Council planning record

T1 & T2 London Plane trees: Prune both trees to give 2-3m clearance from adjacent buildings, no cuts greater than 60mm in diameter. Crown lift to 6m above ground level all round. Remove deadwood. Pruning indicated in supplied images. Justification for works is to create clearance from buildings and create clearance above highway.

32 Alwyne Road, London

FINAL DECISIONReference: P2026/1003/TRELondon Borough of Islington

Last published check: 3 Oct 2026, 11:42. Check the council record for more recent changes.

Application location

32 Alwyne Road, London

This record has no verified map location.

Application summary

Status
FINAL DECISION
Application type
Works application to tree with Tree Preservation Order
Received
14 Apr 2026
Validated
16 Apr 2026
Determination deadline
10 Jun 2026
Local authority
London Borough of Islington

Application overview

T1 & T2 London Plane trees: Prune both trees to give 2-3m clearance from adjacent buildings, no cuts greater than 60mm in diameter. Crown lift to 6m above ground level all round. Remove deadwood. Pruning indicated in supplied images. Justification for works is to create clearance from buildings and create clearance above highway.

Proposal details

Reference
P2026/1003/TRE
Alternative references
PP-14839301
Ward
Canonbury
Agent
James Walker
UPRN
10090262943

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 7 of 7

DocumentPublishedAction
File Size: 196493, Reference: Application Form - Without Personal DataDefault14 Apr 2026View
File Size: 9376162, Reference: Photographs and photomontagesDefault14 Apr 2026View
File Size: 193058, Reference: Sketch planDefault14 Apr 2026View
File Size: 7040377, Reference: Photographs and photomontagesDefault14 Apr 2026View
File Size: 8588578, Reference: Photographs and photomontagesDefault14 Apr 2026View
32_Alwyne_Road.pdfDelegated Report22 May 2026View
853204-853203T-_Decision_Notice_-AP8_333_v1.pdfTrees - Final Decision Note22 May 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application date

    Published milestoneCouncil source
  2. Received date

    Published milestoneCouncil source
  3. Registration date

    Published milestoneCouncil source
  4. Valid date

    Published milestoneCouncil source
  5. Decision date

    Published milestoneCouncil source
  6. Dispatch date

    Published milestoneCouncil source
  7. Decision due date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approve with conditions
853204-853203T-_Decision_Notice_-AP8_333_v1.pdf
Planning conditions
  1. TREE WORKS (COMPLIANCE): All tree work shall be carried out in accordance with British Standard BS3998 - Recommendations for Tree Work. In addition: a) No fires shall be lit within [10] metres of the nearest point of the canopy of any retained tree. No equipment, machinery or structure shall be attached to or supported by a retained tree. b) No mixing of cement or use of other contaminating materials or substances shall take place within, or close enough to, a root protection area that seepage or displacement could cause them to enter a root protection area. c) No alterations or variations to the approved works or tree protection schemes shall be made without prior written consent of the local planning authority. REASON: In the interest of the protection of trees and to safeguard visual amenities.
Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.