View
Delegated ReportDelegated Report22 Sept 2026View
Decision NoticeDecision Notice22 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Press notice start date

    Published milestoneCouncil source
  6. Site notice date

    Published milestoneCouncil source
  7. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Statutory expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Publicity end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Site notice end date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Dispatch date

    Published milestoneCouncil source
  13. Decision date

    Published milestoneCouncil source
  14. Extension date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
Decision Notice
Planning conditions
  1. 3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
  2. DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: 071_0000 (Rev. C) – Location Plan, 071_1101 (Rev. E) – Proposed Lower Ground Floor Plan, 071_1102 (Rev. D) – Proposed Upper Ground Floor Plan, 071_1103 (Rev. D) – Proposed First Floor Plan, 071_1104 – Proposed Second Floor Plan, 071_1105 – Proposed Third Floor Plan, 071_1111 – Proposed Lower Ground Floor Fire Plan, 071_1112 – Proposed Upper Ground Floor Fire Plan, 071_1113 – Proposed First Floor Fire Plan, 071_1114 – Proposed Second Floor Fire Plan, 071_1115 – Proposed Third Floor Fire Plan, 071_1201 (Rev. D) – Proposed Section AA, 071_1202 (Rev. D) – Proposed Section BB, 071_1203 (Rev. D) – Proposed Section CC, 071_1204 (Rev. D) – Proposed Section DD, 071_1301 (Rev. D) – Proposed South Elevation, 071_1302 (Rev. C) – Proposed West Elevation, Heritage Design & Access Statement (Rev. B) prepared by Hayatsu Architects (dated July 2026), Heritage Statement prepared by Turley (dated April 2026), Sustainable Design & Construction Statement prepared by Hayatsu Architects (dated April 2026), Arboricultural Report prepared by Crown Tree Consultancy (dated 15/04/2026), Archaeological Desk-Based Assessment prepared by Wessex Archaeology (dated January 2018), Site Investigation Report prepared by Connaughts Site Investigation Ltd (dated 26/01/2018), Structural Report prepared by Bini Struct-E Limited (dated 15/04/2026), Building Survey Report prepared by Gould Baxter (dated July 2023), Fire Reasonable Exemption Statement (undated). REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
  3. MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design and Access Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
  4. CONSTRUCTION MANAGEMENT PLAN (DETAILS): No development shall take place on site unless and until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority. The CMP shall be prepared in accordance with Islington Council's Basement Development SPD (2016). The CMP shall provide details in relation to: (a) proposed programme of works (b) site manager/liaison officer details (c) hours of work (d) access arrangements for vehicles and material storage (e) noise, air quality and vibration control The development shall be carried out strictly in accordance with the CMP so approved and no change therefrom shall take place without the prior written consent of the Local Planning Authority. REASON: To ensure that the development does not adversely impact on neighbouring residential amenity due to its construction and operation.
  5. BASEMENT MONITORING WORKS (COMPLIANCE): The Chartered Civil Engineer (MICE) or Chartered Structural Engineer (MI Struct.E) certifying the Structural Method Statement (dated 15/04/2026) submitted to support the hereby approved development shall be retained (or a replacement person holding equivalent qualifications shall be appointed and retained) for the duration of the development to monitor the safety of the construction stages and to ensure that the long term structural stability of the existing buildings and other nearby buildings are safeguarded, in line with the supporting Structural Method Statement. At no time shall any construction work take place unless a qualified engineer is appointed and retained in accordance with this condition. REASON: To ensure that the construction work carried out is in accordance to the submitted Structural Method Statement for the duration of the construction and maintain compliance with the Islington Basement Development SPD (2016).
  6. WRITTEN SCHEME OF INVESTIGATION (DETAILS): No demolition or development shall take place until a written scheme of investigation (WSI) has been submitted to and approved by the Local Planning Authority in writing (in consultation with Historic England GLAAS). For land that is included within the WSI, no demolition or development shall take place other than in accordance with the agreed WSI, which shall include the statement of significance and research objectives, and: (a) The programme and methodology of site investigation and recording and the nomination of a competent person(s) or organisation to undertake the agreed works (b) Where appropriate, details of a programme for delivering related positive public benefits (c) The programme for post-investigation assessment and subsequent analysis, publication & dissemination and deposition of resulting material. This part of the condition shall not be discharged until these elements have been fulfilled in accordance with the programme set out in the WSI REASON: This pre-commencement condition is necessary to safeguard the archaeological interest on this site. Approval of the WSI before works begin on site provides clarity on what investigations are required, and their timing in relation to the development programme.
  7. TERRACE (DETAILS): Notwithstanding the hereby approved plans, further details of the balustrading shall be submitted to and approved in writing by the Local Planning Authority prior to works commencing on site. The balustrading details to be submitted shall be situated at the rear edge of the terrace and shall demonstrate how it would restrict overlooking of the nearest neighbours of Britton Street. REASON: To prevent undue overlooking (oblique, backwards or otherwise) of neighbouring habitable room windows.
  8. INFORMATIVE: The written scheme of investigation will need to be prepared and implemented by a suitably professionally accredited archaeological practice in accordance with Historic England’s Guidelines for Archaeological Projects in Greater London. This condition (condition no. 5) is exempt from deemed discharge under schedule 6 of The Town and Country Planning (Development Management Procedure) (England) Order 2015.
  9. INFORMATIVE: To ensure compliance with the Building Regulations (including inclusive design and fire safety matters), you should contact the council’s Building Control Service regarding the development and internal and external works.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.