Rear garden, patio, boundary repair, and landscape works, including the removal of a later rear retaining wall, partial excavation and regrading of garden levels, and the installation of proposed retaining structures, patio extension, boundary wall repairs, and landscaping (part retrospective)
Rear garden, patio, boundary repair, and landscape works, including the removal of a later rear retaining wall, partial excavation and regrading of garden levels, and the installation of proposed retaining structures, patio extension, boundary wall repairs, and landscaping (part retrospective)
Reference
P2026/1103/FUL
Alternative references
PP-14881874
Ward
St Mary's & St James'
Agent
Mr Sam De Silva
UPRN
5300012211
Sign in to view all collected council fields and recorded changes.
3 YEAR CONSENT PERIOD: The development hereby permitted shall be begun not later than the expiration of three years from the date of this permission. REASON: To comply with the provisions of Section 91(1)(a) of the Town and Country Planning Act 1990 as amended by the Planning and Compulsory Purchase Act 2004 (Chapter 5).
DRAWING AND DOCUMENT NUMBERS: The development hereby approved shall be carried out in accordance with the following approved plans: FL383 A100 LOCATION PLAN; FL383 A101/1 PROPOSED BLOCK PLAN; FL383 A102 Rev. 01 PRE-EXISTING, EXISTING & PROPOSED GROUND FLOOR PLAN; FL383 A103 Rev. 01 PRE--EXISTING, EXISTING & PROPOSED ROOF PLAN; FL383 A205 PRE-EXISTING, EXISTING & PROPOSED REAR ELEVATION; FL383 A206.1 PROPOSED SIDE ELEVATION A; FL383 A207.1 PROPOSED SIDE ELEVATION B; FL383 A310 PROPOSED SECTION A-A; FL383 SUSTAINABLE DESIGN AND CONSTRUCTION STATEMENT Version 1 (dated 05 May 2026) by F-LINE DESIGNS and FL383 DESIGN, ACCESS AND HERITAGE STATEMENT Version 2 (dated 22 April 2026) by F-LINE DESIGNS. REASON: To comply with Section 70(1)(a) of the Town and Country Act 1990 as amended and the Reason for Grant and also for the avoidance of doubt and in the interest of proper planning.
MATERIALS (COMPLIANCE): The development shall be constructed in accordance with the schedule of materials noted on the plans and within the Design, Access, and Heritage Statement. The development shall be carried out strictly in accordance with the details so approved and shall be maintained as such thereafter. REASON: In the interest of securing sustainable development and to ensure that the resulting appearance and construction of the development is of a high standard.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.